Norfolk Landfill Solar Project
599 Greenwoods Road East, Norfolk, CT 6058Plant Summary Information
Norfolk Landfill Solar Project is ranked #73 out of 76 solar farms in Connecticut in terms of total annual net electricity generation.
Norfolk Landfill Solar Project generated 494.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Norfolk Landfill Solar Project |
|---|---|
| Utility Name | NJR Clean Energy Ventures Corporation |
| Location | Northwest Hills Planning Region, CT |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 494.0 MWh |
| Annual Consumption | 1.7 k MMBtu |
| Ranked #11,503 out of 12,332 Power Plants Nationwide | |
| Ranked #6,244 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #145 out of 156 Connecticut Power Plants | |
| Ranked #73 out of 76 Connecticut Solar Power Plants | |
| Fuel Types | Solar |
Map of Norfolk Landfill Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Norfolk Landfill Solar Project.
Monthly Net Generation for Norfolk Landfill Solar Project
Monthly Plant Fuel Consumption for Norfolk Landfill Solar Project
Norfolk Landfill Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Norfolk Landfill Solar Project (67483) |
| Plant Address | 599 Greenwoods Road East, Norfolk, CT 6058 |
| Utility | NJR Clean Energy Ventures Corporation (56990) |
| Latitude, Longitude | 41.981, -73.152 |
| Generation Dates on File | Nov 2024 to Dec 2024 |
| Initial Operation Date | December 2024 |
| Annual Generation | 494.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF24-456-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
| Grid Voltage | 27.60 kV |
| Energy Storage | No |
Generator NRFLK Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4 MW |
| Summer Capacity | 4 MW |
| Winter Capacity | 4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 5.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Norfolk Landfill Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6234 | USS Rosewood Solar LLC (CSG) | Montevideo, MN | 544.0 MWh |
| #6235 | Dairy Farm | Anson, ME | 542.0 MWh |
| #6236 | Division 2 | Lancaster, CA | 541.0 MWh |
| #6237 | Grand Prix Solar | Mt. Kisco, NY | 527.0 MWh |
| #6238 | Dynamic - Exeter Solar CSG | Exeter, ME | 524.0 MWh |
| #6239 | Villa Roma Rd #3 CSG | Delaware, NY | 519.0 MWh |
| #6240 | M. G. Emmett J. Bean Federal Center | Indianapolis, IN | 519.0 MWh |
| #6241 | Irwindale Brew Yard, LLC | Irwindale, CA | 517.0 MWh |
| #6242 | North Troy | Troy, NY | 507.0 MWh |
| #6243 | AC Criminal Courts Complex SPE2, LLC | Mays Landing, NJ | 496.0 MWh |
| #6245 | NY Sorrell Hill II CSG | Baldwinsville, NY | 481.0 MWh |
| #6246 | Fremont CA AutoFactory | Fremont, CA | 480.0 MWh |
| #6247 | Dynamic - Leeds Solar (CSG) | Leeds, ME | 473.0 MWh |
| #6248 | Osawatomie Solar | Osawatomie, KS | 473.0 MWh |
| #6249 | Stafford Hill Solar Hybrid | Rutland, VT | 466.0 MWh |
| #6250 | Division 3 | Lancaster, CA | 458.0 MWh |
| #6251 | Middlebury Solar | Middlebury, IN | 457.0 MWh |
| #6252 | JD Foods - JD Foods | Fresno, CA | 455.0 MWh |
| #6253 | Bissell Solar and Battery Generator | Grand Rapids, MI | 432.0 MWh |
| #6254 | Los Alamos PV Site | Los Alamos, NM | 447.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Norfolk Landfill Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Becton Canaan | North Canaan, CT | 3.3 GWh | 9.6 mi |
| Berkshire 1 | Sheffield, MA | 2.4 GWh | 15.9 mi |
| Bunce | North Canaan, CT | 3.3 GWh | 8.9 mi |
| Cobble Mountain | Granville, MA | 7.8 GWh | 17.5 mi |
| Falls Village | Falls Village, CT | 30.1 GWh | 11.3 mi |
| Franklin Drive | Torrington, CT | 118.0 MWh | 12.7 mi |
| Goodwin Hydroelectric | W. Hartland, CT | 8.9 GWh | 6.8 mi |
| Goose Pond Solar | Southwick, MA | 7.0 GWh | 19.2 mi |
| New Marlborough | New Marlborough, MA | 7.4 GWh | 13.5 mi |
| Platt Hill | Winchester, CT | 2.4 GWh | 6 mi |
| Sand Road | North Canaan, CT | 3.5 GWh | 10 mi |
| Seaboard Sheffield, LLC | Sheffield, MA | 2.3 GWh | 14 mi |
| Sunpin Blandford | Southwick, MA | 6.5 GWh | 14.8 mi |
| Syncarpha Blandford Hybrid CSG | Blandford, MA | 8.5 GWh | 19.4 mi |
| Tanglewood Circle Solar 1 LLC | Becket, MA | 7.8 GWh | 18.9 mi |
| Tolland | Tolland, MA | 8.3 GWh | 10.3 mi |
| Tolland Solar NG LLC | Tolland, MA | 5.0 GWh | 8.8 mi |
| Torrington Solar One, LLC | Torrington, CT | 3.2 GWh | 11.1 mi |
| Torrington Terminal | Torrington, CT | 146.0 MWh | 14.2 mi |
| Wind Colebrook South | Colebrook, CT | 12.2 GWh | 1.5 mi |