Bowman Wind
TBD, Bowman, ND 58623Plant Summary Information
Bowman Wind is ranked #13 out of 59 power plants in North Dakota in terms of total annual net electricity generation.
Bowman Wind generated 181.0 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Bowman Wind |
|---|---|
| Utility Name | Bowman Wind, LLC |
| Location | Bowman County, ND |
| Initial Operation Date | November 2025 |
| Last Update | Aug 2026 |
| Annual Generation | 658.2 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,077 out of 13,301 Power Plants Nationwide | |
| Ranked #243 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #13 out of 59 North Dakota Power Plants | |
| Ranked #5 out of 42 North Dakota Wind Power Plants | |
| Fuel Types | Wind |
Map of Bowman Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bowman Wind.
Monthly Net Generation for Bowman Wind
Monthly Plant Fuel Consumption for Bowman Wind
Bowman Wind Details
| Summary Information | |
|---|---|
| Plant Name | Bowman Wind (68182) |
| Plant Address | TBD, Bowman, ND 58623 |
| Utility | Bowman Wind, LLC (66618) |
| Latitude, Longitude | 46.13763, -103.59954 |
| Generation Dates on File | Nov 2025 to Aug 2026 |
| Initial Operation Date | November 2025 |
| Annual Generation | 658.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Basin Electric Power Coop (1307) ND |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator BWMW Details Operating November 2025
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 74 |
| Turbine Details | |
| Number Of Turbines | 74 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 17.9 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 292 |
Bowman Wind Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #233 | Streator Cayuga Ridge South | Odell, IL | 673.8 GWh |
| #234 | Wildorado Wind LLC | Vega, TX | 672.5 GWh |
| #235 | Ledyard Windpower, LLC | Lakota, IA | 671.8 GWh |
| #236 | Wildcat Wind Farm I, LLC | Elwood, IN | 671.7 GWh |
| #237 | East Fork Wind Project, LLC | Colby, KS | 670.7 GWh |
| #238 | Wildcat Ranch Wind Project | Morton, TX | 669.6 GWh |
| #239 | Sundance Wind Project, LLC | Alva, OK | 669.4 GWh |
| #240 | Panther Creek Wind Farm Three | Big Spring, TX | 665.9 GWh |
| #241 | Meadow Lake Wind Farm VI LLC | Remington, IN | 660.8 GWh |
| #242 | South Hurlburt Wind LLC | Arlington, OR | 658.9 GWh |
| #244 | Sholes Wind Energy Center | Randolph, NE | 657.1 GWh |
| #245 | Brazos Wind Farm | Fluvanna, TX | 655.2 GWh |
| #246 | Patriot Wind Farm | Bishop, TX | 654.0 GWh |
| #247 | Cedar Point Wind | Limon, CO | 653.1 GWh |
| #248 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 651.5 GWh |
| #249 | Windy Flats Wind Project | Centerville, WA | 650.9 GWh |
| #250 | Glacier Sands Wind Power, LLC | Mason City, IL | 649.5 GWh |
| #251 | Beaver Creek Wind Facility | Big Timber, MT | 647.7 GWh |
| #252 | Horseshoe Bend Wind LLC | Arlington, OR | 646.5 GWh |
| #253 | Chickasaw Wind Farm | New Hampton, IA | 645.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bowman Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope Valley | Beulah, ND | 5.8 TWh | 119.3 mi |
| Brady II Wind Energy Center | Dickinson, ND | 633.8 GWh | 50.7 mi |
| Brady Wind Energy Center | Dickinson, ND | 638.9 GWh | 53.1 mi |
| Cedar Hills Wind Farm | Rhame, ND | 47.6 GWh | 11 mi |
| Coyote | Beulah, ND | 2.4 TWh | 112.9 mi |
| Diamond Willow Wind Facility | Baker, MT | 88.0 GWh | 29.5 mi |
| Dry Fork Station | Gillette, WY | 2.8 TWh | 151 mi |
| Glen Ullin Energy Center | Glen Ullin, ND | 429.8 GWh | 102.2 mi |
| Glen Ullin Station 6 | Glen Ullin, ND | 32.3 GWh | 99.6 mi |
| Glendive GT | Glendive, MT | 15.9 GWh | 83.3 mi |
| Lewis & Clark | Richland, MT | 10.7 GWh | 109.7 mi |
| Lonesome Creek Station | Alexander, ND | 841.7 GWh | 114.6 mi |
| Oliver Wind IV | Hannover, ND | 819.2 GWh | 116.3 mi |
| Spearfish Hydro | Spearfish, SD | 18.4 GWh | 115.3 mi |
| Sunflower Wind Project | Mandan, ND | 429.7 GWh | 87.2 mi |
| Thunder Spirit Wind, LLC | Hettinger, ND | 568.3 GWh | 49.8 mi |
| Willow Creek Wind Power LLC | Newell, SD | 400.0 GWh | 92.6 mi |
| Wygen 2 | Gillette, WY | 595.6 GWh | 154.2 mi |
| Wygen III | Gillette, WY | 95.0 GWh | 154.2 mi |
| Wyodak | Gillette, WY | 2.0 TWh | 154.3 mi |