E F Barrett
McCarthy Road, Island Park, NY 11558Plant Summary Information
E F Barrett is ranked #22 out of 944 power plants in New York in terms of total annual net electricity generation.
E F Barrett is comprised of 13 generators and generated 298.3 GWh during the 3-month period between May 2025 to August 2025.
| Plant Name | E F Barrett |
|---|---|
| Utility Name | National Grid Generation LLC |
| Location | Nassau County, NY |
| Initial Operation Date | November 1956 |
| Last Update | Aug 2025 |
| Annual Generation | 1.2 TWh |
| Annual Consumption | 16.0 M MMBtu |
| Ranked #662 out of 12,529 Power Plants Nationwide | |
| Ranked #412 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #22 out of 944 New York Power Plants | |
| Ranked #17 out of 115 New York Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 98.8% Residual Fuel Oil : 1.0% |
Map of E F Barrett
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for E F Barrett.
Monthly Net Generation for E F Barrett
E F Barrett Details
| Summary Information | |
|---|---|
| Plant Name | E F Barrett (2511) |
| Plant Address | McCarthy Road, Island Park, NY 11558 |
| Utility | National Grid Generation LLC (56505) |
| Latitude, Longitude | 40.61669, -73.64788 |
| Generation Dates on File | Jan 2001 to Aug 2025 |
| Initial Operation Date | November 1956 |
| Annual Generation | 1.2 TWh |
| Fuel Types | Natural Gas : 98.8% Residual Fuel Oil : 1.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Barnum Island Channel |
| Ash Impoundment | Yes Lined Operating |
| Transmission / Distribution Owner | Long Island Power Authority (11171) NY |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Name | TRANSCONTINENTAL GAS PIPELINE |
| Pipeline Notes | KEDLI |
| Natural Gas Storage | No |
Generator ST1 Details Operating November 1956
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23545 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23545 |
| Nameplate Capacity | 188 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 194.2 MW |
| Winter Capacity | 199.5 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1956 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / RFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 194.2 MW |
| Net Winter Capacity With Natural Gas | 199.5 MW |
| Net Summer Capacity With Oil | 194.2 MW |
| Net Winter Capacity With Oil | 199.5 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator ST2 Details Operating October 1963
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23546 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23546 |
| Nameplate Capacity | 188 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178 MW |
| Winter Capacity | 190.5 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 1963 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / RFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 178 MW |
| Net Winter Capacity With Natural Gas | 190.5 MW |
| Net Summer Capacity With Oil | 178 MW |
| Net Winter Capacity With Oil | 190.5 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 3 Details Operating June 1970
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23706 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23706 |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 17.7 MW |
| Winter Capacity | 20.2 MW |
| Minimum Load | 10.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1970 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 17.7 MW |
| Net Winter Capacity With Natural Gas | 20.2 MW |
| Net Summer Capacity With Oil | 17.7 MW |
| Net Winter Capacity With Oil | 20.2 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator GT1 Details Operating June 1970
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23704 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23704 |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 17.4 MW |
| Winter Capacity | 20.5 MW |
| Minimum Load | 10.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1970 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 17.4 MW |
| Net Winter Capacity With Natural Gas | 20.5 MW |
| Net Summer Capacity With Oil | 17.4 MW |
| Net Winter Capacity With Oil | 20.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator GT2 Details Operating June 1970
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23705 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23705 |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 17.6 MW |
| Winter Capacity | 20.4 MW |
| Minimum Load | 9 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1970 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 17.6 MW |
| Net Winter Capacity With Natural Gas | 20.4 MW |
| Net Summer Capacity With Oil | 17.6 MW |
| Net Winter Capacity With Oil | 20.4 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 4 Details Operating July 1970
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23707 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23707 |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 20.5 MW |
| Minimum Load | 11.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1970 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 20.5 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 20.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 5 Details Operating July 1970
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23708 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23708 |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 17.6 MW |
| Winter Capacity | 20.1 MW |
| Minimum Load | 11 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1970 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 17.6 MW |
| Net Winter Capacity With Natural Gas | 20.1 MW |
| Net Summer Capacity With Oil | 17.6 MW |
| Net Winter Capacity With Oil | 20.1 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 6 Details Operating July 1970
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23709 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23709 |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 16.4 MW |
| Winter Capacity | 19.9 MW |
| Minimum Load | 11.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1970 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 16.4 MW |
| Net Winter Capacity With Natural Gas | 19.9 MW |
| Net Summer Capacity With Oil | 16.4 MW |
| Net Winter Capacity With Oil | 19.9 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 8 Details Operating July 1970
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23711 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23711 |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 15.1 MW |
| Winter Capacity | 15.2 MW |
| Minimum Load | 11.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1970 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 15.1 MW |
| Net Winter Capacity With Natural Gas | 15.2 MW |
| Net Summer Capacity With Oil | 15.1 MW |
| Net Winter Capacity With Oil | 15.2 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 10 Details Operating June 1971
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23701 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23701 |
| Nameplate Capacity | 41.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 40.6 MW |
| Winter Capacity | 50 MW |
| Minimum Load | 30 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1971 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 40.6 MW |
| Net Winter Capacity With Natural Gas | 50 MW |
| Net Summer Capacity With Oil | 40.6 MW |
| Net Winter Capacity With Oil | 50 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 11 Details Operating June 1971
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23702 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23702 |
| Nameplate Capacity | 41.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 40.1 MW |
| Winter Capacity | 50.5 MW |
| Minimum Load | 30 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1971 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 40.1 MW |
| Net Winter Capacity With Natural Gas | 50.5 MW |
| Net Summer Capacity With Oil | 40.1 MW |
| Net Winter Capacity With Oil | 50.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 12 Details Operating June 1971
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23703 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23703 |
| Nameplate Capacity | 41.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 40.9 MW |
| Winter Capacity | 48.7 MW |
| Minimum Load | 30 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1971 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 40.9 MW |
| Net Winter Capacity With Natural Gas | 48.7 MW |
| Net Summer Capacity With Oil | 40.9 MW |
| Net Winter Capacity With Oil | 48.7 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 9 Details Operating June 1971
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23700 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23700 |
| Nameplate Capacity | 41.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 41.2 MW |
| Winter Capacity | 49.2 MW |
| Minimum Load | 29.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1971 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 41.2 MW |
| Net Winter Capacity With Natural Gas | 49.2 MW |
| Net Summer Capacity With Oil | 41.2 MW |
| Net Winter Capacity With Oil | 49.2 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
E F Barrett Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| We couldn't locate any owners for this plant | |||
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #402 | LaO Energy Systems | Plaquemine, LA | 1.4 TWh |
| #403 | S O Purdom | St Marks, FL | 1.2 TWh |
| #404 | El Segundo Cogen | El Segundo, CA | 1.2 TWh |
| #405 | Holland Energy Facility | Beecher City, IL | 1.2 TWh |
| #406 | Apex Generating Station | Las Vegas, NV | 1.2 TWh |
| #407 | Wilkes | Avinger, TX | 1.2 TWh |
| #408 | Ocean State Power | Harrisville, RI | 1.2 TWh |
| #409 | Grays Ferry Cogeneration | Philadelphia, PA | 1.2 TWh |
| #410 | Riverside (MN) | Minneapolis, MN | 1.2 TWh |
| #411 | Johnsonville | New Johnsonville, TN | 1.2 TWh |
| #413 | Black Hawk Station | Borger, TX | 1.3 TWh |
| #414 | Santa Rosa Energy Center | Pace, FL | 1.2 TWh |
| #415 | Montana Power Station | El Paso, TX | 1.2 TWh |
| #416 | Crockett Cogen Project | Crockett, CA | 1.2 TWh |
| #417 | Armstrong | Shelocta, PA | 1.2 TWh |
| #418 | Cordova Energy | Cordova, IL | 1.2 TWh |
| #419 | Harry L. Oswald | Little Rock, AR | 1.1 TWh |
| #420 | Port Westward Unit 2 | Clatskanie, OR | 1.1 TWh |
| #421 | Deer Creek Station | White, SD | 1.1 TWh |
| #422 | El Centro Hybrid | El Centro, CA | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding E F Barrett.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Altice - Hicksville | Hicksville, NY | 16.0 GWh | 12.4 mi |
| Bayswater Peaking Facility LLC | Far Rockaway, NY | 42.5 GWh | 6 mi |
| Bethpage Power Plant | Hicksville, NY | 573.5 GWh | 11.9 mi |
| Bloom-Altice Fuel Cell | Bethpage,, NY | 15.6 GWh | 12.8 mi |
| Cedar Creek PV | Seaford, NY | 2.8 GWh | 7.7 mi |
| Charles P Keller | Rockville Centre, NY | 123.0 MWh | 2.9 mi |
| Covanta Hempstead | Westbury, NY | 600.7 GWh | 9 mi |
| Equus Freeport Power | Village of Freeport, NY | 45.4 GWh | 4.6 mi |
| Glenwood | Glenwood Landing, NY | 2.6 GWh | 14.5 mi |
| Jamaica Bay Peaking | Far Rockaway, NY | 24.5 GWh | 6 mi |
| Kennedy International Airport Cogen | Jamaica, NY | 398.6 GWh | 7 mi |
| Kings Plaza Total Energy Plant (TEP) | Brooklyn, NY | 22.4 GWh | 14.3 mi |
| MER Queens | Elmhurst, NY | 9.7 GWh | 14.2 mi |
| Mount Sinai South Nassau Hospital | Oceanside, NY | 10.8 MWh | 2.6 mi |
| NYPH-Queens | Flushing, NY | 714.0 MWh | 13.1 mi |
| Plant No 1 Freeport | Freeport, NY | 17.0 MWh | 4 mi |
| Plant No 2 Freeport | Freeport, NY | 31.1 GWh | 4.6 mi |
| South Oaks Hospital | Amityville, NY | 6.8 GWh | 12.6 mi |
| St. Johns Episcopal Hospital | Far Rockaway, NY | 8.0 MWh | 5.7 mi |
| St. Mary's Hospital For Children | Bayside, NY | 54.0 MWh | 12.8 mi |