Rawhide Prairie Solar Hybrid
3100 E County Road 82, Wellington, CO 80549Plant Summary Information
Rawhide Prairie Solar Hybrid is ranked #17 out of 153 solar farms in Colorado in terms of total annual net electricity generation.
Rawhide Prairie Solar Hybrid generated 6.6 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Rawhide Prairie Solar Hybrid |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Larimer County, CO |
Initial Operation Date | March 2021 |
Last Update | Dec 2024 |
Annual Generation | 43.7 GWh |
Annual Consumption | 155.8 k MMBtu |
Ranked #4,194 out of 12,312 Power Plants Nationwide | |
Ranked #1,001 out of 6,191 Solar Power Plants Nationwide | |
Ranked #82 out of 283 Colorado Power Plants | |
Ranked #17 out of 153 Colorado Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
CO Buffalo Flats LLC (2019 to 2019) Greenbacker Renewable Energy Corporation (2020 to 2024) |
Map of Rawhide Prairie Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rawhide Prairie Solar Hybrid.
Monthly Net Generation for Rawhide Prairie Solar Hybrid
Rawhide Prairie Solar Hybrid Details
Summary Information | |
---|---|
Plant Name | Rawhide Prairie Solar Hybrid (63722) |
Plant Address | 3100 E County Road 82, Wellington, CO 80549 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 40.85798, -105.01556 |
Generation Dates on File | Mar 2021 to Dec 2024 |
Initial Operation Date | March 2021 |
Annual Generation | 43.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Platte River Power Authority (15143) |
Grid Voltage | 34.50 kV |
Energy Storage | Yes |
Generator BA1 Details Operating March 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 12H |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 2 |
---|---|
Maximum Charge Rate | 1 MW |
Maximum Discharge Rate | 1 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1 |
Storage Enclosure Type | CS |
System Peak Shaving | P |
Load Management | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 63722 |
Direct Support Gen Id | PV1 |
Support T D Asset | No |
Generator PV1 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Summer Capacity | 22 MW |
Winter Capacity | 22 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 60 |
DC Net Capacity | 29.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 29.1 MW |
Virtual Net Metering Agreement | No |
Rawhide Prairie Solar Hybrid Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#991 | Whitney Point Solar | Five Points, CA | 44.4 GWh |
#992 | Arbor Hill Solar | Greenfield, IA | 44.4 GWh |
#993 | Westmoreland County Solar Project | WARSAW, VA | 44.4 GWh |
#994 | White River Solar | Alpaugh, CA | 44.3 GWh |
#995 | American Falls Solar II | American Falls, ID | 44.3 GWh |
#996 | RE Kent South, LLC | Lemoore, CA | 44.3 GWh |
#997 | Chino Valley Solar | Chino Valley, AZ | 41.0 GWh |
#998 | Fort Gordon Solar Facility | Fort Gordon, GA | 44.0 GWh |
#999 | Avalon Solar II | Sahuarita, AZ | 43.8 GWh |
#1000 | Orchard Ranch Solar | Orchard, ID | 43.7 GWh |
#1002 | Calverton Solar Energy Center | Calverton, NY | 43.7 GWh |
#1003 | Pavant Solar III | Filmore, UT | 43.6 GWh |
#1004 | SR Arlington I | Arlington, GA | 43.5 GWh |
#1005 | Greater Sandhill I | Mosca, CO | 43.4 GWh |
#1006 | Tinton Falls Solar Farm | Tinton Falls, NJ | 43.3 GWh |
#1007 | Gaston Solar Power Plant | Cherryville Township, NC | 42.8 GWh |
#1008 | Adams Nielson Solar | Lind, WA | 42.8 GWh |
#1009 | Paulsell | Crows Landing, CA | 40.2 GWh |
#1010 | Energix Leatherwood, LLC | Axton, VA | 42.3 GWh |
#1011 | Decatur County Solar Project | Bainbridge, GA | 42.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rawhide Prairie Solar Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alden Solar CSG LLC | Greeley, CO | 2.6 GWh | 35.9 mi |
Big Thompson | Loveland, CO | 4.0 GWh | 32.1 mi |
Bison Solar LLC | Wellington, CO | 60.7 GWh | 0.5 mi |
Cheyenne Prairie Generating Station | Cheyenne, WY | 474.7 GWh | 24 mi |
Corriedale Wind Energy | Cheyenne, WY | 218.1 GWh | 17.7 mi |
Coyote Ridge Community Solar | Fort Collins, CO | 3.2 GWh | 25.4 mi |
ECA CO Greeley | Greeley, CO | 78.0 MWh | 30.4 mi |
Happy Jack Windpower Project | Cheyenne, WY | 61.7 GWh | 19.5 mi |
Oak Leaf Solar XXVII LLC | Greely, CO | 3.5 GWh | 35 mi |
Rawhide | Wellington, CO | 1.4 TWh | 0.4 mi |
Roundhouse Renewable Energy II | Granite, WY | 388.4 GWh | 13.6 mi |
Roundhouse Wind Energy Project | Cheyenne, WY | 847.2 GWh | 17.1 mi |
RV CSU Power II LLC | Fort Collins, CO | 2.7 GWh | 19.6 mi |
RV CSU Power LLC | Fort Collins, CO | 1.8 GWh | 19.7 mi |
Silver Sage Windpower | Cheyenne, WY | 112.3 GWh | 18.8 mi |
Skylark | Severance, CO | 9.1 GWh | 20.4 mi |
South Cheyenne Solar | South Greeley, WY | 336.7 GWh | 17.1 mi |
SR Skylark B | Severance, CO | 4.0 GWh | 20.2 mi |
SR Skylark C | Windsor, CO | 2.3 GWh | 20.5 mi |
Valley View Solar | Greeley, CO | 9.2 GWh | 31 mi |