South Plant (CO)
700 S Conejos St, Colorado Springs, CO 80903Plant Summary Information
South Plant (CO) is ranked #19 out of 34 natural gas power plants in Colorado in terms of total annual net electricity generation.
South Plant (CO) is comprised of 6 generators and generated 15.5 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | South Plant (CO) |
|---|---|
| Utility Name | City of Colorado Springs - (CO) |
| Location | El Paso County, CO |
| Initial Operation Date | November 1962 |
| Last Update | Mar 2026 |
| Annual Generation | 63.8 GWh |
| Annual Consumption | 791.9 k MMBtu |
| Ranked #3,881 out of 12,332 Power Plants Nationwide | |
| Ranked #1,011 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #77 out of 277 Colorado Power Plants | |
| Ranked #19 out of 34 Colorado Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.9% |
Map of South Plant (CO)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for South Plant (CO).
Monthly Net Generation for South Plant (CO)
Monthly Plant Fuel Consumption for South Plant (CO)
South Plant (CO) Details
| Summary Information | |
|---|---|
| Plant Name | South Plant (CO) (492) |
| Plant Address | 700 S Conejos St, Colorado Springs, CO 80903 |
| Utility | City of Colorado Springs - (CO) (3989) |
| Latitude, Longitude | 38.82444, -104.83333 |
| Generation Dates on File | Jan 2001 to Mar 2026 |
| Initial Operation Date | November 1962 |
| Annual Generation | 63.8 GWh |
| Fuel Types | Natural Gas : 99.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Colorado Springs - (CO) (3989) CO |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | COLORADO SPRINGS UTILITIES |
| Natural Gas Storage | No |
Generator A1 Details Operating June 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 40.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 25 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 23.5 MW |
| Net Winter Capacity With Oil | 23.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator A2 Details Operating June 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 40.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 25 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 23.5 MW |
| Net Winter Capacity With Oil | 23.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator A3 Details Operating June 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 40.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 25 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 23.5 MW |
| Net Winter Capacity With Oil | 23.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator A4 Details Operating June 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 40.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 25 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 23.5 MW |
| Net Winter Capacity With Oil | 23.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator A5 Details Operating June 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 40.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 25 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 23.5 MW |
| Net Winter Capacity With Oil | 23.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator A6 Details Operating June 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 40.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 25 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 23.5 MW |
| Net Winter Capacity With Oil | 23.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
South Plant (CO) Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1001 | MMSD Jones Island Wastewater | Milwaukee, WI | 81.2 GWh |
| #1002 | Pio Pico Energy Center | San Diego, CA | 65.9 GWh |
| #1003 | Friendswood Energy | Houston, TX | 65.7 GWh |
| #1004 | Pratt & Whitney | East Hartford, CT | 65.6 GWh |
| #1005 | Spruance Operating Services LLC | Richmond, VA | 65.5 GWh |
| #1006 | NRG Rockford II Energy Center | Rockford, IL | 64.6 GWh |
| #1007 | International Paper Vicksburg Mill | Vicksburg, MS | 221.4 GWh |
| #1008 | Inver Hills | Inver Grove Heights, MN | 64.2 GWh |
| #1009 | Lakefield Junction | Trimont, MN | 63.9 GWh |
| #1010 | International Paper Riegelwood Mill | Riegelwood, NC | 355.0 GWh |
| #1012 | The Andersons Albion Ethanol LLC | Albion, MI | 63.4 GWh |
| #1013 | Dartmouth Power Associates LP | Dartmouth, MA | 63.0 GWh |
| #1014 | Essex | Essex, MO | 62.6 GWh |
| #1015 | Clayville | Vineland, NJ | 62.4 GWh |
| #1016 | MRP Elgin LLC | Elgin, IL | 62.2 GWh |
| #1017 | Grant Town Power Plant | Grant Town, WV | 614.8 GWh |
| #1018 | CityCenter Central Plant Cogen Units | Las Vegas, NV | 61.6 GWh |
| #1019 | Somerset Plant | Skowhegan, ME | 568.4 GWh |
| #1020 | Tres Port Power, LLC | Victoria, TX | 60.8 GWh |
| #1021 | Indeck Silver Springs Energy Center | Silver Springs, NY | 60.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding South Plant (CO).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AFA Solar Farm | Colorado Springs, CO | 10.9 GWh | 9.3 mi |
| Carson Solar I | Colorado Springs, CO | 3.1 GWh | 7.6 mi |
| CEC Solar #1117, LLC | Pueblo, CO | 4.1 GWh | 40.9 mi |
| Clear Spring Ranch PV Project | Fountain, CO | 19.0 GWh | 17.1 mi |
| CSU Pueblo | Pueblo, CO | 1.8 GWh | 38.3 mi |
| Fountain Valley Power Facility | Fountain, CO | 211.4 GWh | 20.1 mi |
| Fremont CO 1, LLC | Canon City, CO | 3.9 GWh | 32.2 mi |
| Front Range Power Plant | Fountain, CO | 2.3 TWh | 15.2 mi |
| George Birdsall | Colorado Springs, CO | 42.5 GWh | 4 mi |
| Golden West Power Partners LLC | Calhan, CO | 825.5 GWh | 34.3 mi |
| Grazing Yak Solar | Calhan, CO | 79.8 GWh | 33 mi |
| Manitou Springs | Manitou Spring, CO | 2.1 GWh | 5.8 mi |
| Neptune Energy Center Hybrid | Boone, CO | 672.1 GWh | 41 mi |
| Palmer Solar | Fountain, CO | 142.5 GWh | 16.6 mi |
| Pike Solar Hybrid | Fountain, CO | 443.7 GWh | 19.5 mi |
| Pikes Peak Solar Garden 1 LLC CSG | Colorado Springs, CO | 5.0 GWh | 5.8 mi |
| Pueblo Airport Generating Station | Pueblo, CO | 1.6 TWh | 38.5 mi |
| Ray D Nixon | Fountain, CO | 1.1 TWh | 14.9 mi |
| Ruxton Park | Manitou Spring, CO | 1.1 GWh | 7.6 mi |
| Tesla | Colorado Springs, CO | 62.4 GWh | 10.9 mi |