Charles City

7960 Chambers Rd, Providence Forge, VA 23030

Plant Summary Information

Charles City is ranked #40 out of 292 landfill gas power plants nationwide in terms of total annual net electricity generation.

Charles City is comprised of 48 generators and generated 10.5 GWh during the 3-month period between September 2024 to December 2024.

Plant NameCharles City
Utility NameIndustrial Power Generating Company LLC
LocationCharles City County, VA
Initial Operation DateNovember 2003
Last Update Dec 2024
Annual Generation 47.9 GWh
Annual Consumption 593.2 k MMBtu
Ranked #4,029 out of 12,288 Power Plants Nationwide
Ranked #40 out of 292 Landfill Gas Power Plants Nationwide
Ranked #82 out of 227 Virginia Power Plants
Ranked #4 out of 17 Virginia Landfill Gas Power Plants
Fuel Types Landfill Gas : 94.1% Distillate Fuel Oil : 5.9%

Map of Charles City

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Charles City.

Create Your Account Today

Monthly Net Generation for Charles City

8k8k6k6k4k4k2k2k00200720072008200820092009201020102011201120122012201320132014201420152015201620162017201720182018201920192020202020212021202220222023202320242024
Download SVG
Download PNG
Download CSV

Charles City Details

Summary Information
Plant NameCharles City (56683)
Plant Address7960 Chambers Rd, Providence Forge, VA 23030
UtilityIndustrial Power Generating Company LLC (55938)
Latitude, Longitude37.43889, -77.12861
Generation Dates on FileJan 2007 to Dec 2024
Initial Operation DateNovember 2003
Annual Generation 47.9 GWh
Fuel Types Landfill Gas : 94.1% Distillate Fuel Oil : 5.9%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthorityPJM Interconnection, LLC (PJM)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceWells
Ash Impoundment No
Transmission / Distribution OwnerVirginia Electric & Power Co (19876) VA
Grid Voltage 34.50 kV
Energy StorageNo

Generator 1 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 10 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 11 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 12 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 13 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 14 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 15 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 16 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 17 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 18 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 19 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 2 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 20 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 21 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 22 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 23 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 24 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 25 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 26 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 27 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 28 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 29 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 3 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 30 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 31 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 32 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 33 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 34 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 35 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 36 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 37 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 38 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 39 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 4 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 40 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 41 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 42 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 43 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 44 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 45 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 46 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 47 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 48 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 5 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 6 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 7 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 8 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 9 Details Operating November 2003

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181313
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2003
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Charles City Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Landfill Gas.

RankPlant NamePlant LocationAnnual Generation
#30Superior Landfill Gas RecoverySavannah, GA50.0 GWh
#31Waste Management Middle Peninsula LFGTEGlenns, VA49.8 GWh
#32Coventry Clean Energy CorporationCoventry, VT49.5 GWh
#33Chaffee Gas RecoveryChaffee, NY48.4 GWh
#34Dart Container CorpLeola, PA48.2 GWh
#35Pheasant Run Landfill Gas RecoveryBristol, WI47.9 GWh
#36Clinton LFGTE FacilityMorrisonville, NY47.8 GWh
#37Waste Management Rolling Meadows LFGTETopeka, KS47.4 GWh
#38Blue Ridge LandfillChambersburg, PA46.0 GWh
#39Elk City StationBennington, NE45.9 GWh
#41Cumberland County PA LFG RecoveryShippensburg, PA44.7 GWh
#42Pioneer Crossing Energy, LLCBirdsboro, PA44.5 GWh
#43Turnkey Landfill Gas RecoveryRochester, NH44.2 GWh
#44MM Prince William EnergyManassas, VA43.1 GWh
#45JBER Landfill Gas Power PlantAnchorage, AK43.7 GWh
#46MM San Diego-MiramarSan Diego, CA46.1 GWh
#47Green Knight Energy CenterPen Argyl, PA41.3 GWh
#48Brunswick Landfill GasLawrenceville, VA43.4 GWh
#49Colonie LFGTE FacilityCohoes, NY40.9 GWh
#50JED Solid Waste Mgmt Renewable EnergySt. Cloud, FL40.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Charles City.

Plant NamePlant LocationAnnual GenerationDistance
Briel Solar FarmStandston, VA41.8 GWh9.4 mi
Caden Energix Rives Road LLCPetersburg, VA29.8 GWh21.4 mi
ChesterfieldChester, VA2.0 TWh14.5 mi
Chesterfield Landfill GasChester, VA24.3 GWh21.1 mi
Correctional Solar LLCBarhamsville, VA29.0 GWh15.7 mi
DarbytownRichmond, VA144.6 GWh13.8 mi
Energix Hollyfield, LLCManquin, VA26.8 GWh16.2 mi
Fort Powhatan SolarDisputanta, VA319.9 GWh12.6 mi
HollyfieldManquin, VA24.9 GWh16.3 mi
Hopewell CogenerationHopewell, VA2.1 TWh13.2 mi
Hopewell MillHopewell, VA280.9 GWh13.2 mi
Hopewell Power StationHopewell, VA311.2 GWh12.9 mi
Mechanicsville SolarMechanicsville, VA52.9 GWh16.3 mi
Norge Solar FarmWilliamsburg, VA38.8 GWh20.1 mi
Park 500 Philip Morris USAChester, VA12.0 GWh10.8 mi
Richmond EnergyHenrico, VA33.4 GWh14.2 mi
Rochambeau SolarWilliamsburg, VA37.6 GWh21.1 mi
Skipjack Solar CenterWayside, VA334.4 GWh1.7 mi
Spruance Operating Services LLCRichmond, VA59.1 GWh16.6 mi
WestRock-West Point MillWest Point, VA505.2 GWh19 mi