Tenaska Gateway Generating Station
State Hwy 315 PO Box 697, Mt. Enterprise, TX 75681Plant Summary Information
Tenaska Gateway Generating Station is ranked #63 out of 298 natural gas power plants in Texas in terms of total annual net electricity generation.
Tenaska Gateway Generating Station is comprised of 4 generators and generated 800.9 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Tenaska Gateway Generating Station |
---|---|
Utility Name | Tenaska Gateway Partners Ltd |
Location | Rusk County, TX |
Initial Operation Date | July 2001 |
Last Update | Mar 2025 |
Annual Generation | 1.7 TWh |
Annual Consumption | 14.5 M MMBtu |
Ranked #566 out of 11,623 Power Plants Nationwide | |
Ranked #355 out of 2,187 Natural Gas Power Plants Nationwide | |
Ranked #82 out of 769 Texas Power Plants | |
Ranked #63 out of 298 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Tenaska Gateway Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tenaska Gateway Generating Station.
Monthly Net Generation for Tenaska Gateway Generating Station
Tenaska Gateway Generating Station Details
Summary Information | |
---|---|
Plant Name | Tenaska Gateway Generating Station (55132) |
Plant Address | State Hwy 315 PO Box 697, Mt. Enterprise, TX 75681 |
Utility | Tenaska Gateway Partners Ltd (18518) |
Latitude, Longitude | 32.01783, -94.61974 |
Generation Dates on File | Jul 2001 to Mar 2025 |
Initial Operation Date | July 2001 |
Annual Generation | 1.7 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-15-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Sabine River |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
KINDER MORGAN TEJAS PIPELINE LLC Other - Please explain in pipeline notes below. |
Pipeline Notes | ADD MOMENTUM PIPELINES EAST TEXAS |
Natural Gas Storage | No |
Generator GTG1 Details Operating July 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | TGCCS_CC1 |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 146 MW |
Winter Capacity | 167 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 145 MW |
Net Winter Capacity With Natural Gas | 165 MW |
Net Summer Capacity With Oil | 140 MW |
Net Winter Capacity With Oil | 140 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator GTG2 Details Operating July 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | TGCCS_CC1 |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 148 MW |
Winter Capacity | 169 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 145 MW |
Net Winter Capacity With Natural Gas | 165 MW |
Net Summer Capacity With Oil | 140 MW |
Net Winter Capacity With Oil | 140 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator GTG3 Details Operating July 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | TGCCS_CC1 |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 146 MW |
Winter Capacity | 167 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 145 MW |
Net Winter Capacity With Natural Gas | 165 MW |
Net Summer Capacity With Oil | 140 MW |
Net Winter Capacity With Oil | 140 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator STG1 Details Operating July 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | STG1 |
Ownership | Jointly Owned |
Duct Burners | Yes |
RTO ISO LMP Node Designation | TGCCS_CC1 |
Nameplate Capacity | 390 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 405 MW |
Winter Capacity | 405 MW |
Minimum Load | 190 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Tenaska Gateway Generating Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Tenaska Rusk Partners, LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 59.40% |
Tenaska VII Partners, LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.78% |
TC Gateway GP, LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.22% |
Tenaska Gateway Investments, LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 39.60% |
Tenaska Rusk Partners, LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 59.40% |
Tenaska VII Partners, LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.78% |
TC Gateway GP, LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.22% |
Tenaska Gateway Investments, LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 39.60% |
Tenaska Rusk Partners, LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 59.40% |
Tenaska VII Partners, LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.78% |
TC Gateway GP, LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.22% |
Tenaska Gateway Investments, LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 39.60% |
Tenaska Rusk Partners, LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 59.40% |
Tenaska VII Partners, LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 0.78% |
TC Gateway GP, LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 0.22% |
Tenaska Gateway Investments, LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 39.60% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#345 | Edwardsport | Edwardsport, IN | 3.5 TWh |
#346 | Houston Chemical Complex Battleground | Houston, TX | 1.7 TWh |
#347 | Freeport Energy | Freeport, TX | 1.7 TWh |
#348 | Beaver | Clatskanie, OR | 1.7 TWh |
#349 | Barney M Davis | Corpus Christi, TX | 1.7 TWh |
#350 | Langley Gulch Power Plant | New Plymouth, ID | 1.7 TWh |
#351 | James E. Rogers Energy Complex | Cliffside, NC | 4.3 TWh |
#352 | Cunningham | Hobbs, NM | 1.7 TWh |
#353 | Sutter Energy Center | Yuba City, CA | 1.7 TWh |
#354 | Ferndale Generating Station | Ferndale, WA | 1.7 TWh |
#356 | Tiverton Power Plant | Tiverton, RI | 1.7 TWh |
#357 | Nueces Bay | Corpus Christi, TX | 1.6 TWh |
#358 | Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.6 TWh |
#359 | Valley (CA) | Sun Valley, CA | 1.6 TWh |
#360 | Stanton Energy Center | Orlando, FL | 4.1 TWh |
#361 | E C Gaston | Wilsonville, AL | 3.6 TWh |
#362 | Trimble County | Bedford, KY | 9.3 TWh |
#363 | Northside Generating Station | Jacksonville, FL | 2.7 TWh |
#364 | Shell Chemical Appalachia LLC | Monaca, PA | 1.6 TWh |
#365 | Theodore Cogen Facility | Theodore, AL | 1.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tenaska Gateway Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ADA Carbon Solutions Red River | Coushatta, LA | 97.3 GWh | 72 mi |
Arsenal Hill | Shreveport, LA | 188.6 GWh | 60.9 mi |
Eastman Cogeneration Facility | Longview, TX | 2.8 TWh | 30 mi |
Freestone Energy Center | Fairfield, TX | 6.6 TWh | 88 mi |
Harrison County Power Project | Marshall, TX | 2.8 TWh | 28.2 mi |
Hecate Energy Upshur Rural LLC | Ore City, TX | 4.8 GWh | 57.4 mi |
International Paper Red River Mill | Campti, LA | 370.6 GWh | 85.2 mi |
J Lamar Stall Unit | Shreveport, LA | 3.2 TWh | 61 mi |
Kellam Solar | Ben Wheeler, TX | 108.8 GWh | 71.4 mi |
Knox Lee | Longview, TX | 476.6 GWh | 24.8 mi |
Lieberman | Mooringsport, LA | 155.8 GWh | 61.1 mi |
Mansfield Mill | Mansfield, LA | 761.2 GWh | 63 mi |
Martin Lake | Tatum, TX | 9.0 TWh | 17 mi |
Nacogdoches Power | Cushing, TX | 191.0 GWh | 20.9 mi |
Sam Rayburn Dam | Jasper, TX | 106.5 GWh | 72.7 mi |
Snider Industries | Marshall, TX | 11.5 GWh | 41.1 mi |
Stryker Creek | Jacksonville, TX | 1.1 TWh | 22.3 mi |
Trinidad (TX) | Trinidad, TX | 330.6 GWh | 87.1 mi |
Welsh | Pittsburg, TX | 4.5 TWh | 72.8 mi |
Wilkes | Avinger, TX | 1.1 TWh | 57.5 mi |