GMP Solar/Storage-Essex Hybrid

251 River Road, Essex, VT 5453

Plant Summary Information

GMP Solar/Storage-Essex Hybrid is ranked #42 out of 114 power plants in Vermont in terms of total annual net electricity generation.

GMP Solar/Storage-Essex Hybrid generated 2.5 GWh during the 3-month period between May 2025 to August 2025.

Plant NameGMP Solar/Storage-Essex Hybrid
Utility NameGreen Mountain Power Corp
LocationChittenden County, VT
Initial Operation DateSeptember 2019
Last Update Aug 2025
Annual Generation 7.1 GWh
Annual Consumption 26.2 k MMBtu
Ranked #7,208 out of 12,529 Power Plants Nationwide
Ranked #2,653 out of 6,390 Solar Power Plants Nationwide
Ranked #42 out of 114 Vermont Power Plants
Ranked #9 out of 54 Vermont Solar Power Plants
Fuel Types Solar : 97.9% Electricity used for energy storage : 2.1%

Map of GMP Solar/Storage-Essex Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for GMP Solar/Storage-Essex Hybrid.

Create Your Account Today

Monthly Net Generation for GMP Solar/Storage-Essex Hybrid

GMP Solar/Storage-Essex Hybrid Details

Summary Information
Plant NameGMP Solar/Storage-Essex Hybrid (62383)
Plant Address251 River Road, Essex, VT 5453
UtilityGreen Mountain Power Corp (7601)
Latitude, Longitude44.28594, -73.02337
Generation Dates on FileSep 2019 to Aug 2025
Initial Operation DateSeptember 2019
Annual Generation 7.1 GWh
Fuel Types Solar : 97.9% Electricity used for energy storage : 2.1%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment
Transmission / Distribution OwnerGreen Mountain Power Corp (7601) VT
Grid Voltage 34.50 kV
Energy StorageYes

Generator GMPBE Details Operating September 2019

TechnologyBatteries
Prime MoverBattery
OwnershipWholly Owned by Other Entity
Nameplate Capacity2 MW
Summer Capacity2 MW
Winter Capacity2 MW
Minimum Load2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2019
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH8
Maximum Charge Rate2 MW
Maximum Discharge Rate2 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating2
Storage Enclosure TypeOT
ArbitrageYes
Frequency RegulationYes
System Peak ShavingP
Direct Support Of Another UnitNo
Support T D AssetYes

Generator GMPSE Details Operating September 2019

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity4.5 MW
Summer Capacity4.5 MW
Winter Capacity4.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2019
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity6.8 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

GMP Solar/Storage-Essex Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
GMP VT Microgrid LLC163 Acorn Lane, Colchester, VT 5446Generator GMPBE100.00%
GMP VT Microgrid LLC163 Acorn Lane, Colchester, VT 5446Generator GMPSE100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2643Knaggs Brothers FarmAltamont, NY6.9 GWh
#26443232 Batavia SolarBatavia, NY6.9 GWh
#2645Lewiston Junction Road SolarPoland, ME6.9 GWh
#2646OYA State Route 122Constable, NY6.9 GWh
#2647Harding Solar, LLCHookerton, NC6.9 GWh
#2648Hartland SolarHartland, ME6.9 GWh
#2649Fairmont-FLS 100Fairmont, NC6.9 GWh
#2650Source Power NY III - Medina II (CSG)Medina, NY6.9 GWh
#2651State Highway 17B SolarBethel, NY6.9 GWh
#2652Crestwood Solar Center LLCOxford, NC6.9 GWh
#2654Rice Lake Solar ArrayRice Lake, WI6.9 GWh
#2655RavenbrookCarver, MA6.9 GWh
#2656Riley Road LLCNew Windsor, NY6.9 GWh
#2657ZPD-PT Solar Project 2017-038 Hybrid LLCLancaster, MA6.8 GWh
#2658Iron Horse Solar 4, LLCNorth Billerica, MA6.9 GWh
#2659American Canyon SolarAmerican Canyon, CA6.9 GWh
#2660Kearsarge Concord IIConcord, MA6.9 GWh
#2661CSU Long Beach Lots 7 & 14Long Beach, CA6.9 GWh
#2662CED Northampton Solar LLC HybridNorthampton, MA6.8 GWh
#2663OverlookWestminster, MA6.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding GMP Solar/Storage-Essex Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
158th Fighter Wing Solar FarmSouth Burlington, VT1.3 GWh14.7 mi
Charlotte Solar LLC VTCharlotte, VT3.0 GWh9 mi
Chittenden County Solar PartnersSouth Burlington, VT2.9 GWh12 mi
Claire Solar FarmSouth Burlington, VT3.6 GWh11.7 mi
Essex Junction 19Essex Junction, VT33.1 GWh14.3 mi
GMP Solar - RichmondRichmond, VT2.8 GWh9.8 mi
GMP Solar - WillistonWilliston, VT6.2 GWh13 mi
GMP Solar/Storage-Ferrisburgh HybridFerrisburgh, VT8.2 GWh12.1 mi
GMP Solar/Storage-Milton HybridMilton, VT7.7 GWh8.3 mi
Gorge 18South Burlington, VT16.7 GWh15.8 mi
Jericho Gravel Solar FarmJerico, VT2.3 GWh13.7 mi
Jericho Landfill Solar FarmJerico, VT1.9 GWh11.5 mi
Limerick Road Solar FarmShelburne, VT2.8 GWh12.5 mi
MoretownWaterbury, VT4.8 GWh15.5 mi
Moretown Generating StationMoretown, VT2.6 GWh15.5 mi
Open View Solar FarmNew Haven, VT2.8 GWh13.5 mi
VEC Magee Hill SolarHinesburgh, VT1.7 GWh6 mi
Vergennes 9Vergennes, VT8.0 GWh14.2 mi
Waterbury 22Waterbury, VT15.2 GWh14.2 mi
Whitcomb Solar FarmEssex Junction, VT3.4 GWh14.9 mi