Clean Energy Future-Lordstown, LLC
1853 Henn Parkway, Lordstown, OH 44481Plant Summary Information
Clean Energy Future-Lordstown, LLC is ranked #9 out of 191 power plants in Ohio in terms of total annual net electricity generation.
Clean Energy Future-Lordstown, LLC is comprised of 3 generators and generated 1.8 TWh during the 3-month period between December 2024 to March 2025.
Plant Name | Clean Energy Future-Lordstown, LLC |
---|---|
Utility Name | Clean Energy Future-Lordstown, LLC |
Location | Trumbull County, OH |
Initial Operation Date | October 2018 |
Last Update | Mar 2025 |
Annual Generation | 6.4 TWh |
Annual Consumption | 46.5 M MMBtu |
Ranked #146 out of 12,288 Power Plants Nationwide | |
Ranked #55 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #9 out of 191 Ohio Power Plants | |
Ranked #4 out of 53 Ohio Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Clean Energy Future-Lordstown, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clean Energy Future-Lordstown, LLC.
Monthly Net Generation for Clean Energy Future-Lordstown, LLC
Clean Energy Future-Lordstown, LLC Details
Summary Information | |
---|---|
Plant Name | Clean Energy Future-Lordstown, LLC (60376) |
Plant Address | 1853 Henn Parkway, Lordstown, OH 44481 |
Utility | Clean Energy Future-Lordstown, LLC (60170) |
Latitude, Longitude | 41.14889, -80.85162 |
Generation Dates on File | Jul 2018 to Mar 2025 |
Initial Operation Date | October 2018 |
Annual Generation | 6.4 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | American Transmission Systems Inc (56162) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | EAST OHIO GAS COMP DOMINION EAST OH |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG1 Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | PJM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PJM |
Nameplate Capacity | 311 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 268.1 MW |
Winter Capacity | 306.6 MW |
Minimum Load | 121 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | PJM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PJM |
Nameplate Capacity | 311 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 268.6 MW |
Winter Capacity | 303.7 MW |
Minimum Load | 121 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC01 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | PJM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PJM |
Nameplate Capacity | 340 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 321.3 MW |
Winter Capacity | 329.9 MW |
Minimum Load | 136 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Clean Energy Future-Lordstown, LLC Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#45 | Lee Combined Cycle Plant | Goldsboro, NC | 7.0 TWh |
#46 | Colorado Bend II | Wharton, TX | 6.8 TWh |
#47 | Big Bend | Apollo Beach, FL | 6.9 TWh |
#48 | Port Washington Generating Station | Port Washington, WI | 6.8 TWh |
#49 | Jack County | Bridgeport, TX | 6.7 TWh |
#50 | Lake Charles Power | West Lake, LA | 6.6 TWh |
#51 | Freestone Energy Center | Fairfield, TX | 6.6 TWh |
#52 | Cape Canaveral | Cocoa, FL | 6.5 TWh |
#53 | Midlothian Energy Facility | Midlothian, TX | 6.5 TWh |
#54 | Marcus Hook Energy LP | Marcus Hook, PA | 6.5 TWh |
#56 | Montgomery County | Willis, TX | 6.4 TWh |
#57 | Waterford Power, LLC | Waterford, OH | 6.4 TWh |
#58 | Manatee | Parrish, FL | 6.4 TWh |
#59 | CPV Three Rivers Energy Center | Morris, IL | 6.3 TWh |
#60 | Dania Beach 7 | Ft. Lauderdale, FL | 6.3 TWh |
#61 | Guadalupe Generating Station | Marion, TX | 6.3 TWh |
#62 | Allen | Memphis, TN | 6.3 TWh |
#63 | Hamilton Patriot Generation Plant | Montgomery, PA | 6.3 TWh |
#64 | Indeck Niles Energy Center | Niles, MI | 6.2 TWh |
#65 | Port Everglades | Ft. Lauderdale, FL | 6.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clean Energy Future-Lordstown, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 7.9 GWh | 37.3 mi |
Beaver Solar LLC | Beaver, PA | 514.0 MWh | 41.9 mi |
Beaver Valley | Shippingport, PA | 14.4 TWh | 42.5 mi |
Beaver Valley Patterson Dam | Beaver Falls, PA | 4.2 GWh | 39.5 mi |
Carroll County Energy | Carrollton, OH | 5.4 TWh | 39.2 mi |
Clevelandcliffs Warren | Warren, OH | 53.3 GWh | 4.7 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 1.4 GWh | 32.4 mi |
Foxconn Ohio | Warren, OH | 379.0 MWh | 1.7 mi |
Hickory Run Energy Station | New Castle, PA | 6.1 TWh | 24.4 mi |
IGS AKC1 | Akron, OH | 4.5 GWh | 38.6 mi |
KSU Trumbull | Warren, OH | 1.6 GWh | 9 mi |
Mahoning | New Springfield, OH | 26.8 GWh | 21.3 mi |
New Castle Plant | West Pittsburg, PA | 695.9 GWh | 29.1 mi |
Niles RTO BTM | Niles, OH | 526.0 MWh | 5.3 mi |
Pine 1 Solar | Hookstown, PA | 26.4 GWh | 42.1 mi |
Pine 2 Solar | Hookstown, PA | 29.7 GWh | 41.9 mi |
South Field Energy | Wellsville, OH | 8.4 TWh | 36.6 mi |
Summit Street Power Plant | Kent, OH | 34.1 GWh | 25.5 mi |
Townsend Hydro | New Brighton, PA | 16.0 GWh | 40.1 mi |
Wabtec U.S Rail, Grove City Engine Plant | Grove City, PA | 5.7 GWh | 38.8 mi |