Robert S Kerr
29759 Powerhouse Rd, Keota, OK 74955Plant Summary Information
Robert S Kerr is ranked #1 out of 9 hydroelectric power plants in Oklahoma in terms of total annual net electricity generation.
Robert S Kerr is comprised of 4 generators and generated 81.7 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Robert S Kerr |
|---|---|
| Utility Name | USCE-Tulsa District |
| Location | Sequoyah County, OK |
| Initial Operation Date | July 1971 |
| Last Update | Dec 2024 |
| Annual Generation | 370.3 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,681 out of 12,539 Power Plants Nationwide | |
| Ranked #119 out of 1,332 Water Power Plants Nationwide | |
| Ranked #66 out of 134 Oklahoma Power Plants | |
| Ranked #1 out of 9 Oklahoma Water Power Plants | |
| Fuel Types | Water |
Map of Robert S Kerr
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Robert S Kerr.
Monthly Net Generation for Robert S Kerr
Robert S Kerr Details
| Summary Information | |
|---|---|
| Plant Name | Robert S Kerr (2985) |
| Plant Address | 29759 Powerhouse Rd, Keota, OK 74955 |
| Utility | USCE-Tulsa District (27470) |
| Latitude, Longitude | 35.34447, -94.7755 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | July 1971 |
| Annual Generation | 370.3 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwestern Power Administration (SPA) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Arkansas River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southwestern Power Administration (17716) |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
Generator 1 Details Operating October 1971
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 27.5 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 28 MW |
| Winter Capacity | 28 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1971 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 6 MW |
| Planned Net Winter Capacity Uprate | 6 MW |
| Planned Uprate | December 2025 |
Generator 4 Details Operating November 1971
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 27.5 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1971 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 14 MW |
| Planned Net Winter Capacity Uprate | 14 MW |
| Planned Uprate | December 2025 |
Generator 2 Details Operating July 1971
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 27.5 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 26 MW |
| Winter Capacity | 26 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1971 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 8 MW |
| Planned Net Winter Capacity Uprate | 8 MW |
| Planned Uprate | December 2025 |
Generator 3 Details Out of Service September 1971
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 27.5 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 31.6 MW |
| Winter Capacity | 31.6 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
| First Operation Date | September 1971 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 6 MW |
| Planned Net Winter Capacity Uprate | 6 MW |
| Planned Uprate | December 2025 |
Robert S Kerr Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #109 | Comerford | Monroe, NH | 400.5 GWh |
| #110 | Pit 4 | Big Bend, CA | 399.5 GWh |
| #111 | Summer Falls Power Plant | Coulee City, WA | 398.2 GWh |
| #112 | Bradley Lake | Homer, AK | 397.1 GWh |
| #113 | White Rock/Slab Creek | Placerville, CA | 394.9 GWh |
| #114 | Parker Dam | Parker, CA | 390.7 GWh |
| #115 | Norris Dam | Norris, TN | 386.9 GWh |
| #116 | Mammoth Pool | North Fork, CA | 383.3 GWh |
| #117 | Spring Creek | Redding, CA | 375.4 GWh |
| #118 | Kerckhoff 2 | Auberry, CA | 370.5 GWh |
| #120 | Table Rock | Branson, MO | 367.8 GWh |
| #121 | H M Jackson | Sultan, WA | 365.7 GWh |
| #122 | Collierville Powerhouse | Murphys, CA | 365.5 GWh |
| #123 | Middle Fork | Foresthill, CA | 364.9 GWh |
| #124 | Caribou 2 | Belden, CA | 364.4 GWh |
| #125 | Pelton | Madras, OR | 361.8 GWh |
| #126 | Diablo | Rockport, WA | 361.4 GWh |
| #127 | Mitchell Dam | Verbena, AL | 355.5 GWh |
| #128 | Big Creek 2 | Auberry, CA | 355.2 GWh |
| #129 | Pensacola | Langley, OK | 349.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Robert S Kerr.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arkansas Valley | Ozark, AR | 2.3 GWh | 54.2 mi |
| Branch Solar Farm | Branch, AR | 10.0 GWh | 48 mi |
| City of Paris Solar | Paris, AR | 2.6 GWh | 58.8 mi |
| Elkins Generating Center | Elkins, AR | 20.7 GWh | 61.4 mi |
| Ellis Hydro | Van Buren, AR | 128.8 GWh | 27.1 mi |
| Eufaula Dam | Porum, OK | 219.6 GWh | 32.9 mi |
| Fayetteville Public Schools (SWEPCO) | Booneville, AR | 8.7 GWh | 52.8 mi |
| Fort Gibson | Fort Gibson, OK | 140.4 GWh | 44.2 mi |
| Georgia-Pacific Muskogee | Muskogee, OK | 378.4 GWh | 39.6 mi |
| LRWRA | Little Rock, AR | 2.4 GWh | 52.8 mi |
| Muskogee | Fort Gibson, OK | 2.7 TWh | 40.7 mi |
| Ozark | Ozark, AR | 314.7 GWh | 54.6 mi |
| Ozark Solar Park | Lincoln, AR | 4.5 GWh | 47.9 mi |
| Rich Mountain Electric Cooperative | Mena, AR | 2.0 GWh | 61.7 mi |
| River Valley | Panama, OK | 503.3 GWh | 12.8 mi |
| Thomas Fitzhugh | Ozark, AR | 484.4 GWh | 55.3 mi |
| UA Central Utility Plant | Fayetteville, AR | 33.4 GWh | 60.3 mi |
| Webbers Falls | Webbers Falls, OK | 174.3 GWh | 26.5 mi |
| Westside Wastewater Treatment Plant Hybr | Fayetteville, AR | 2.8 GWh | 59.9 mi |
| Wildhorse Mountain Wind Facility | Clayton, OK | 375.7 GWh | 57.1 mi |