Sandy Ridge Wind 2, LLC
140 Big Fill Run, Tyrone, PA 16686Plant Summary Information
Sandy Ridge Wind 2, LLC is ranked #4 out of 27 wind farms in Pennsylvania in terms of total annual net electricity generation.
Sandy Ridge Wind 2, LLC generated 91.6 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Sandy Ridge Wind 2, LLC |
|---|---|
| Utility Name | Algonquin Power Co |
| Location | Blair County, PA |
| Initial Operation Date | September 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 251.1 GWh |
| Annual Consumption | 950.2 k MMBtu |
| Ranked #2,234 out of 12,637 Power Plants Nationwide | |
| Ranked #679 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #55 out of 243 Pennsylvania Power Plants | |
| Ranked #4 out of 27 Pennsylvania Wind Power Plants | |
| Fuel Types | Wind |
Map of Sandy Ridge Wind 2, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sandy Ridge Wind 2, LLC.
Monthly Net Generation for Sandy Ridge Wind 2, LLC
Monthly Plant Fuel Consumption for Sandy Ridge Wind 2, LLC
Sandy Ridge Wind 2, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Sandy Ridge Wind 2, LLC (65741) |
| Plant Address | 140 Big Fill Run, Tyrone, PA 16686 |
| Utility | Algonquin Power Co (59050) |
| Latitude, Longitude | 40.74534, -78.22231 |
| Generation Dates on File | Sep 2023 to Feb 2026 |
| Initial Operation Date | September 2023 |
| Annual Generation | 251.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | First Electric Coop Corp (6342) AR |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator SRW2 Details Operating September 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 87.6 MW |
| Summer Capacity | 87.6 MW |
| Winter Capacity | 87.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 15 |
| Turbine Details | |
| Number Of Turbines | 15 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V150-6.0 |
| Design Wind Speed | 18.1 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 393.7 |
Sandy Ridge Wind 2, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #669 | Stanton Wind Energy LLC | Lenorah, TX | 253.9 GWh |
| #670 | Broken Bow Wind II, LLC | Broken Bow, NE | 253.6 GWh |
| #671 | Red Barn Energy | Montfort, WI | 253.3 GWh |
| #672 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 252.7 GWh |
| #673 | South Trent Wind Farm | Sweetwater, TX | 252.5 GWh |
| #674 | Copenhagen Wind Farm | Copenhagen, NY | 252.5 GWh |
| #675 | San Roman Wind I, LLC | Los Fresnos, TX | 252.3 GWh |
| #676 | Criterion | Oakland, MD | 252.3 GWh |
| #677 | Ironwood Wind | Spearville, KS | 251.7 GWh |
| #678 | Hancock County Wind Energy Center | Garner, IA | 251.3 GWh |
| #680 | Brookfield | Pigeon, MI | 251.1 GWh |
| #681 | Minco Wind II, LLC | Minco, OK | 251.0 GWh |
| #682 | Pheasant Run Wind LLC | Pigeon, MI | 250.8 GWh |
| #683 | Smoky Hills Wind Project Phase I | Lincoln, KS | 250.8 GWh |
| #684 | Rockland Wind Farm | American Falls, ID | 250.6 GWh |
| #685 | Sigel Wind Park | Harbor Beach, MI | 250.3 GWh |
| #686 | Blackstone Wind Farm LLC | Ransom, IL | 250.1 GWh |
| #687 | Rising Tree Wind Farm | Mojave, CA | 249.0 GWh |
| #688 | Apple Blossom Wind Farm | Pigeon, MI | 248.5 GWh |
| #689 | Wheatridge 1 | Lexington, OR | 248.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sandy Ridge Wind 2, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allegheny Ridge Wind Farm | Portage, PA | 192.9 GWh | 31.2 mi |
| Aspen Road Solar | Spring Run, PA | 178.0 GWh | 47.6 mi |
| Cambria Wind LLC | Sidman, PA | 126.1 GWh | 39.2 mi |
| Chestnut Flats Wind Farm | Altoona, PA | 90.7 GWh | 20.4 mi |
| CL-Viaduct LLC | Bloom Township, PA | 31.8 GWh | 30.8 mi |
| Colver Green Energy | Colver, PA | 718.3 GWh | 33 mi |
| Cottontail Solar 5 | Penn Township, PA | 33.8 GWh | 46 mi |
| CPV Fairview Energy Center | Johnstown, PA | 6.6 TWh | 40.4 mi |
| CPV Maple Hill Solar | Portage, PA | 158.8 GWh | 35.2 mi |
| East Campus Steam Plant | University Park, PA | 49.9 GWh | 20.1 mi |
| Ebensburg Power | Ebensburg, PA | 357.8 GWh | 34.1 mi |
| Highland North Wind Farm | Sidman, PA | 173.0 GWh | 38 mi |
| North Allegheny Windpower Project | Lilly, PA | 219.1 GWh | 27.1 mi |
| Patton Wind Farm | Patton, PA | 87.2 GWh | 26.1 mi |
| Sandy Ridge Wind Farm | Tyrone, PA | 116.8 GWh | 3.6 mi |
| Shawville | Shawville, PA | 1.2 TWh | 23.5 mi |
| UN-School House LLC | Morris Township, PA | 32.2 GWh | 15.2 mi |
| University Park Solar | State College, PA | 2.3 GWh | 20.4 mi |
| West Campus Steam Plant | University Park, PA | 44.0 GWh | 19 mi |
| William F Matson Generating Station | Huntingdon, PA | 74.0 GWh | 24.5 mi |