Southcentral Power Project
5601 Electron Dr., Anchorage, AK 99519Plant Summary Information
Southcentral Power Project is ranked #1 out of 127 power plants in Alaska in terms of total annual net electricity generation.
Southcentral Power Project is comprised of 4 generators and generated 287.6 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Southcentral Power Project |
|---|---|
| Utility Name | Chugach Electric Assn Inc |
| Location | Anchorage Municipality, AK |
| Initial Operation Date | January 2013 |
| Last Update | Dec 2024 |
| Annual Generation | 986.1 GWh |
| Annual Consumption | 9.2 M MMBtu |
| Ranked #747 out of 12,539 Power Plants Nationwide | |
| Ranked #440 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #1 out of 127 Alaska Power Plants | |
| Ranked #1 out of 13 Alaska Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Southcentral Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Southcentral Power Project.
Monthly Net Generation for Southcentral Power Project
Southcentral Power Project Details
| Summary Information | |
|---|---|
| Plant Name | Southcentral Power Project (57036) |
| Plant Address | 5601 Electron Dr., Anchorage, AK 99519 |
| Utility | Chugach Electric Assn Inc (3522) |
| Latitude, Longitude | 61.16742, -149.9053 |
| Generation Dates on File | Jan 2013 to Dec 2024 |
| Initial Operation Date | January 2013 |
| Annual Generation | 986.1 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | |
| Balancing Authority | () |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | AWWU |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Chugach Electric Assn Inc (3522) AK |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | ALASKA PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator 1 Details Operating January 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC10 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 48.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.8 MW |
| Winter Capacity | 48.8 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2013 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 2 Details Operating January 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC10 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 48.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.8 MW |
| Winter Capacity | 48.8 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2013 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 3 Details Operating January 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC10 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 48.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.8 MW |
| Winter Capacity | 48.8 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2013 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 4 Details Operating January 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC10 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| Nameplate Capacity | 57.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 50.3 MW |
| Winter Capacity | 57 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2013 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Southcentral Power Project Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Anchorage Municipal Light and Power | 1200 East First Avenue, Anchorage, AK 99501 | Generator 1 | 30.00% |
| Chugach Electric Assn Inc | 5601 Electron Drive, Anchorage, AK 99519 | Generator 1 | 70.00% |
| Anchorage Municipal Light and Power | 1200 East First Avenue, Anchorage, AK 99501 | Generator 2 | 30.00% |
| Chugach Electric Assn Inc | 5601 Electron Drive, Anchorage, AK 99519 | Generator 2 | 70.00% |
| Anchorage Municipal Light and Power | 1200 East First Avenue, Anchorage, AK 99501 | Generator 3 | 30.00% |
| Chugach Electric Assn Inc | 5601 Electron Drive, Anchorage, AK 99519 | Generator 3 | 70.00% |
| Anchorage Municipal Light and Power | 1200 East First Avenue, Anchorage, AK 99501 | Generator 4 | 30.00% |
| Chugach Electric Assn Inc | 5601 Electron Drive, Anchorage, AK 99519 | Generator 4 | 70.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #430 | Michigan Power LP | Ludington, MI | 1.1 TWh |
| #431 | Madison | Trenton, OH | 1.0 TWh |
| #432 | Sim Gideon | Bastrop, TX | 1.0 TWh |
| #433 | Graham | Graham, TX | 1.0 TWh |
| #434 | Shawville | Shawville, PA | 1.0 TWh |
| #435 | Riverside (MN) | Minneapolis, MN | 1.0 TWh |
| #436 | Tiger Bay | Ft. Meade, FL | 1.0 TWh |
| #437 | Tracy Combined Cycle Power Plant | Tracy, CA | 1.0 TWh |
| #438 | Anderson | Anderson, IN | 1.0 TWh |
| #439 | Troy Energy LLC | Luckey, OH | 988.6 GWh |
| #441 | Greenwood (MI) | Avoca, MI | 983.9 GWh |
| #442 | Riverside (OK) | Jenks, OK | 948.7 GWh |
| #443 | Richmond Cogen | Richmond, CA | 969.6 GWh |
| #444 | Delaware City Plant | Delaware City, DE | 1.1 TWh |
| #445 | Shell Deer Park | Deer Park, TX | 1.2 TWh |
| #446 | Air Products Port Arthur | Port Arthur, TX | 998.1 GWh |
| #447 | Bayonne Energy Center | Bayonne, NJ | 924.9 GWh |
| #448 | George M Sullivan Generation Plant 2 | Anchorage, AK | 923.3 GWh |
| #449 | Stryker Creek | Jacksonville, TX | 921.7 GWh |
| #450 | Rio Grande | SunLand Park, NM | 920.0 GWh |
Nearby Power Plants
Below are closest 15 power plants surrounding Southcentral Power Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bernice Lake | Nikiski, AK | 1.3 GWh | 59.6 mi |
| Bradley Lake | Homer, AK | 397.1 GWh | 102.2 mi |
| Cooper Lake | Cooper Landing, AK | 38.1 GWh | 54.2 mi |
| Eklutna Generation Station | Chugiak, AK | 573.0 GWh | 27.2 mi |
| Eklutna Hydro Project | Palmer, AK | 120.4 GWh | 32.9 mi |
| Fire Island Wind | Anchorage, AK | 49.4 GWh | 11.6 mi |
| George M Sullivan Generation Plant 2 | Anchorage, AK | 923.3 GWh | 7.6 mi |
| Hank Nikkels Plant 1 | Anchorage, AK | 41.2 GWh | 4 mi |
| Houston Solar | Houston, AK | 7.8 GWh | 29.4 mi |
| JBER Landfill Gas Power Plant | Anchorage, AK | 43.6 GWh | 12.8 mi |
| Nikiski Combined Cycle | Nikiski, AK | 414.8 GWh | 60 mi |
| Seldovia | Seldovia, AK | 68.0 MWh | 134.5 mi |
| Seward (AK) | Seward, AK | 393.0 MWh | 73.4 mi |
| Soldotna | Soldotna, AK | 42.1 GWh | 59 mi |
| Tesoro Kenai Cogeneration Plant | Kenai, AK | 40.5 GWh | 60 mi |