ADC Varner
24229 US Highway 65, Gould, AR 71643Plant Summary Information
ADC Varner is ranked #22 out of 66 solar farms in Arkansas in terms of total annual net electricity generation.
ADC Varner generated 1.7 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | ADC Varner |
|---|---|
| Utility Name | Entegrity Solar ADC, LLC |
| Location | Lincoln County, AR |
| Initial Operation Date | March 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 8.6 GWh |
| Annual Consumption | 29.5 k MMBtu |
| Ranked #6,596 out of 12,539 Power Plants Nationwide | |
| Ranked #2,144 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #65 out of 112 Arkansas Power Plants | |
| Ranked #22 out of 66 Arkansas Solar Power Plants | |
| Fuel Types | Solar |
Map of ADC Varner
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for ADC Varner.
Monthly Net Generation for ADC Varner
ADC Varner Details
| Summary Information | |
|---|---|
| Plant Name | ADC Varner (67513) |
| Plant Address | 24229 US Highway 65, Gould, AR 71643 |
| Utility | Entegrity Solar ADC, LLC (66235) |
| Latitude, Longitude | 34.0413, -91.62795 |
| Generation Dates on File | Feb 2024 to Dec 2024 |
| Initial Operation Date | March 2024 |
| Annual Generation | 8.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 23-338-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
| Grid Voltage | 25.00 kV |
| Energy Storage | No |
Generator 63612 Details Operating March 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4.9 MW |
| Summer Capacity | 4.9 MW |
| Winter Capacity | 3.9 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 15 |
| DC Net Capacity | 6.37 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 6.3 MW |
ADC Varner Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2134 | Syncarpha Puddon I Hybrid CSG | Northbridge, MA | 8.5 GWh |
| #2135 | Cyril | Cyril, OK | 8.7 GWh |
| #2136 | Scandia CSG | Scandia, MN | 8.7 GWh |
| #2137 | Fayetteville Public Schools (SWEPCO) | Booneville, AR | 8.7 GWh |
| #2138 | County Home Solar LLC | Rockingham, NC | 8.6 GWh |
| #2139 | McCallum Farm | Rowland, NC | 8.6 GWh |
| #2140 | Pollocksville Solar | Pollocksville, NC | 8.6 GWh |
| #2141 | Edenton Solar | Edenton, NC | 8.6 GWh |
| #2142 | SR Clarksville II, LLC | Clarksville, TN | 8.6 GWh |
| #2143 | Kelford (Cypress) | Kelford, NC | 8.6 GWh |
| #2145 | Bayboro Solar Farm | Alliance, NC | 8.6 GWh |
| #2146 | Route 19 #2 Community Solar Farm | Pike, NY | 8.6 GWh |
| #2147 | Ameresco HCE Solar LLC | Glenwood Springs, CO | 8.6 GWh |
| #2148 | Bladenboro Solar 2 | Bladenboro, NC | 8.6 GWh |
| #2149 | Sadiebrook NC Solar | Clarkton, NC | 8.6 GWh |
| #2150 | Blacksmith Road Solar 1 | Falmouth, MA | 8.5 GWh |
| #2151 | Meadowbrook Solar Farm | Rockwell, NC | 8.6 GWh |
| #2152 | Syncarpha Blandford Hybrid CSG | Blandford, MA | 8.5 GWh |
| #2153 | Beacon Solar, LLC | Easthampton, MA | 8.5 GWh |
| #2154 | Auten Road Farm, LLC | Gastonia, NC | 8.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding ADC Varner.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 57.2 mi |
| C&L | Star City, AR | 1.9 GWh | 11.7 mi |
| Chicot Solar | Lake Village, AR | 219.8 GWh | 42 mi |
| Clearwater Paper APP CB | Arkansas City, AR | 126.2 GWh | 32.2 mi |
| Crossroads Energy Center | Clarksdale, MS | 124.0 GWh | 61.8 mi |
| Dam 2 | Dumas, AR | 400.7 GWh | 18.3 mi |
| General Dynamics | Hampton, AR | 3.6 GWh | 60.6 mi |
| Gerald Andrus | Greenville, MS | 434.9 GWh | 56.1 mi |
| Harry L. Oswald | Little Rock, AR | 1.1 TWh | 50.8 mi |
| NLRED 2MW | North Little Rock, AR | 80.0 MWh | 57.8 mi |
| NLRED 5MW | North Little Rock, AR | 2.9 GWh | 57.8 mi |
| Pine Bluff Energy Center | Pine Bluff, AR | 827.1 GWh | 19.9 mi |
| Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 20.2 mi |
| Prairie Mist Solar | Montrose, AR | 225.1 GWh | 54.3 mi |
| Southside SD | Little Rock, AR | 1.7 GWh | 57.3 mi |
| Star City School District | Star City, AR | 2.8 GWh | 11.8 mi |
| Stuttgart Solar | Stuttgart, AR | 155.0 GWh | 29.5 mi |
| Two Pine Landfill Gas Recovery | North Little Rock, AR | 27.2 GWh | 62.5 mi |
| White Bluff | Redfield, AR | 3.1 TWh | 39.4 mi |
| Zeuber | Little Rock, AR | 7.3 GWh | 56.3 mi |