Hickory Run Energy Station
4900 Edinburg Road, New Castle, PA 16102Plant Summary Information
Hickory Run Energy Station is ranked #48 out of 2,218 natural gas power plants nationwide in terms of total annual net electricity generation.
Hickory Run Energy Station is comprised of 3 generators and generated 1.9 TWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Hickory Run Energy Station |
|---|---|
| Utility Name | Hickory Run Energy, LLC |
| Location | Lawrence County, PA |
| Initial Operation Date | May 2020 |
| Last Update | Aug 2026 |
| Annual Generation | 6.9 TWh |
| Annual Consumption | 49.8 M MMBtu |
| Ranked #139 out of 13,301 Power Plants Nationwide | |
| Ranked #48 out of 2,218 Natural Gas Power Plants Nationwide | |
| Ranked #10 out of 257 Pennsylvania Power Plants | |
| Ranked #6 out of 77 Pennsylvania Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Hickory Run Energy Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hickory Run Energy Station.
Monthly Net Generation for Hickory Run Energy Station
Monthly Plant Fuel Consumption for Hickory Run Energy Station
Hickory Run Energy Station Details
| Summary Information | |
|---|---|
| Plant Name | Hickory Run Energy Station (61028) |
| Plant Address | 4900 Edinburg Road, New Castle, PA 16102 |
| Utility | Hickory Run Energy, LLC (60659) |
| Latitude, Longitude | 40.99444, -80.43 |
| Generation Dates on File | May 2020 to Aug 2026 |
| Initial Operation Date | May 2020 |
| Annual Generation | 6.9 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 19-153-000, 19-2564-000, 20-1820-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Reclaimed Water |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pennsylvania Power Co (14716) PA |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | TENNESSEE GAS PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator CTG1 Details Operating May 2020
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | HRES |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | HICRUNEC20 KV 1A CTG |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | HICRUNEC22 KV 1S STG |
| Nameplate Capacity | 295 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 273.5 MW |
| Winter Capacity | 302 MW |
| Minimum Load | 146 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating May 2020
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | HRES |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | HICRUNEC20 KV 1B CTG |
| Nameplate Capacity | 295 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 274.6 MW |
| Winter Capacity | 300.8 MW |
| Minimum Load | 146 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating May 2020
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | HRES |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | HICRUNEC22 KV 1S STG |
| Nameplate Capacity | 443.7 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 414.2 MW |
| Winter Capacity | 417.1 MW |
| Minimum Load | 195 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Hickory Run Energy Station Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #38 | Midlothian Energy Facility | Midlothian, TX | 7.4 TWh |
| #39 | Lamar Power Project | Paris, TX | 7.4 TWh |
| #40 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 7.2 TWh |
| #41 | Moxie Freedom Generation Plant | Salem Township, PA | 7.2 TWh |
| #42 | Manatee | Parrish, FL | 7.2 TWh |
| #43 | Dania Beach 7 | Ft. Lauderdale, FL | 7.1 TWh |
| #44 | Belews Creek | Belews Creek, NC | 9.9 TWh |
| #45 | Turkey Point | Homestead, FL | 19.8 TWh |
| #46 | New Covert Generating Facility | Covert, MI | 6.9 TWh |
| #47 | Waterford Power, LLC | Waterford, OH | 6.9 TWh |
| #49 | Lake Charles Power | West Lake, LA | 6.9 TWh |
| #50 | Cricket Valley Energy | Dover, NY | 6.8 TWh |
| #51 | Sithe Independence Station | Oswego, NY | 6.8 TWh |
| #52 | Colorado Bend II | Wharton, TX | 6.7 TWh |
| #53 | Port Washington Generating Station | Port Washington, WI | 6.6 TWh |
| #54 | Chuck Lenzie Generating Station | Apex, NV | 6.6 TWh |
| #55 | Big Bend | Apollo Beach, FL | 6.5 TWh |
| #56 | Jackson Generation, LLC | Elwood, IL | 6.5 TWh |
| #57 | CPV Three Rivers Energy Center | Morris, IL | 6.5 TWh |
| #58 | Middletown- Ohio | Lordstown, OH | 6.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hickory Run Energy Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beaver Solar LLC | Beaver, PA | 73.0 MWh | 21.7 mi |
| Beaver Valley | Shippingport, PA | 14.5 TWh | 25.7 mi |
| Beaver Valley Patterson Dam | Beaver Falls, PA | 4.4 GWh | 18.3 mi |
| Foxconn Ohio | Warren, OH | 160.0 MWh | 25.9 mi |
| Gaucho Solar | Clinton, PA | 32.0 GWh | 33.9 mi |
| KSU Trumbull | Warren, OH | 1.5 GWh | 28.9 mi |
| Mahoning | New Springfield, OH | 27.4 GWh | 9.8 mi |
| Middletown- Ohio | Lordstown, OH | 6.4 TWh | 24.4 mi |
| New Castle Plant | West Pittsburg, PA | 695.4 GWh | 5 mi |
| Niles Power Plant | Niles, OH | 172.5 MWh | 20.4 mi |
| Niles RTO BTM | Niles, OH | 283.0 MWh | 20.7 mi |
| PG Solar 1 | Findlay Township, PA | 4.2 GWh | 36.6 mi |
| Pine 1 Solar | Hookstown, PA | 28.5 GWh | 26.2 mi |
| Pine 2 Solar | Hookstown, PA | 28.5 GWh | 26.3 mi |
| Pittsburgh Airport Gas Plant | Coraopolis, PA | 118.0 GWh | 36 mi |
| Shell Chemical Appalachia LLC | Monaca, PA | 1.8 TWh | 22.8 mi |
| South Field Energy | Wellsville, OH | 7.9 TWh | 28 mi |
| Townsend Hydro | New Brighton, PA | 14.2 GWh | 19 mi |
| Trumbull Energy Center | Warren, OH | 2.4 TWh | 24.4 mi |
| Wabtec U.S Rail, Grove City Engine Plant | Grove City, PA | 3.5 GWh | 20.8 mi |