Sumpter Energy Associates
26981 Elwell Road, Belleville, MI 48111Plant Summary Information
Sumpter Energy Associates is ranked #22 out of 281 landfill gas power plants nationwide in terms of total annual net electricity generation.
Sumpter Energy Associates is comprised of 14 generators and generated 12.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Sumpter Energy Associates |
|---|---|
| Utility Name | NextEra Renewable Fuels, LLC |
| Location | Wayne County, MI |
| Initial Operation Date | July 1992 |
| Last Update | Dec 2025 |
| Annual Generation | 52.5 GWh |
| Annual Consumption | 823.9 k MMBtu |
| Ranked #4,150 out of 13,081 Power Plants Nationwide | |
| Ranked #22 out of 281 Landfill Gas Power Plants Nationwide | |
| Ranked #103 out of 269 Michigan Power Plants | |
| Ranked #3 out of 22 Michigan Landfill Gas Power Plants | |
| Fuel Types | Landfill Gas |
| Previous Operators |
LES Project Holdings LLC (2013 to 2020) EPP Renewable Energy (2021 to 2023) NextEra Renewable Fuels, LLC (2024 to 2025) |
Map of Sumpter Energy Associates
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sumpter Energy Associates.
Monthly Net Generation for Sumpter Energy Associates
Monthly Plant Fuel Consumption for Sumpter Energy Associates
Sumpter Energy Associates Details
| Summary Information | |
|---|---|
| Plant Name | Sumpter Energy Associates (54536) |
| Plant Address | 26981 Elwell Road, Belleville, MI 48111 |
| Utility | NextEra Renewable Fuels, LLC (57249) |
| Latitude, Longitude | 42.10567, -83.49885 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | July 1992 |
| Annual Generation | 52.5 GWh |
| Fuel Types | Landfill Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 91-91-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | DTE Electric Company (5109) MI |
| Grid Voltage | 40.00 kV |
| Energy Storage | No |
Generator 0386 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0388 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0389 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0392 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0435 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0437 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0440 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0447 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0464 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0467 Details Operating July 1992
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0202 Details Operating July 1998
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1998 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0203 Details Operating July 1998
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1998 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0204 Details Operating July 1998
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1998 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 0205 Details Operating July 1998
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1998 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Sumpter Energy Associates Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Nearby Power Plants
Below are closest 20 power plants surrounding Sumpter Energy Associates.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Dearborn Energy Center | Dearborn, MI | 237.3 GWh | 19 mi |
| Dearborn Industrial Generation | Dearborn, MI | 4.9 TWh | 22.3 mi |
| Delray | Detroit, MI | 145.1 GWh | 24.2 mi |
| Domino Farms Solar | Ann Arbor, MI | 844.0 MWh | 17.7 mi |
| East. Michigan Univ. Heating Plant | Ypsilanti, MI | 33.1 GWh | 11.9 mi |
| Fermi | Frenchtown Twp, MI | 8.1 TWh | 15.8 mi |
| French Landing Dam | Belleville, MI | 5.2 GWh | 8.1 mi |
| GRS Arbor Hills | Northville, MI | 1.2 GWh | 20.2 mi |
| Hendershot Solar, LLC | Tecumseh, MI | 4.1 GWh | 21.7 mi |
| IKEA Canton Rooftop PV System | Canton, MI | 264.0 MWh | 15.5 mi |
| Monroe (MI) | Monroe, MI | 15.8 TWh | 16.8 mi |
| O'Shea Solar Farm | Detroit, MI | 2.9 GWh | 24.2 mi |
| Riverview Energy Systems | Riverview, MI | 1.1 GWh | 15.2 mi |
| Sumpter | Belleville, MI | 290.9 GWh | 4.6 mi |
| Superior | Superior Twp, MI | 789.0 MWh | 13.2 mi |
| Temperance Solar, LLC | Erie, MI | 42.2 GWh | 24.4 mi |
| University of Michigan | Ann Arbor, MI | 232.3 GWh | 17.1 mi |
| Warner Lambert | Ann Arbor, MI | 24.2 GWh | 17.1 mi |
| White Tail Solar | Milan, MI | 99.0 GWh | 8 mi |
| Wyandotte | Wyandotte, MI | 110.0 MWh | 19.4 mi |