Pensacola
Junction 82 & 28, Langley, OK 74350Plant Summary Information
Pensacola is ranked #1 out of 7 hydroelectric power plants in Oklahoma in terms of total annual net electricity generation.
Pensacola is comprised of 7 generators and generated 41.6 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Pensacola |
|---|---|
| Utility Name | Grand River Dam Authority |
| Location | Mayes County, OK |
| Initial Operation Date | August 1940 |
| Last Update | Dec 2025 |
| Annual Generation | 422.2 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,557 out of 13,081 Power Plants Nationwide | |
| Ranked #99 out of 1,311 Water Power Plants Nationwide | |
| Ranked #66 out of 137 Oklahoma Power Plants | |
| Ranked #1 out of 7 Oklahoma Water Power Plants | |
| Fuel Types | Water |
Map of Pensacola
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pensacola.
Monthly Net Generation for Pensacola
Monthly Plant Fuel Consumption for Pensacola
Pensacola Details
| Summary Information | |
|---|---|
| Plant Name | Pensacola (2981) |
| Plant Address | Junction 82 & 28, Langley, OK 74350 |
| Utility | Grand River Dam Authority (7490) |
| Latitude, Longitude | 36.4675, -95.04139 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | August 1940 |
| Annual Generation | 422.2 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Grand Neosho |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Grand River Dam Authority (7490) OK |
| Grid Voltage | 69.00 kV / 161.00 kV |
| Energy Storage | No |
Generator 1 Details Operating August 1940
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | GRDAPENSA1UN1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN1_RA |
| Nameplate Capacity | 21.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20.1 MW |
| Winter Capacity | 19.9 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1940 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 2 Details Operating August 1940
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | GRDAPENSA1UN2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN2_RA |
| Nameplate Capacity | 21.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1940 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 3 Details Operating August 1940
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | GRDAPENSA1UN3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN3_RA |
| Nameplate Capacity | 21.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20.1 MW |
| Winter Capacity | 19.6 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1940 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 4 Details Operating August 1940
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | GRDAPENSA1UN4 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN4_RA |
| Nameplate Capacity | 21.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 20.1 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1940 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator A Details Out of Service August 1940
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
|---|---|
| First Operation Date | August 1940 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 5 Details Operating August 1946
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | GRDAPENSA1UN5 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN5_RA |
| Nameplate Capacity | 21.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20.1 MW |
| Winter Capacity | 19.9 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1946 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 6 Details Operating August 1946
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | GRDAPENSA1UN6 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN6_RA |
| Nameplate Capacity | 21.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 19.9 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1946 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Pensacola Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #89 | Jaybird | Camino, CA | 454.3 GWh |
| #90 | Fairfield Pumped Storage | Jenkinsville, SC | 450.6 GWh |
| #91 | White Rock/Slab Creek | Placerville, CA | 446.1 GWh |
| #92 | Spring Creek | Redding, CA | 444.5 GWh |
| #93 | Middle Fork | Foresthill, CA | 444.4 GWh |
| #94 | Kerckhoff 2 | Auberry, CA | 444.1 GWh |
| #95 | Cordell Hull | Carthage, TN | 441.3 GWh |
| #96 | Thompson Falls | Thompson Falls, MT | 439.8 GWh |
| #97 | Long Lake | Ford, WA | 435.4 GWh |
| #98 | Merwin | Ariel, WA | 422.6 GWh |
| #100 | Smithland Hydroelectric Plant | Smithland, KY | 420.6 GWh |
| #101 | Cannelton Hydroelectric Plant | Hawesville, KY | 416.9 GWh |
| #102 | Norris Dam | Norris, TN | 416.3 GWh |
| #103 | Belden | Belden, CA | 415.3 GWh |
| #104 | Bradley Lake | Homer, AK | 414.7 GWh |
| #105 | Big Creek 1 | Big Creek, CA | 409.1 GWh |
| #106 | Keswick | Redding, CA | 401.1 GWh |
| #107 | Pelton | Madras, OR | 399.6 GWh |
| #108 | Walter Bouldin Dam | Wetumpka, AL | 398.5 GWh |
| #109 | Collierville Powerhouse | Murphys, CA | 396.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pensacola.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Chouteau | Pryor, OK | 6.3 TWh | 21.4 mi |
| CML&P Generating Facility No. 2 | Coffeyville, KS | 84.7 GWh | 52.7 mi |
| Coffeyville | Coffeyville, KS | 15.3 GWh | 50.5 mi |
| Flint Creek | Gentry, AR | 2.8 TWh | 32.3 mi |
| Georgia-Pacific Muskogee | Muskogee, OK | 351.8 GWh | 52.7 mi |
| GREC | Chouteau, OK | 3.1 TWh | 23.6 mi |
| Huckleberry Solar | Pryor, OK | 18.9 GWh | 24.7 mi |
| Markham | Locust Grove, OK | 288.1 GWh | 18.1 mi |
| Mound | Mound Valley, KS | 2.2 GWh | 52.7 mi |
| Muskogee | Fort Gibson, OK | 2.8 TWh | 50.7 mi |
| Northeastern | Oologah, OK | 4.2 TWh | 36.7 mi |
| Oneta Energy Center | Broken Arrow, OK | 4.4 TWh | 48.2 mi |
| Ozark Solar Park | Lincoln, AR | 4.1 GWh | 49.8 mi |
| Riverton | Riverton, KS | 1.2 TWh | 45.9 mi |
| State Line Combined Cycle | Joplin, MO | 2.3 TWh | 47.6 mi |
| Twelvemile Solar 1 | Tulsa, OK | 61.7 GWh | 14.1 mi |
| Twelvemile Solar 2 | Durant, OK | 30.1 GWh | 14.1 mi |
| UA Central Utility Plant | Fayetteville, AR | 36.5 GWh | 55.8 mi |
| Waste Management Eco Vista LFGTE | Springdale, AR | 21.5 GWh | 49 mi |
| XNA (NW AR Natnl Airport) | Bentonville, AR | 1.3 GWh | 43.1 mi |