10400 130 Road, Spearville, KS 67863Plant Summary Information
Western Plains Wind Farm is ranked #11 out of 174 power plants in Kansas in terms of total annual net electricity generation.
Western Plains Wind Farm generated 246.7 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Western Plains Wind Farm |
|---|---|
| Utility Name | Evergy Kansas Central, Inc |
| Location | Ford County, KS |
| Initial Operation Date | March 2017 |
| Last Update | Nov 2025 |
| Annual Generation | 1.0 TWh |
| Annual Consumption | 3.9 M MMBtu |
| Ranked #721 out of 12,574 Power Plants Nationwide | |
| Ranked #53 out of 1,370 Wind Power Plants Nationwide | |
| Ranked #11 out of 174 Kansas Power Plants | |
| Ranked #4 out of 52 Kansas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Westar Energy Inc (2016 to 2018) Evergy Kansas Central, Inc (2019 to 2024) |
Map of Western Plains Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Western Plains Wind Farm.
Monthly Net Generation for Western Plains Wind Farm
Western Plains Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Western Plains Wind Farm (60689) |
| Plant Address | 10400 130 Road, Spearville, KS 67863 |
| Utility | Evergy Kansas Central, Inc (22500) |
| Latitude, Longitude | 37.8548, -99.67981 |
| Generation Dates on File | Mar 2017 to Nov 2025 |
| Initial Operation Date | March 2017 |
| Annual Generation | 1.0 TWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Westar Energy Inc (22500) KS |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 1 Details Operating March 2017
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | WR.WPW |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | WR.WPW |
| Nameplate Capacity | 280.6 MW |
| Summer Capacity | 280.6 MW |
| Winter Capacity | 280.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2017 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 122 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 122 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.5 |
Western Plains Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #43 | Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh |
| #44 | Thunderhead Wind Energy LLC | Boone, NE | 1.1 TWh |
| #45 | Deuel Harvest Wind Energy LLC | Clear Lake, SD | 1.1 TWh |
| #46 | 25 Mile Creek | Gage, OK | 1.1 TWh |
| #47 | Bronco Plains Wind, LLC | Flagler, CO | 1.1 TWh |
| #48 | Upland Prairie | Spencer, IA | 1.1 TWh |
| #49 | Ida Grove Wind | Ida Grove, IA | 1.1 TWh |
| #50 | Boswell Wind | Rock River, WY | 1.1 TWh |
| #51 | Bethel Wind Farm LLC | Dimmitt, TX | 1.1 TWh |
| #52 | Clines Corners Wind Farm LLC | Encino, NM | 1.1 TWh |
| #54 | El Cabo Wind | Encino, NM | 1.0 TWh |
| #55 | Rock Creek Wind Project | Tarkio, MO | 1.0 TWh |
| #56 | Radfords Run Wind Farm | Maroa, IL | 1.0 TWh |
| #57 | Limestone Wind Project | Coolidge, TX | 1.0 TWh |
| #58 | Solomon Forks Wind Project, LLC | Colby, KS | 1.0 TWh |
| #59 | Lincoln Land Wind | TBD, IL | 1.0 TWh |
| #60 | Triple H Wind Project | Highmore, SD | 1.0 TWh |
| #61 | Roosevelt County | Portales, NM | 1.0 TWh |
| #62 | Dakota Range Wind | Marvin, SD | 1.0 TWh |
| #63 | Priddy Wind Project | Goldthwaite, TX | 997.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Western Plains Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alexander Wind Farm LLC | Alexander, KS | 188.8 GWh | 40.5 mi |
| Ashland | Ashland, KS | 24.0 MWh | 45.9 mi |
| Bloom Wind | Minneola, KS | 584.0 GWh | 28.8 mi |
| Cimarron Bend III | Minneola, KS | 578.1 GWh | 37.6 mi |
| Cimarron Bend Wind Project I, LLC | Minneola, KS | 753.5 GWh | 38.5 mi |
| Cimarron Bend Wind Project II, LLC | Minneola, KS | 762.2 GWh | 38.5 mi |
| Cimarron Wind Energy LLC | Cimmaron, KS | 397.6 GWh | 32.8 mi |
| Cimarron Windpower II | Cimarron, KS | 284.9 GWh | 37.9 mi |
| CMS-Coldwater | Coldwater, KS | 2.5 GWh | 43.2 mi |
| Ensign Wind LLC | Montezuma, KS | 464.2 GWh | 36.7 mi |
| Fort Dodge | Dodge City, KS | 44.1 GWh | 17 mi |
| Gray County Wind Energy | Montezuma, KS | 264.1 GWh | 41.7 mi |
| Greensburg | Greensburg, KS | 10.5 GWh | 27.9 mi |
| Greensburg Solar | Greensburg, KS | 2.3 GWh | 27.4 mi |
| Iron Star Wind Project | Dodge City, KS | 1.2 TWh | 21.8 mi |
| Ironwood Wind | Spearville, KS | 251.7 GWh | 5.8 mi |
| Jetmore | Jetmore, KS | 117.0 MWh | 19.5 mi |
| Shooting Star | Mullinville, KS | 187.2 GWh | 26.5 mi |
| Spearville | Ford, KS | 133.6 GWh | 4 mi |
| Spearville 3 LLC | Spearville, KS | 170.4 GWh | 8.6 mi |