Lagoon Creek

615 Elm Tree Rd., Brownsville, TN 38012

Plant Summary Information

Lagoon Creek is ranked #7 out of 83 power plants in Tennessee in terms of total annual net electricity generation.

Lagoon Creek is comprised of 15 generators and generated 685.0 GWh during the 3-month period between February 2025 to May 2025.

Plant NameLagoon Creek
Utility NameTennessee Valley Authority
LocationHaywood County, TN
Initial Operation DateJune 2001
Last Update May 2025
Annual Generation 3.5 TWh
Annual Consumption 25.8 M MMBtu
Ranked #334 out of 12,312 Power Plants Nationwide
Ranked #186 out of 2,220 Natural Gas Power Plants Nationwide
Ranked #7 out of 83 Tennessee Power Plants
Ranked #3 out of 15 Tennessee Natural Gas Power Plants
Fuel Types Natural Gas

Map of Lagoon Creek

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lagoon Creek.

Create Your Account Today

Monthly Net Generation for Lagoon Creek

600k600k500k500k400k400k300k300k200k200k100k100k002003200320042004200520052006200620072007200820082009200920102010201120112012201220132013201420142015201520162016201720172018201820192019202020202021202120222022202320232024202420252025
Download SVG
Download PNG
Download CSV

Lagoon Creek Details

Summary Information
Plant NameLagoon Creek (7845)
Plant Address615 Elm Tree Rd., Brownsville, TN 38012
UtilityTennessee Valley Authority (18642)
Latitude, Longitude35.6578, -89.3964
Generation Dates on FileJan 2003 to May 2025
Initial Operation DateJune 2001
Annual Generation 3.5 TWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthorityTennessee Valley Authority (TVA)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceMemphis Sands Aquifer
Ash Impoundment
Transmission / Distribution OwnerTennessee Valley Authority (18642) TN
Grid Voltage 500.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name TEXAS GAS TRANSMISSION LLC
Natural Gas StorageNo

Generator GT1 Details Operating June 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity73.9 MW
Winter Capacity94.3 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2001
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas73.9 MW
Net Winter Capacity With Natural Gas94.3 MW
Net Summer Capacity With Oil75.2 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT2 Details Operating June 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity73.9 MW
Winter Capacity94.3 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2001
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas73.9 MW
Net Winter Capacity With Natural Gas94.3 MW
Net Summer Capacity With Oil75.2 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT3 Details Operating June 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity73.9 MW
Winter Capacity94.3 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2001
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas73.9 MW
Net Winter Capacity With Natural Gas94.3 MW
Net Summer Capacity With Oil75.2 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT4 Details Operating June 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity73.9 MW
Winter Capacity94.3 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2001
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas73.9 MW
Net Winter Capacity With Natural Gas94.3 MW
Net Summer Capacity With Oil75.2 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT5 Details Operating June 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity73.9 MW
Winter Capacity94.3 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2001
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas73.9 MW
Net Winter Capacity With Natural Gas94.3 MW
Net Summer Capacity With Oil75.2 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT6 Details Operating June 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity73.9 MW
Winter Capacity94.3 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2001
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas73.9 MW
Net Winter Capacity With Natural Gas94.3 MW
Net Summer Capacity With Oil75.2 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT7 Details Operating July 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity73.9 MW
Winter Capacity94.3 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2001
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas73.9 MW
Net Winter Capacity With Natural Gas94.3 MW
Net Summer Capacity With Oil75.2 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT8 Details Operating July 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity73.9 MW
Winter Capacity94.3 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2001
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas73.9 MW
Net Winter Capacity With Natural Gas94.3 MW
Net Summer Capacity With Oil75.2 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT10 Details Operating June 2002

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity86.2 MW
Nameplate Power Factor0.9
Summer Capacity72.7 MW
Winter Capacity92.8 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2002
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas72.7 MW
Net Winter Capacity With Natural Gas92.8 MW
Net Summer Capacity With Oil74.3 MW
Net Winter Capacity With Oil94.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT11 Details Operating June 2002

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity86.2 MW
Nameplate Power Factor0.9
Summer Capacity72.7 MW
Winter Capacity92.8 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2002
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas72.7 MW
Net Winter Capacity With Natural Gas92.8 MW
Net Summer Capacity With Oil74.3 MW
Net Winter Capacity With Oil94.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT12 Details Operating June 2002

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity86.2 MW
Nameplate Power Factor0.9
Summer Capacity72.7 MW
Winter Capacity92.8 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2002
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas72.7 MW
Net Winter Capacity With Natural Gas92.8 MW
Net Summer Capacity With Oil74.3 MW
Net Winter Capacity With Oil94.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT9 Details Operating June 2002

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity86.2 MW
Nameplate Power Factor0.9
Summer Capacity72.7 MW
Winter Capacity92.8 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2002
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas72.7 MW
Net Winter Capacity With Natural Gas92.8 MW
Net Summer Capacity With Oil74.3 MW
Net Winter Capacity With Oil96 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator CTG1 Details Operating September 2010

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
Nameplate Capacity173.4 MW
Nameplate Power Factor0.9
Summer Capacity160 MW
Winter Capacity190 MW
Minimum Load78.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo

Generator CTG2 Details Operating September 2010

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
Nameplate Capacity173.4 MW
Nameplate Power Factor0.9
Summer Capacity160 MW
Winter Capacity190 MW
Minimum Load78.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo

Generator STG1 Details Operating September 2010

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Steam Part
Unit CodeCC1
OwnershipSingle Owner
Duct BurnersYes
Nameplate Capacity257.6 MW
Nameplate Power Factor0.9
Summer Capacity205 MW
Winter Capacity235 MW
Minimum Load96.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo

Lagoon Creek Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#176Victor J Daniel JrEscatawpa, MS5.3 TWh
#177Cricket Valley EnergyDover, NY3.7 TWh
#178Rayburn Energy Station LLCSherman, TX3.6 TWh
#179Odyssey Energy Altura Cogen, LLCChannelview, TX3.6 TWh
#180Curtis H Stanton Energy CenterOrlando, FL3.6 TWh
#181Thomas C FergusonHorseshoe Bay, TX3.6 TWh
#182Klamath Cogeneration PlantKlamath Falls, OR3.6 TWh
#183Bridgeport StationBridgeport, CT3.6 TWh
#184Bethlehem Energy CenterGlenmont, NY3.6 TWh
#185Mesquite Generating Station Block 1Arlington, AZ3.6 TWh
#187Harquahala Generating ProjectTonopah, AZ3.5 TWh
#188L V Sutton Combined CycleWilmington, NC3.5 TWh
#189Fox Energy CenterWrightstown, WI3.5 TWh
#190Jim BridgerPoint of Rocks, WY7.9 TWh
#191Midulla Generating StationBowling Green, FL3.5 TWh
#192Dearborn Industrial GenerationDearborn, MI4.1 TWh
#193Central Alabama Generating StationBillingsley, AL3.4 TWh
#194CherokeeDenver, CO3.4 TWh
#195Marshalltown Generating StationMarshalltown, IA3.4 TWh
#196Jack Fusco Energy CenterThompsons, TX3.4 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Lagoon Creek.

Plant NamePlant LocationAnnual GenerationDistance
Brownsville Peaking PowerBrownsville, TN67.5 GWh13.6 mi
Crooked Lake Solar, LLCBlytheville, AR386.1 GWh28.1 mi
Dell Power StationDell, AR3.9 TWh38 mi
Driver SolarOsceola, AR289.5 GWh32.2 mi
Haywood SolarBrownsville, TN5.4 GWh8.3 mi
IKEA Memphis 508Cordova, TN934.0 MWh39.5 mi
KennettKennett, MO1.8 GWh54.1 mi
Latitude Solar CenterWhiteville, TN24.3 GWh27.5 mi
Millington Solar FarmMillington, TN95.0 GWh33.4 mi
Plum Point Energy StationOsceola, AR3.9 TWh31 mi
Providence SolarMadison, TN29.1 GWh20.3 mi
Selmer IISelmer, TN13.1 GWh54.2 mi
Somerville SolarSomerville, TN3.2 GWh30 mi
SR BolivarBolivar, TN6.3 GWh34.9 mi
SR Canadaville, LLCCollierville, TN36.1 GWh40.2 mi
SR Innovation - NIKE PVMemphis, TN3.4 GWh40.3 mi
SR Jackson IIJackson, TN3.3 GWh27.1 mi
SR McKellarDenmark, TN131.2 GWh27 mi
West Tennessee Solar FarmStanton, TN2.4 GWh17.2 mi
WildberryMoscow, TN24.5 GWh41.5 mi