Corriedale Wind Energy
1877 Happy Jack Road, Cheyenne, WY 92009Plant Summary Information
Corriedale Wind Energy is ranked #36 out of 69 power plants in Wyoming in terms of total annual net electricity generation.
Corriedale Wind Energy generated 49.2 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Corriedale Wind Energy |
|---|---|
| Utility Name | Black Hills Service Company LLC |
| Location | Laramie County, WY |
| Initial Operation Date | November 2020 |
| Last Update | Jul 2026 |
| Annual Generation | 224.5 GWh |
| Annual Consumption | 811.2 k MMBtu |
| Ranked #2,428 out of 13,285 Power Plants Nationwide | |
| Ranked #724 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #36 out of 69 Wyoming Power Plants | |
| Ranked #22 out of 27 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
Map of Corriedale Wind Energy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Corriedale Wind Energy.
Monthly Net Generation for Corriedale Wind Energy
Monthly Plant Fuel Consumption for Corriedale Wind Energy
Corriedale Wind Energy Details
| Summary Information | |
|---|---|
| Plant Name | Corriedale Wind Energy (63436) |
| Plant Address | 1877 Happy Jack Road, Cheyenne, WY 92009 |
| Utility | Black Hills Service Company LLC (56771) |
| Latitude, Longitude | 41.1133, -104.98401 |
| Generation Dates on File | Nov 2020 to Jul 2026 |
| Initial Operation Date | November 2020 |
| Annual Generation | 224.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Cheyenne Light Fuel & Power d/b/a Black (3461) WY |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator WTG Details Operating November 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 52.5 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 52.5 MW |
| Winter Capacity | 52.5 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2020 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 21 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 21 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.5-127 |
| Design Wind Speed | 20 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 292 |
Corriedale Wind Energy Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Cheyenne Light Fuel & Power | 7001 MT. Rushmore Rd, Rapid City, SD 57702 | 38.00% |
| Black Hills Power, Inc. | 7001 Mt. Rushmore Road, Rapid City, SD 57702 | 62.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #714 | Wheatridge 1 | Lexington, OR | 236.9 GWh |
| #715 | Klondike Windpower II | Wasco, OR | 235.8 GWh |
| #716 | Cassadaga Wind Farm | Cherry Creek, NY | 235.6 GWh |
| #717 | Lake Benton I | Lake Benton, MN | 234.7 GWh |
| #718 | Vasco Winds | Livermore, CA | 233.7 GWh |
| #719 | Borderlands Wind, LLC | Quemado, NM | 232.8 GWh |
| #720 | Crystal Lake 3 LLC | Britt, IA | 232.0 GWh |
| #721 | Hackberry Wind Farm | Albany, TX | 228.4 GWh |
| #722 | Twin Buttes Wind Project | Lamar, CO | 228.2 GWh |
| #723 | FPL Energy Vansycle LLC (OR) | Touchet, OR | 225.1 GWh |
| #725 | Wessington Springs | Wessington Springs, SD | 224.5 GWh |
| #726 | San Juan Mesa Wind Project LLC | Elida, NM | 223.2 GWh |
| #727 | Broken Bow Wind LLC | Broken Bow, NE | 221.7 GWh |
| #728 | Oasis Wind | Mojave, CA | 221.1 GWh |
| #729 | Notrees Windpower Hybrid | Goldsmith, TX | 217.0 GWh |
| #730 | Smoky Hills Wind Project Phase II | Lincoln, KS | 220.4 GWh |
| #731 | Rockland Wind Farm | American Falls, ID | 219.4 GWh |
| #732 | Alta Wind VIII | Mojave, CA | 219.2 GWh |
| #733 | Point Wind | Tehachapi, CA | 217.9 GWh |
| #734 | Weaver Wind | Township 16, ME | 214.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Corriedale Wind Energy.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BecLee Solar CSG | Greely, CO | 8.6 GWh | 47.7 mi |
| Bison Solar LLC | Wellington, CO | 57.5 GWh | 17.3 mi |
| Black Hollow Sun | Auit, CO | 363.8 GWh | 35 mi |
| CBEP Solar 3 | Fort Collins, CO | 10.0 MWh | 36.2 mi |
| CBEP SOLAR 6, LLC | Greeley, CO | 2.7 GWh | 45.9 mi |
| Cheyenne Prairie Generating Station | Cheyenne, WY | 486.7 GWh | 13.8 mi |
| CO- CSU- Fort Collins | Fort Collins, CO | 1.9 GWh | 37.1 mi |
| CO- CSU- Fort Collins II | Fort Collins, CO | 3.0 GWh | 37 mi |
| Coyote Ridge Community Solar | Fort Collins, CO | 3.0 GWh | 43 mi |
| ECA CO Greeley | Greeley, CO | 6.5 GWh | 45.9 mi |
| Happy Jack Windpower Project | Cheyenne, WY | 66.0 GWh | 2 mi |
| Rawhide | Wellington, CO | 1.6 TWh | 17.5 mi |
| Rawhide Prairie Solar Hybrid | Wellington, CO | 44.9 GWh | 17.7 mi |
| Roundhouse Renewable Energy II | Granite, WY | 405.6 GWh | 4.1 mi |
| Roundhouse Wind Energy Project | Cheyenne, WY | 897.6 GWh | 6.5 mi |
| Silver Sage Windpower | Cheyenne, WY | 104.9 GWh | 2.4 mi |
| Skylark | Severance, CO | 8.7 GWh | 37.3 mi |
| South Cheyenne Solar | South Greeley, WY | 321.0 GWh | 12.4 mi |
| SR Skylark B | Severance, CO | 1.2 GWh | 37.2 mi |
| SR Skylark C | Windsor, CO | 1.9 GWh | 37.5 mi |