Chicopee Solar
467 Pendleton Ave, Chicopee, MA 1020Plant Summary Information
Chicopee Solar is ranked #161 out of 503 solar farms in Massachusetts in terms of total annual net electricity generation.
Chicopee Solar generated 946.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Chicopee Solar |
---|---|
Utility Name | Citizens Enterprises Corporation |
Location | Hampden County, MA |
Initial Operation Date | December 2013 |
Last Update | Dec 2024 |
Annual Generation | 4.6 GWh |
Annual Consumption | 16.2 k MMBtu |
Ranked #8,091 out of 12,288 Power Plants Nationwide | |
Ranked #3,204 out of 6,174 Solar Power Plants Nationwide | |
Ranked #234 out of 609 Massachusetts Power Plants | |
Ranked #161 out of 503 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of Chicopee Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chicopee Solar.
Monthly Net Generation for Chicopee Solar
Chicopee Solar Details
Summary Information | |
---|---|
Plant Name | Chicopee Solar (59030) |
Plant Address | 467 Pendleton Ave, Chicopee, MA 1020 |
Utility | Citizens Enterprises Corporation (58871) |
Latitude, Longitude | 42.18556, -72.5825 |
Generation Dates on File | Jan 2014 to Dec 2024 |
Initial Operation Date | December 2013 |
Annual Generation | 4.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-21-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Chicopee - (MA) (3477) MA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 0036 Details Operating December 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 3.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Chicopee Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Citizens Solar Holdings II MA, LLC | 88 Black Falcon Ave, Suite 342, Boston, MA 2210 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3194 | Bedford Solar | Bedford, VA | 4.6 GWh |
#3195 | Woodlawn CSG | Crete, IL | 4.6 GWh |
#3196 | Monroe 009452 SCS Cozad, LLC | Cozad, NE | 4.6 GWh |
#3197 | Trenton Solar Farm (MO) | Trenton, MO | 4.6 GWh |
#3198 | Burlington Coat Factory Solar | Florence, NJ | 4.6 GWh |
#3199 | LPEA Sunnyside Solar 1 Facility | Durango, CO | 4.6 GWh |
#3200 | Galloway Landfill | Wall, NJ | 4.6 GWh |
#3201 | IL Sidney Project1 | Sidney, IL | 4.6 GWh |
#3202 | MilfordSolar OR | Forest Grove, OR | 4.6 GWh |
#3203 | Exeter Solar | Exeter, CA | 4.6 GWh |
#3205 | Lowndes Tycor Farms | Lake Park, GA | 4.6 GWh |
#3206 | USS Solar Brick | Standard City, IL | 4.6 GWh |
#3207 | Mount Dora Solar Farm F | Mount Dora, FL | 4.6 GWh |
#3208 | California City | California City, CA | 4.6 GWh |
#3209 | Sierra Pacific Chinese Camp | Chinese Camp, CA | 4.6 GWh |
#3210 | Round Grove 2 | Lyndon, IL | 4.6 GWh |
#3211 | Solar Las Vegas MB-1 | Las Vegas, NV | 4.6 GWh |
#3212 | CA-DGS-California Men's Colony | San Luis Obispo, CA | 4.6 GWh |
#3213 | Hinton | Hinton, OK | 4.5 GWh |
#3214 | Niagara Bottling - Bloomfield | Bloomfield, CT | 4.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chicopee Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Chicopee Energy | Chicopee, MA | 9.5 GWh | 2.8 mi |
Boatlock | Holyoke, MA | 18.9 GWh | 1.9 mi |
Cabot Holyoke | Holyoke, MA | 4.4 GWh | 1.7 mi |
CED Chicopee Solar | Chicopee, MA | 4.8 GWh | 2.1 mi |
Chemical | Holyoke, MA | 5.5 GWh | 1.5 mi |
Chicopee | Chicopee, MA | 2.6 GWh | 3.7 mi |
Chicopee Granby Road Solar | Chicopee, MA | 2.2 GWh | 2 mi |
Chicopee River Solar | Springfield, MA | 3.1 GWh | 2.9 mi |
Cottage Street Solar Facility | Springfield, MA | 2.7 GWh | 3.6 mi |
Dwight | Chicopee, MA | 6.3 GWh | 2.9 mi |
East Springfield Solar PV | Springfield, MA | 2.0 GWh | 3.6 mi |
Front Street | Chicopee, MA | 497.0 MWh | 2.6 mi |
Granby LFG | Granby, MA | 3.1 GWh | 3.4 mi |
Hadley Falls | Holyoke, MA | 151.1 GWh | 2.1 mi |
Ludlow Landfill | Ludlow, MA | 3.4 GWh | 3.8 mi |
Masspower | Indian Orchard, MA | 609.1 GWh | 3.6 mi |
Riverside Holyoke | Holyoke, MA | 38.4 GWh | 1.2 mi |
Smith & Wesson at Springfield MA PV | Springfield, MA | 2.4 GWh | 3.7 mi |
Springfield Solar PV | Springfield, MA | 6.2 GWh | 3.9 mi |
Stony Brook | Ludlow, MA | 64.7 GWh | 3.8 mi |