Camas Solar Project
4561 No 6 Road, Ellensburg, WA 98926Plant Summary Information
Camas Solar Project is ranked #6 out of 9 solar farms in Washington in terms of total annual net electricity generation.
Camas Solar Project generated 1.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Camas Solar Project |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Kittitas County, WA |
Initial Operation Date | June 2022 |
Last Update | Dec 2024 |
Annual Generation | 9.7 GWh |
Annual Consumption | 33.6 k MMBtu |
Ranked #6,127 out of 12,299 Power Plants Nationwide | |
Ranked #1,770 out of 6,182 Solar Power Plants Nationwide | |
Ranked #112 out of 131 Washington Power Plants | |
Ranked #6 out of 9 Washington Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
TUUSSO Energy, LLC (2018 to 2020) Greenbacker Renewable Energy Corporation (2021 to 2024) |
Map of Camas Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Camas Solar Project.
Monthly Net Generation for Camas Solar Project
Camas Solar Project Details
Summary Information | |
---|---|
Plant Name | Camas Solar Project (62071) |
Plant Address | 4561 No 6 Road, Ellensburg, WA 98926 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 46.95931, -120.50905 |
Generation Dates on File | Jun 2022 to Dec 2024 |
Initial Operation Date | June 2022 |
Annual Generation | 9.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 17-341; 17-341-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Puget Sound Energy (PSEI) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Puget Sound Energy Inc (15500) WA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator CAMAS Details Operating June 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 6.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Camas Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1760 | 160 Tihonet Rd Hybrid(CSG) | Wareham, MA | 9.8 GWh |
#1761 | Highwater Solar I | Stoney Creek, NC | 9.8 GWh |
#1762 | IND Solar Farm (Phase IIA) | Indianapolis, IN | 9.8 GWh |
#1763 | Windsor Solar | Windsor, NC | 9.8 GWh |
#1764 | Freedom Solar | Nichols, SC | 9.8 GWh |
#1765 | Pickford Solar | Pickford, MI | 9.8 GWh |
#1766 | Achilles Solar | Troy, NC | 9.8 GWh |
#1767 | Railroad Farm 2 | St. Pauls, NC | 9.7 GWh |
#1768 | Elk Solar LLC | Raeford, NC | 9.7 GWh |
#1769 | Oakwood Solar | Mebane, NC | 9.7 GWh |
#1771 | Bizzell Church Solar 1, LLC | Selma, NC | 9.7 GWh |
#1772 | Simons Farm | Ahoskie, NC | 9.7 GWh |
#1773 | CED Avenal | Avenal, CA | 9.7 GWh |
#1774 | Victor Dry Farm Ranch A | Victorville, CA | 9.7 GWh |
#1775 | Broadridge Solar, LLC | Lumberton, NC | 9.7 GWh |
#1776 | Nickelson Solar 2 | Wallace, NC | 9.7 GWh |
#1777 | Wadesboro Farm 3 | Wadesboro, NC | 9.7 GWh |
#1778 | Las Vegas Solar Energy Center | Las Vegas, NM | 9.7 GWh |
#1779 | Howell Solar | Howell, NJ | 9.7 GWh |
#1780 | West Siler | Siler City, NC | 9.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Camas Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Chandler | Benton City, WA | 31.4 GWh | 64.8 mi |
Crystal Mountain | Greenwater, WA | 275.0 MWh | 45.6 mi |
Goose Prairie Solar | Moxee, WA | 50.0 GWh | 32.3 mi |
Packwood | Packwood, WA | 63.0 GWh | 56.1 mi |
PEC Headworks | Moses Lake, WA | 17.8 GWh | 32 mi |
Penstemon Solar Project | Ellensburg, WA | 10.7 GWh | 0 mi |
Priest Rapids | Mattawa, WA | 4.0 TWh | 35.8 mi |
Quincy Chute | Quincy, WA | 30.9 GWh | 59 mi |
Rock Island | Wenatchee, WA | 2.2 TWh | 33.1 mi |
Rocky Reach | Wenatchee, WA | 5.2 TWh | 40.9 mi |
Roza | Yakima, WA | 47.7 GWh | 23.6 mi |
Sagebrush Power Partners | Ellensburg, WA | 277.8 GWh | 14.8 mi |
Swauk Wind LLC | Thorp, WA | 2.4 GWh | 16.9 mi |
Tieton Dam Hydro Electric Project | Rimrock, WA | 19.5 GWh | 35.9 mi |
Twin Falls Hydro | North Bend, WA | 62.9 GWh | 64.7 mi |
Urtica Solar Project | Ellensburg, WA | 10.6 GWh | 13.3 mi |
Vantage Wind Energy LLC | Ellensburg, WA | 273.2 GWh | 15.4 mi |
Wanapum | Beverly, WA | 4.3 TWh | 26.1 mi |
Weeks Falls | North Bend, WA | 13.1 GWh | 62.7 mi |
Wild Horse | Ellensburg, WA | 612.8 GWh | 15.2 mi |