Pleasant Creek Unit 1
3300 DAEC Road, Palo, IA 52324Plant Summary Information
Pleasant Creek Unit 1 is ranked #4 out of 28 solar farms in Iowa in terms of total annual net electricity generation.
Pleasant Creek Unit 1 generated 24.2 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Pleasant Creek Unit 1 |
---|---|
Utility Name | Interstate Power and Light Co |
Location | Linn County, IA |
Initial Operation Date | March 2024 |
Last Update | Apr 2025 |
Annual Generation | 96.2 GWh |
Annual Consumption | 358.6 k MMBtu |
Ranked #3,325 out of 12,299 Power Plants Nationwide | |
Ranked #712 out of 6,182 Solar Power Plants Nationwide | |
Ranked #94 out of 279 Iowa Power Plants | |
Ranked #4 out of 28 Iowa Solar Power Plants | |
Fuel Types | Solar |
Map of Pleasant Creek Unit 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pleasant Creek Unit 1.
Monthly Net Generation for Pleasant Creek Unit 1
Pleasant Creek Unit 1 Details
Summary Information | |
---|---|
Plant Name | Pleasant Creek Unit 1 (67140) |
Plant Address | 3300 DAEC Road, Palo, IA 52324 |
Utility | Interstate Power and Light Co (9417) |
Latitude, Longitude | 42.1044, -91.78258 |
Generation Dates on File | Apr 2024 to Apr 2025 |
Initial Operation Date | March 2024 |
Annual Generation | 96.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Midwest LLC (56161) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator PV1 Details Operating March 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ALTW.DASOLAR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ALTW.DASOLAR1 |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Other Planned Modifications | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 62.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pleasant Creek Unit 1 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#702 | Bear Creek | Lone Rock, WI | 98.7 GWh |
#703 | River Fork Solar, LLC | Albion, MI | 98.6 GWh |
#704 | Wever Solar (150MW) | Wever, IA | 98.1 GWh |
#705 | Beaver Dam Solar | Dodge, WI | 97.5 GWh |
#706 | Cassville Solar | Cassville, WI | 97.4 GWh |
#707 | Millington Solar Farm | Millington, TN | 97.3 GWh |
#708 | Buckleberry Solar | Grifton, NC | 97.1 GWh |
#709 | Waipio Solar | Waipio, HI | 96.9 GWh |
#710 | Prairie Ronde Solar Farm | Opelousas, LA | 96.9 GWh |
#711 | Stanly Solar, LLC | Albemarle, NC | 96.8 GWh |
#713 | Beacon Solar Plant Site 5 | Cantil, CA | 95.7 GWh |
#714 | Hattiesburg Solar Farm | Hattiesburg, MS | 95.5 GWh |
#715 | Highest Power Solar, LLC | Louisburg, NC | 95.4 GWh |
#716 | Glover Creek Solar, LLC | Summer Shade, KY | 95.0 GWh |
#717 | Great Cove Solar | McConnellsburg, PA | 94.9 GWh |
#718 | Tupelo Solar | San Mateo, FL | 94.8 GWh |
#719 | Titan Solar | Deer Trail, CO | 94.8 GWh |
#720 | Marshall Solar Energy Project | Marshall, MN | 94.7 GWh |
#721 | Morris Ridge Solar | Mount Morris, NY | 94.4 GWh |
#722 | CM48 | Boulder City, NV | 94.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pleasant Creek Unit 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alliant SBD 8602 Marion Sub | Marion, IA | 18.6 MWh | 10.8 mi |
Alliant SBD 9106 Rockwell CR | Cedar Rapids, IA | 252.8 MWh | 8.5 mi |
Alliant SBD 9203 Profol | Cedar Rapids, IA | 130.0 MWh | 13.9 mi |
Alliant SBD 9403 Aegon DC | Cedar Rapids, IA | 9.8 MWh | 14.5 mi |
Alliant SBD0201 Ingredion | Cedar Rapids, IA | 18.6 MWh | 11 mi |
Alliant SBG 9802 Toyota | Cedar Rapids, IA | 9.8 MWh | 6.4 mi |
Amana Society Service Company | Middle Amana, IA | 1.0 GWh | 22.2 mi |
Anchor Wind, LLC | Mechanicsville, IA | 5.9 GWh | 33.2 mi |
Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh | 13.5 mi |
CED Manchester Wind | Manchester, IA | 31.0 GWh | 29.7 mi |
Cedar Rapids Community Solar | Cedar Rapids, IA | 7.7 GWh | 11.2 mi |
Coggon | Coggon, IA | 8.0 MWh | 17.7 mi |
Coralville GT | Coralville, IA | 800.0 MWh | 31.9 mi |
Hopkinton | Hopkinton, IA | 11.0 MWh | 32 mi |
Independence Wind Farm | Manchester, IA | 220.0 GWh | 25.1 mi |
Kirkwood Wind Turbine | Cedar Rapids, IA | 223.0 MWh | 14.6 mi |
La Porte | La Porte City, IA | 30.0 MWh | 25.6 mi |
Pleasant Creek Unit 2 | Palo, IA | 86.4 GWh | 0 mi |
Prairie Creek | Cedar Rapids, IA | 64.4 GWh | 13.3 mi |
University of Iowa Main Power Plant | Iowa City, IA | 3.8 GWh | 33.3 mi |