Diablo
500 Newhalem Street, Rockport, WA 98283Plant Summary Information
Diablo is ranked #34 out of 131 power plants in Washington in terms of total annual net electricity generation.
Diablo is comprised of 4 generators and generated 208.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Diablo |
|---|---|
| Utility Name | City of Seattle - (WA) |
| Location | Whatcom County, WA |
| Initial Operation Date | October 1936 |
| Last Update | Dec 2025 |
| Annual Generation | 518.2 GWh |
| Annual Consumption | 1.8 M MMBtu |
| Ranked #1,318 out of 13,081 Power Plants Nationwide | |
| Ranked #73 out of 1,311 Water Power Plants Nationwide | |
| Ranked #34 out of 131 Washington Power Plants | |
| Ranked #17 out of 70 Washington Water Power Plants | |
| Fuel Types | Water |
Map of Diablo
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Diablo.
Monthly Net Generation for Diablo
Monthly Plant Fuel Consumption for Diablo
Diablo Details
| Summary Information | |
|---|---|
| Plant Name | Diablo (6432) |
| Plant Address | 500 Newhalem Street, Rockport, WA 98283 |
| Utility | City of Seattle - (WA) (16868) |
| Latitude, Longitude | 48.71385, -121.13174 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | October 1936 |
| Annual Generation | 518.2 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Seattle City Light (SCL) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Skagit River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Seattle - (WA) (16868) WA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 32 Details Operating October 1936
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DIABLO_2_GEN32GNODE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DIABLO_2_GEN32GNODE |
| Nameplate Capacity | 90 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 90 MW |
| Winter Capacity | 90 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 1936 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | Yes |
| Other Modifications | October 2027 |
| Multiple Fuels | No |
Generator 35 Details Operating October 1936
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1936 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | Yes |
| Other Modifications | July 2029 |
| Multiple Fuels | No |
Generator 36 Details Operating October 1936
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1936 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | Yes |
| Other Modifications | December 2029 |
| Multiple Fuels | No |
Generator 31 Details Operating April 1937
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DIABLO_2_GEN31GNODE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DIABLO_2_GEN31GNODE |
| Nameplate Capacity | 90 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 90 MW |
| Winter Capacity | 90 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 1937 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | Yes |
| Other Modifications | June 2027 |
| Multiple Fuels | No |
Diablo Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #63 | Barkley | Kuttawa, KY | 624.9 GWh |
| #64 | Mayfield | Silver Creek, WA | 602.5 GWh |
| #65 | Dion R Holm | Groveland, CA | 577.8 GWh |
| #66 | Nickajack | New Hope, TN | 577.6 GWh |
| #67 | Calderwood | Tallassee, TN | 568.7 GWh |
| #68 | Mammoth Pool | North Fork, CA | 568.6 GWh |
| #69 | Yellowtail | Hardin, MT | 566.2 GWh |
| #70 | J Strom Thurmond | Clarks Hill, SC | 566.0 GWh |
| #71 | Folsom | Folsom, CA | 537.6 GWh |
| #72 | James B Black | Big Bend, CA | 530.6 GWh |
| #74 | Dardanelle | Dardanelle, AR | 517.3 GWh |
| #75 | Guntersville | Guntersville, AL | 509.1 GWh |
| #76 | Swift 1 | Cougar, WA | 508.0 GWh |
| #77 | Great Lakes Hydro America - ME | Millinocket, ME | 500.1 GWh |
| #78 | Osage Dam | Eldon, MO | 498.9 GWh |
| #79 | R C Kirkwood | Groveland, CA | 489.0 GWh |
| #80 | Lay Dam | Clanton, AL | 482.4 GWh |
| #81 | Trinity | Weaverville, CA | 475.6 GWh |
| #82 | Yale | Amboy, WA | 472.5 GWh |
| #83 | Cheoah | Tapoco, NC | 472.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Diablo.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Microgrid | Arlington, WA | 601.0 MWh | 60.5 mi |
| Chelan | Wenatchee, WA | 325.2 GWh | 79.6 mi |
| Darrington | Darrington, WA | 12.3 GWh | 37.4 mi |
| Encogen | Bellingham, WA | 236.9 GWh | 61.8 mi |
| Ferndale Generating Station | Ferndale, WA | 737.5 GWh | 71.2 mi |
| Fredonia (WA) | Mt Vernon, WA | 60.4 GWh | 62.2 mi |
| Gorge | Rockport, WA | 912.4 GWh | 3.7 mi |
| H M Jackson | Sultan, WA | 333.6 GWh | 63.9 mi |
| HF Sinclair Puget Sound Refining | Anacortes, WA | 896.6 GWh | 67.4 mi |
| Koma Kulshan | Concrete, WA | 32.3 GWh | 27.1 mi |
| Lower Baker | Concrete, WA | 364.8 GWh | 30.1 mi |
| Nooksack Hydro | Glacier, WA | 20.2 GWh | 33.8 mi |
| Ross | Rockport, WA | 714.9 GWh | 3.2 mi |
| Sierra Pacific Burlington Facility | Mt Vernon, WA | 160.2 GWh | 62.3 mi |
| South Fork Tolt | North Bend, WA | 48.6 GWh | 76.3 mi |
| Sumas Power Plant | Sumas, WA | 675.8 GWh | 55.3 mi |
| Upper Baker | Concrete, WA | 332.7 GWh | 25.9 mi |
| Wells | Chelan, WA | 4.3 TWh | 78.7 mi |
| Whitehorn | Blaine, WA | 65.2 GWh | 74.7 mi |
| Youngs Creek Hydroelectric Project | Monroe, WA | 12.9 GWh | 70.7 mi |