C&L
138 Hwy 199, Star City, AR 71667Plant Summary Information
C&L is ranked #48 out of 71 solar farms in Arkansas in terms of total annual net electricity generation.
C&L generated 401.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | C&L |
|---|---|
| Utility Name | Today's Power, Inc. |
| Location | Lincoln County, AR |
| Initial Operation Date | June 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 2.2 GWh |
| Annual Consumption | 7.8 k MMBtu |
| Ranked #10,615 out of 13,081 Power Plants Nationwide | |
| Ranked #5,515 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #90 out of 115 Arkansas Power Plants | |
| Ranked #48 out of 71 Arkansas Solar Power Plants | |
| Fuel Types | Solar |
Map of C&L
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for C&L.
Monthly Net Generation for C&L
Monthly Plant Fuel Consumption for C&L
C&L Details
| Summary Information | |
|---|---|
| Plant Name | C&L (66590) |
| Plant Address | 138 Hwy 199, Star City, AR 71667 |
| Utility | Today's Power, Inc. (61204) |
| Latitude, Longitude | 34.07549, -91.82832 |
| Generation Dates on File | Jan 2022 to Dec 2025 |
| Initial Operation Date | June 2020 |
| Annual Generation | 2.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | C & L Electric Coop Corp (2678) AR |
| Grid Voltage | 0.48 kV / 12.47 kV |
| Energy Storage | No |
Generator SOL Details Operating June 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2020 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 1.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
C&L Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5505 | CBP Solar | Buchanan, NY | 2.2 GWh |
| #5506 | Lane Ave Solar LLC | North Brookfield, MA | 2.2 GWh |
| #5507 | Corning Pharmaceutical Glass | Vineland, NJ | 2.2 GWh |
| #5508 | Jack's Solar Garden | Longmont, CO | 2.2 GWh |
| #5509 | USS Cosmo Solar LLC (CSG) | Danube, MN | 2.2 GWh |
| #5510 | Huntsville-Ark Valley, KS | Huntsville, KS | 2.2 GWh |
| #5511 | Apollo | Acushnet, MA | 2.1 GWh |
| #5512 | MN Buffalo Lake 212-2 LLC (CSG) | Buffalo Lake, MN | 2.2 GWh |
| #5513 | Davidson V | Lexington, NC | 2.2 GWh |
| #5514 | Star City School District | Star City, AR | 2.2 GWh |
| #5516 | USS Danube Solar LLC | Danube, MN | 2.2 GWh |
| #5517 | FreeState Kiro Solar I | Silver Lake, KS | 2.2 GWh |
| #5518 | Route 57 Solar | Agawam, MA | 2.2 GWh |
| #5519 | Rutgers Busch Liv (Lot 55, 58, 58A, 58B) | Piscataway, NJ | 2.2 GWh |
| #5520 | MN East Regal LLC (CSG) | Paynesville, MN | 2.2 GWh |
| #5521 | Pivot Energy PPA 22 | Visalia, CA | 2.2 GWh |
| #5522 | Bluefin Origination 1 | Brandywine, MD | 2.2 GWh |
| #5523 | St. Paul-Howard Greeley | St. Paul, NE | 2.2 GWh |
| #5524 | South Garden | Winstead, MN | 2.2 GWh |
| #5525 | The Village at Orchard Ridge (TVOR) | Winchester, VA | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding C&L.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ADC Varner | Gould, AR | 8.6 GWh | 11.7 mi |
| Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 57.2 mi |
| Chicot Solar | Lake Village, AR | 213.2 GWh | 49.6 mi |
| Clearwater Paper APP CB | Arkansas City, AR | 123.3 GWh | 42.4 mi |
| Dam 2 | Dumas, AR | 385.1 GWh | 30 mi |
| General Dynamics | Hampton, AR | 3.5 GWh | 52.4 mi |
| Harry L. Oswald | Little Rock, AR | 929.3 GWh | 42 mi |
| Murray | North Little Rock, AR | 116.4 GWh | 58.2 mi |
| NLRED 2MW | North Little Rock, AR | 4.5 GWh | 50.2 mi |
| NLRED 5MW | North Little Rock, AR | 11.3 GWh | 50.3 mi |
| Pine Bluff Energy Center | Pine Bluff, AR | 943.4 GWh | 10.7 mi |
| Prairie Mist Solar | Montrose, AR | 228.2 GWh | 57.4 mi |
| Redfield Solar | Sheridan, AR | 36.3 GWh | 26.7 mi |
| SAU Tech | Bearden, AR | 2.0 GWh | 53.7 mi |
| Southside SD | Little Rock, AR | 1.7 GWh | 49.5 mi |
| Star City School District | Star City, AR | 2.2 GWh | 8 mi |
| Stuttgart Solar | Stuttgart, AR | 149.5 GWh | 33.5 mi |
| Two Pine Landfill Gas Recovery | North Little Rock, AR | 29.8 GWh | 55.6 mi |
| White Bluff | Redfield, AR | 3.6 TWh | 29.9 mi |
| Zeuber | Little Rock, AR | 7.0 GWh | 48.3 mi |