C&L
138 Hwy 199, Star City, AR 71667Plant Summary Information
C&L is ranked #44 out of 52 solar farms in Arkansas in terms of total annual net electricity generation.
C&L generated 356.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | C&L |
---|---|
Utility Name | Today's Power, Inc. |
Location | Lincoln County, AR |
Initial Operation Date | June 2020 |
Last Update | Dec 2024 |
Annual Generation | 1.9 GWh |
Annual Consumption | 6.9 k MMBtu |
Ranked #10,416 out of 12,299 Power Plants Nationwide | |
Ranked #5,201 out of 6,182 Solar Power Plants Nationwide | |
Ranked #87 out of 97 Arkansas Power Plants | |
Ranked #44 out of 52 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of C&L
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for C&L.
Monthly Net Generation for C&L
C&L Details
Summary Information | |
---|---|
Plant Name | C&L (66590) |
Plant Address | 138 Hwy 199, Star City, AR 71667 |
Utility | Today's Power, Inc. (61204) |
Latitude, Longitude | 34.07549, -91.82832 |
Generation Dates on File | Jan 2022 to Dec 2024 |
Initial Operation Date | June 2020 |
Annual Generation | 1.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | C & L Electric Coop Corp (2678) AR |
Grid Voltage | 0.48 kV / 12.47 kV |
Energy Storage | No |
Generator SOL Details Operating June 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
C&L Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5191 | A Street 1 | Johnston, RI | 1.9 GWh |
#5192 | Town of Foxborough - Landfill (SREC II) | Foxborough, MA | 1.9 GWh |
#5193 | Bainbridge Solar | Bainbridge, GA | 1.9 GWh |
#5194 | BWC Stony Brook, LLC Hybrid | Chelmsford, MA | 1.9 GWh |
#5195 | ER Bone Hill Solar, LLC | Northfield, VT | 1.9 GWh |
#5196 | BWC Muddy Brook, LLC Hybrid | Mendon, MA | 1.9 GWh |
#5197 | Maclay Solar Project | Sylmar, CA | 1.9 GWh |
#5198 | Havre de Grace II - E at Perryman | Perryman, MD | 1.9 GWh |
#5199 | FastSun 3 CSG | Albany, MN | 1.9 GWh |
#5200 | GD Richmond Buttonwoods I, LLC | Richmond, RI | 1.9 GWh |
#5202 | Mira Loma | Mira Loma, CA | 1.9 GWh |
#5203 | Lange Solar | Byron, MN | 1.9 GWh |
#5204 | Prairie Sky Solar Farm | Andover, KS | 1.9 GWh |
#5205 | Bakersfield 111 | Bakersfield, CA | 1.9 GWh |
#5206 | Acton Solar Landfill | Acton, MA | 1.9 GWh |
#5207 | Carver | North Carver, MA | 1.9 GWh |
#5208 | DDR Shoppers World | Framingham, MA | 1.9 GWh |
#5209 | Regeneron Pharmaceuticals Inc. | Tarrytown, NY | 2.1 GWh |
#5210 | Old Caroleen Solar Farm | Forest City, NC | 1.9 GWh |
#5211 | Milhurst Solar | Manalapan, NJ | 1.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding C&L.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 57.2 mi |
Chicot Solar | Lake Village, AR | 216.4 GWh | 49.6 mi |
Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh | 42.4 mi |
Dam 2 | Dumas, AR | 400.7 GWh | 30 mi |
FECC Solar Benton | Benton, AR | 967.0 MWh | 57.8 mi |
General Dynamics | Hampton, AR | 3.6 GWh | 52.4 mi |
Harry L. Oswald | Little Rock, AR | 1.1 TWh | 42 mi |
Murray | North Little Rock, AR | 113.5 GWh | 58.2 mi |
NLRED 2MW | North Little Rock, AR | 80.0 MWh | 50.2 mi |
NLRED 5MW | North Little Rock, AR | 2.9 GWh | 50.3 mi |
Pine Bluff Energy Center | Pine Bluff, AR | 1.1 TWh | 10.7 mi |
Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 11 mi |
Prairie Mist Solar | Montrose, AR | 105.9 GWh | 57.4 mi |
SAU Tech | Bearden, AR | 1.9 GWh | 53.7 mi |
SR Camden | Camden, AR | 23.3 GWh | 58.8 mi |
Star City School District | Star City, AR | 2.8 GWh | 8 mi |
Stuttgart Solar | Stuttgart, AR | 156.5 GWh | 33.5 mi |
Two Pine Landfill Gas Recovery | North Little Rock, AR | 27.2 GWh | 55.6 mi |
White Bluff | Redfield, AR | 2.3 TWh | 29.9 mi |
Zeuber | Little Rock, AR | 7.3 GWh | 48.3 mi |