Roundhouse Wind Energy Project
939 I-80 Service Road, Cheyenne, WY 82059Plant Summary Information
Roundhouse Wind Energy Project is ranked #10 out of 69 power plants in Wyoming in terms of total annual net electricity generation.
Roundhouse Wind Energy Project generated 126.2 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Roundhouse Wind Energy Project |
|---|---|
| Utility Name | Roundhouse Renewable Energy, LLC |
| Location | Laramie County, WY |
| Initial Operation Date | June 2020 |
| Last Update | Aug 2026 |
| Annual Generation | 871.1 GWh |
| Annual Consumption | 3.1 M MMBtu |
| Ranked #833 out of 13,301 Power Plants Nationwide | |
| Ranked #109 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #10 out of 69 Wyoming Power Plants | |
| Ranked #4 out of 27 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
Map of Roundhouse Wind Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Roundhouse Wind Energy Project.
Monthly Net Generation for Roundhouse Wind Energy Project
Monthly Plant Fuel Consumption for Roundhouse Wind Energy Project
Roundhouse Wind Energy Project Details
| Summary Information | |
|---|---|
| Plant Name | Roundhouse Wind Energy Project (63133) |
| Plant Address | 939 I-80 Service Road, Cheyenne, WY 82059 |
| Utility | Roundhouse Renewable Energy, LLC (62913) |
| Latitude, Longitude | 41.09513, -105.10742 |
| Generation Dates on File | Jun 2020 to Aug 2026 |
| Initial Operation Date | June 2020 |
| Annual Generation | 871.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Platte River Power Authority (15143) |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 82059 Details Operating June 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 124 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 124 MW |
| Winter Capacity | 124 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 44 |
| Turbine Details | |
| Number Of Turbines | 44 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 12.9 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 295 |
Generator 82060 Details Operating June 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 79 MW |
| Nameplate Power Factor | 0.87 |
| Summer Capacity | 79 MW |
| Winter Capacity | 79 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 28 |
| Turbine Details | |
| Number Of Turbines | 28 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 12.9 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 295 |
Generator 82061 Details Operating June 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 23 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 23 MW |
| Winter Capacity | 23 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 10 |
| Turbine Details | |
| Number Of Turbines | 10 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 12.9 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 295 |
Roundhouse Wind Energy Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #99 | Karankawa Wind LLC | Mathis, TX | 886.5 GWh |
| #100 | Stephens Ranch Wind Energy LLC | O'Donnell, TX | 885.9 GWh |
| #101 | Canadian Breaks, LLC | Vega, TX | 885.7 GWh |
| #102 | Willow Springs Wind Farm | Weinert, TX | 884.6 GWh |
| #103 | Diamond Spring, LLC | Sulphur, OK | 882.7 GWh |
| #104 | Chisholm View Wind Project | Hunter, OK | 879.3 GWh |
| #105 | Tecolote Wind LLC | Duran, NM | 878.6 GWh |
| #106 | Shamrock Wind | TBD, TX | 859.1 GWh |
| #107 | La Joya NM | Encino, NM | 874.8 GWh |
| #108 | Little Blue Wind Project, LLC | Blue Hill, NE | 872.5 GWh |
| #110 | El Sauz Ranch Wind, LLC | San Perlita, TX | 870.0 GWh |
| #111 | El Campo Wind | Truscott, TX | 867.6 GWh |
| #112 | Vineyard Wind 1 | Edgartown, MA | 866.5 GWh |
| #113 | Emmons-Logan Wind, LLC | Linton, ND | 866.2 GWh |
| #114 | Persimmon Creek Wind Farm 1, LLC | Vici, OK | 864.2 GWh |
| #115 | Sweetland Wind Farm, LLC | St. Lawrence, SD | 863.7 GWh |
| #116 | Crowned Ridge Wind II Energy Center | Watertown, SD | 863.5 GWh |
| #117 | Hubbard Wind | Mt Calm, TX | 863.3 GWh |
| #118 | Haystack Wind Project, LLC | Carroll, NE | 862.4 GWh |
| #119 | Blazing Star Wind Farm 1 | Hendricks, MN | 853.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Roundhouse Wind Energy Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Thompson | Loveland, CO | 3.3 GWh | 47 mi |
| Bison Solar LLC | Wellington, CO | 54.5 GWh | 16.8 mi |
| Black Hollow Sun | Auit, CO | 403.1 GWh | 35.7 mi |
| CBEP Solar 3 | Fort Collins, CO | 10.0 MWh | 35.4 mi |
| CBEP SOLAR 6, LLC | Greeley, CO | 2.7 GWh | 47.1 mi |
| Cheyenne Prairie Generating Station | Cheyenne, WY | 492.9 GWh | 20.3 mi |
| CO- CSU- Fort Collins | Fort Collins, CO | 1.9 GWh | 34.9 mi |
| CO- CSU- Fort Collins II | Fort Collins, CO | 3.0 GWh | 34.8 mi |
| Corriedale Wind Energy | Cheyenne, WY | 224.2 GWh | 6.5 mi |
| Coyote Ridge Community Solar | Fort Collins, CO | 3.0 GWh | 41.1 mi |
| ECA CO Greeley | Greeley, CO | 6.5 GWh | 47.1 mi |
| Happy Jack Windpower Project | Cheyenne, WY | 66.0 GWh | 6.5 mi |
| Rawhide | Wellington, CO | 1.6 TWh | 16.8 mi |
| Rawhide Prairie Solar Hybrid | Wellington, CO | 44.9 GWh | 17.1 mi |
| Roundhouse Renewable Energy II | Granite, WY | 406.0 GWh | 6.5 mi |
| Silver Sage Windpower | Cheyenne, WY | 104.2 GWh | 5 mi |
| Skylark | Severance, CO | 8.7 GWh | 37.4 mi |
| South Cheyenne Solar | South Greeley, WY | 319.6 GWh | 17.9 mi |
| SR Skylark B | Severance, CO | 1.2 GWh | 37.3 mi |
| SR Skylark C | Windsor, CO | 1.9 GWh | 37.6 mi |