Borderlands Wind, LLC
2645 Bill Knight Gap Rd., Quemado, NM 87829Plant Summary Information
Borderlands Wind, LLC is ranked #39 out of 152 power plants in New Mexico in terms of total annual net electricity generation.
Borderlands Wind, LLC generated 78.7 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Borderlands Wind, LLC |
|---|---|
| Utility Name | Borderlands Wind, LLC |
| Location | Catron County, NM |
| Initial Operation Date | December 2021 |
| Last Update | May 2026 |
| Annual Generation | 233.7 GWh |
| Annual Consumption | 889.9 k MMBtu |
| Ranked #2,348 out of 13,081 Power Plants Nationwide | |
| Ranked #714 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #39 out of 152 New Mexico Power Plants | |
| Ranked #19 out of 30 New Mexico Wind Power Plants | |
| Fuel Types | Wind |
Map of Borderlands Wind, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Borderlands Wind, LLC.
Monthly Net Generation for Borderlands Wind, LLC
Monthly Plant Fuel Consumption for Borderlands Wind, LLC
Borderlands Wind, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Borderlands Wind, LLC (64638) |
| Plant Address | 2645 Bill Knight Gap Rd., Quemado, NM 87829 |
| Utility | Borderlands Wind, LLC (64250) |
| Latitude, Longitude | 34.15984, -108.89446 |
| Generation Dates on File | Dec 2021 to May 2026 |
| Initial Operation Date | December 2021 |
| Annual Generation | 233.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Tucson Electric Power Company (TEPC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
| Grid Voltage | 340.00 kV |
| Energy Storage | No |
Generator WBB Details Operating December 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 34 |
| Time From Cold Shutdown To Full Load | 10M |
| Turbine Details | |
| Number Of Turbines | 34 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 322 |
Borderlands Wind, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #704 | Kibby Wind Facility | Chain of Ponds, ME | 242.1 GWh |
| #705 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 240.7 GWh |
| #706 | Broken Bow Wind II, LLC | Broken Bow, NE | 239.6 GWh |
| #707 | Sandy Ridge Wind 2, LLC | Tyrone, PA | 239.0 GWh |
| #708 | Meadow Lake Wind Farm II LLC | Lafayette, IN | 237.7 GWh |
| #709 | Blackstone Wind Farm LLC | Ransom, IL | 237.7 GWh |
| #710 | Gray County Wind Energy | Montezuma, KS | 237.3 GWh |
| #711 | Klondike Windpower II | Wasco, OR | 235.8 GWh |
| #712 | Lake Benton I | Lake Benton, MN | 234.7 GWh |
| #713 | Vasco Winds | Livermore, CA | 233.7 GWh |
| #715 | Stony Creek Wind Farm NY | Strykersville, NY | 232.9 GWh |
| #716 | Crystal Lake 3 LLC | Britt, IA | 230.8 GWh |
| #717 | Hackberry Wind Farm | Albany, TX | 228.4 GWh |
| #718 | Twin Buttes Wind Project | Lamar, CO | 228.2 GWh |
| #719 | FPL Energy Vansycle LLC (OR) | Touchet, OR | 225.1 GWh |
| #720 | Notrees Windpower Hybrid | Goldsmith, TX | 220.4 GWh |
| #721 | San Juan Mesa Wind Project LLC | Elida, NM | 223.9 GWh |
| #722 | Wessington Springs | Wessington Springs, SD | 223.7 GWh |
| #723 | Broken Bow Wind LLC | Broken Bow, NE | 221.7 GWh |
| #724 | Oasis Wind | Mojave, CA | 221.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Borderlands Wind, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bluewater CDEC 1 | Bluewater, NM | 6.6 GWh | 91.9 mi |
| Chevelon Butte Phase 2 | Winslow, AZ | 484.5 GWh | 114.6 mi |
| Chevelon Butte Wind Farm | Winslow, AZ | 579.2 GWh | 114.5 mi |
| Chino Mines | Hurley, NM | 276.8 GWh | 110.5 mi |
| Cholla | Joseph City, AZ | 1.3 TWh | 96.6 mi |
| Cibola | Seboyeta, NM | 19.5 GWh | 118.1 mi |
| City of Gallup Solar | Gallup, NM | 12.7 GWh | 94.4 mi |
| City of Truth or Consequences PV | Truth or Consequences, NM | 1.4 GWh | 117 mi |
| Coronado | St Johns, AZ | 2.6 TWh | 36 mi |
| Dry Lake Wind LLC | Heber, AZ | 95.9 GWh | 86.4 mi |
| Elephant Butte | Truth or Consequences, NM | 16.6 GWh | 120.1 mi |
| Escalante (NM) | Grants, NM | 514.8 GWh | 97.8 mi |
| Grants CDEC 2 | Grants, NM | 11.5 GWh | 91.2 mi |
| Novo BioPower Plant | Snowflake, AZ | 202.3 GWh | 85.5 mi |
| Poseidon Wind, LLC | Herber, AZ | 99.5 GWh | 79.2 mi |
| Red Mesa Wind LLC | Seboyeta, NM | 163.2 GWh | 115.1 mi |
| Route 66 Energy Center, LLC | San Fidel, NM | 132.9 GWh | 97.5 mi |
| Silver City WWTP PV Project | Silver City, NM | 2.0 GWh | 106.6 mi |
| Springerville | Springerville, AZ | 5.3 TWh | 18.9 mi |
| West Camp Wind Farm | Heber, AZ | 135.4 GWh | 95.8 mi |