Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Hector Farm | Strata Manager, LLC | Troy, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Feb 2017 | Dec 2024 | Solar |
| Wadesboro Farm 3 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Mar 2016 | Dec 2024 | Solar |
| Wadesboro Farm 2 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | May 2016 | Dec 2024 | Solar |
| Southerland Farm Solar | Strata Manager, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Oct 2016 | Dec 2024 | Solar |
| ZV Solar 3, LLC | SRE Utility Solar 1, LLC | Red Springs, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Feb 2016 | Dec 2024 | Solar |
| Langdon Solar Farm, LLC | Strata Manager, LLC | Four Oaks, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Two Mile Desert Project | Citizens Enterprises Corporation | Hertford, NC | PJM Interconnection, LLC (PJM) | 28.1 GWh | May 2019 | Dec 2024 | Solar |
| River Road Solar, LLC | Duke Energy Renewables Services | Cofield, NC | PJM Interconnection, LLC (PJM) | 6.2 GWh | Jul 2016 | Dec 2024 | Solar |
| Williamston West Farm, LLC | Strata Manager, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 8.7 GWh | Jun 2016 | Dec 2024 | Solar |
| Germantown Solar, LLC | Cypress Creek Renewables | Rural Hall, NC | Duke Energy Carolinas (DUK) | 2.8 GWh | Nov 2015 | Dec 2024 | Solar |
| McGrigor Farm Solar | Carolina Solar Energy LLC | Clinton, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Sep 2019 | Dec 2024 | Solar |
| Sellers Farm Solar | Strata Manager, LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Apr 2022 | Dec 2024 | Solar |
| Eagle Solar | USF Essex Lessor, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | Jul 2020 | Dec 2024 | Solar |
| Yadkinville Solar | Oppidum Renewables USA, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 4.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Albertson Solar LLC | Albertson Solar LLC | Albertson, NC | Duke Energy Progress East (CPLE) | 10.4 GWh | Jun 2015 | Dec 2024 | Solar |
| Mount Olive Solar | AES Distributed Energy | Mount Olive, NC | Duke Energy Progress East (CPLE) | 2.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Freemont Solar Center LLC | Heelstone Energy Holdings, LLC | Stanley, NC | Duke Energy Carolinas (DUK) | 7.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Crestwood Solar Center LLC | SRE Utility Solar 1, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 6.9 GWh | Mar 2016 | Dec 2024 | Solar |
| Pollocksville Solar | Cypress Creek Renewables | Pollocksville, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Lillington Solar | Altus Power America Management, LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Sep 2017 | Dec 2024 | Solar |
| Vance Solar Farm, LLC | Cypress Creek Renewables | Kittrell, NC | Duke Energy Carolinas (DUK) | 8.0 GWh | Dec 2015 | Dec 2024 | Solar |
| Cline Solar Farm, LLC | Cline Solar, LLC | Hildebran, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Aug 2017 | Dec 2024 | Solar |
| BG Stewart Solar Farm, LLC | Cypress Creek Renewables | Marshville, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Oct 2015 | Dec 2024 | Solar |
| Soluga Farms IV | Soluga Solar, LLC | Godwin, NC | Southeastern Power Administration (SEPA) | 6.0 GWh | Aug 2018 | Dec 2024 | Solar |
| Meadowbrook Solar Farm | Cypress Creek Renewables | Rockwell, NC | Duke Energy Carolinas (DUK) | 8.6 GWh | Oct 2016 | Dec 2024 | Solar |
| Coats Solar Farm, LLC | Cypress Creek Renewables | Coats, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Dec 2015 | Dec 2024 | Solar |
| Conetoe II Solar, LLC | Duke Energy Renewables Services | Conetoe, NC | PJM Interconnection, LLC (PJM) | 122.4 GWh | Nov 2015 | Dec 2024 | Solar |
| Five Forks Solar | Five Forks Solar | Macon, NC | PJM Interconnection, LLC (PJM) | 26.8 GWh | Nov 2019 | Dec 2024 | Solar |
| ESA Smithfield | SRE Utility Solar 1, LLC | Smithfield, NC | Duke Energy Progress East (CPLE) | 3.1 GWh | Sep 2015 | Dec 2024 | Solar |
| ESA Selma | SRE Utility Solar 1, LLC | Selma, NC | Duke Energy Progress East (CPLE) | 811.0 MWh | Aug 2015 | Dec 2024 | Solar |
| Camp Lejeune Solar and Energy Storage | Duke Energy Progress - (NC) | Camp Lejeune, NC | Duke Energy Carolinas (DUK) | 20.8 GWh | Nov 2015 | Dec 2024 | Solar |
| Boykin PV1 | Ecoplexus, Inc | Wade, NC | Duke Energy Carolinas (DUK) | 33.6 GWh | Nov 2020 | Dec 2024 | Solar |
| High Shoals PV1 | Pine Gate Renewables | High Shoals, NC | Duke Energy Carolinas (DUK) | 28.9 GWh | Mar 2022 | Dec 2024 | Solar |
| Ouchchy PV1 | Ecoplexus, Inc | Mebane, NC | Duke Energy Carolinas (DUK) | 5.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Turkey Creek PV1 | Fresh Air Energy XXXV, LLC | Kirby, NC | Duke Energy Carolinas (DUK) | 17.6 GWh | Jan 2017 | Dec 2024 | Solar |
| Vaughn Creek PV1 | Ecoplexus, Inc | Murfreesboro, NC | Duke Energy Carolinas (DUK) | 34.1 GWh | Nov 2017 | Dec 2024 | Solar |
| McLean Homestead | SolRiver Capital LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 10.0 GWh | Jul 2023 | Dec 2024 | Solar |
| TWE Chocowinity Solar, LLC | Cypress Creek Renewables | Chocowinity, NC | Duke Energy Carolinas (DUK) | 5.9 GWh | Nov 2015 | Dec 2024 | Solar |
| Innovative Solar 10 | Cypress Creek Renewables | Canton, NC | Duke Energy Carolinas (DUK) | 2.4 GWh | Sep 2015 | Dec 2024 | Solar |
| Innovative Solar 18, LLC | Cypress Creek Renewables | Bostic, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Innovative Solar 26, LLC | Cypress Creek Renewables | Hildebran, NC | Duke Energy Carolinas (DUK) | 3.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Innovative Solar 63, LLC | Cypress Creek Renewables | Snow Hill, NC | Duke Energy Carolinas (DUK) | 8.7 GWh | Jan 2016 | Dec 2024 | Solar |
| Innovative Solar 16 | Cypress Creek Renewables | Hendersonville, NC | Duke Energy Carolinas (DUK) | 3.1 GWh | Sep 2015 | Dec 2024 | Solar |
| Neisler Street Solar | Neisler Street Solar I, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 2.8 GWh | Jul 2015 | Dec 2024 | Solar |
| Shelby Randolph Road Solar 1, LLC | SRE Utility Solar 1, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 3.3 GWh | Aug 2015 | Dec 2024 | Solar |
| Lafayette Solar I, LLC | SRE Utility Solar 1, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 3.3 GWh | Aug 2015 | Dec 2024 | Solar |
| Rockingham Solar, LLC | SRE Utility Solar 1, LLC | Marston, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | Oct 2015 | Dec 2024 | Solar |
| York Road Solar I, LLC | SRE Utility Solar 1, LLC | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Aug 2015 | Dec 2024 | Solar |
| SID Solar I, LLC | SRE Utility Solar 1, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 7.9 GWh | Aug 2015 | Dec 2024 | Solar |
| HCE Johnston I, LLC | HCE Johnston I, LLC | Willow Springs, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Red Toad 1425 A Powatan Road, LLC | SRE Utility Solar 1, LLC | Clayton, NC | Duke Energy Carolinas (DUK) | 4.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Durham Solar | SRE Utility Solar 1, LLC | Durham, NC | Duke Energy Carolinas (DUK) | 5.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Morgan Farm, LLC | SRE Utility Solar 1, LLC | Louisburg, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Nashville Farms, LLC | SRE Utility Solar 1, LLC | Nashville, NC | Duke Energy Carolinas (DUK) | 3.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Cedar Solar, LLC | SRE Utility Solar 1, LLC | Beulaville, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Oct 2015 | Dec 2024 | Solar |
| Elm Solar, LLC | SRE Utility Solar 1, LLC | Sanford, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Baltimore Church Solar, LLC | Altus Power America Management, LLC | Fairmont, NC | Duke Energy Carolinas (DUK) | 5.9 GWh | Sep 2017 | Dec 2024 | Solar |
| Cohen Farm Solar, LLC | Cypress Creek Renewables | Sanford, NC | Duke Energy Carolinas (DUK) | 9.9 GWh | Jul 2016 | Dec 2024 | Solar |
| Floyd Solar, LLC | Cypress Creek Renewables | Fairmont, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Jun 2016 | Dec 2024 | Solar |
| Shelter Solar | Sol Systems | Raeford, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Nov 2018 | Dec 2024 | Solar |
| Heedeh Solar | MN8 Energy LLC | Delco, NC | Duke Energy Carolinas (DUK) | 6.7 GWh | Jun 2018 | Dec 2024 | Solar |
| Tate Solar | USF Essex Lessor, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Jul 2020 | Dec 2024 | Solar |
| Wortham Solar Farm | Cypress Creek Renewables | Henderson, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Aug 2016 | Dec 2024 | Solar |
| Tides Lane Farm | Strata Manager, LLC | Louisburg, NC | Duke Energy Progress East (CPLE) | 4.8 GWh | Sep 2019 | Dec 2024 | Solar |
| Morgan's Corner | Dominion Renewable Energy | Elizabeth City, NC | PJM Interconnection, LLC (PJM) | 27.8 GWh | Nov 2015 | Dec 2024 | Solar |
| Modlin Solar Farm | Cypress Creek Renewables | Williamston, NC | PJM Interconnection, LLC (PJM) | 8.9 GWh | Jul 2016 | Dec 2024 | Solar |
| Maxton Solar, LLC | Cypress Creek Renewables | Maxton, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | Aug 2016 | Dec 2024 | Solar |
| Choco Solar, LLC | Choco Solar LLC | Chocowinity, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2014 | Dec 2024 | Solar |
| South Winston Farm, LLC | Cypress Creek Renewables | Winston-Salem, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Dec 2015 | Dec 2024 | Solar |
| Nash 97 Solar, LLC | Cypress Creek Renewables | Middlesex, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Mar 2016 | Dec 2024 | Solar |
| Currin Solar, LLC | Cypress Creek Renewables | Oxford, NC | Duke Energy Carolinas (DUK) | 6.6 GWh | Nov 2015 | Dec 2024 | Solar |
| CB Bladen Solar, LLC | Cypress Creek Renewables | Fayetteville, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Jun 2016 | Dec 2024 | Solar |
| Bizzell Church Solar 1, LLC | Cypress Creek Renewables | Selma, NC | Duke Energy Carolinas (DUK) | 9.7 GWh | Nov 2015 | Dec 2024 | Solar |
| Exum Farm Solar, LLC | Cypress Creek Renewables | Grifton, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Nov 2016 | Dec 2024 | Solar |
| Lincoln Solar, LLC (NC) | Cypress Creek Renewables | Bostic, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Innovative Solar 65 | Cypress Creek Renewables | Laurinburg, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Oct 2016 | Dec 2024 | Solar |
| Kennedy Solar, LLC | Cypress Creek Renewables | Warsaw, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Mar 2017 | Dec 2024 | Solar |
| St. Pauls Solar 1, LLC | Cypress Creek Renewables | St. Pauls, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Mar 2017 | Dec 2024 | Solar |
| MC1 Solar | MC1 Solar Farm, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 8.8 GWh | Jul 2016 | Dec 2024 | Solar |
| Tamworth Holdings | Big Sky Wind, LLC | Garland, NC | Duke Energy Carolinas (DUK) | 7.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Warbler Holdings | SolRiver Capital LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 7.2 GWh | Sep 2021 | Dec 2024 | Solar |
| Hertford Solar Farm | Duke Energy Renewables Services | Hertford, NC | PJM Interconnection, LLC (PJM) | 8.6 GWh | Dec 2015 | Dec 2024 | Solar |
| Flint Hill Solar, LLC | Cypress Creek Renewables | Carthage, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Aug 2016 | Dec 2024 | Solar |
| Battleboro Farm | Oppidum Renewables USA, LLC | South Whitakers, NC | PJM Interconnection, LLC (PJM) | 8.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Snow Camp Solar, LLC | Cypress Creek Renewables | Snow Camp, NC | Duke Energy Progress East (CPLE) | 11.1 GWh | Feb 2016 | Dec 2024 | Solar |
| White Street Renewables | White Street Renewables LLC | Greensboro, NC | Duke Energy Carolinas (DUK) | 15.6 GWh | May 2019 | Dec 2024 | Landfill Gas : 60.2% Solar : 39.8% |
| White Farm Solar, LLC | Cypress Creek Renewables | Woodland, NC | PJM Interconnection, LLC (PJM) | 9.6 GWh | Jul 2016 | Dec 2024 | Solar |
| HXNAir Solar One | HXNAir Solar One LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 7.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Robin Solar | Robin Solar LLC | Dudley, NC | Duke Energy Carolinas (DUK) | 8.1 GWh | Dec 2020 | Dec 2024 | Solar |
| Cash Solar | Cash Solar, LLC | Nashville, NC | Duke Energy Carolinas (DUK) | 10.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Daystar Solar | Altus Power America Management, LLC | Pollocksville, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Aug 2017 | Dec 2024 | Solar |
| Kathleen Solar | Sol Systems | Fuquay Varina, NC | Duke Energy Carolinas (DUK) | 9.9 GWh | Oct 2018 | Dec 2024 | Solar |
| Grove Solar | Sol Systems | New Bern, NC | Duke Energy Carolinas (DUK) | 12.0 GWh | Nov 2019 | Dec 2024 | Solar |
| Conetoe Solar | Conetoe Solar, LLC | Tarboro, NC | PJM Interconnection, LLC (PJM) | 7.8 GWh | Nov 2015 | Dec 2024 | Solar |
| Sugar Run Solar | Sugar Run Solar, LLC | Sunbury, NC | PJM Interconnection, LLC (PJM) | 9.1 GWh | Nov 2015 | Dec 2024 | Solar |
| TWE New Bern Solar Project, LLC | Cypress Creek Renewables | New Bern, NC | Duke Energy Carolinas (DUK) | 6.3 GWh | Jul 2016 | Dec 2024 | Solar |
| County Home Solar Center, LLC | Heelstone Energy Holdings, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | Aug 2016 | Dec 2024 | Solar |
| Laurinburg Solar, LLC (Heelstone) | SRE Utility Solar 1, LLC | Maxton, NC | Duke Energy Carolinas (DUK) | 4.1 GWh | Nov 2015 | Dec 2024 | Solar |
| Hemlock Solar | Hemlock Solar LLC | Garysburg, NC | PJM Interconnection, LLC (PJM) | 9.3 GWh | Feb 2017 | Dec 2024 | Solar |
| Long Farm 46 Solar, LLC | Duke Energy Renewables Services | Garysburg, NC | PJM Interconnection, LLC (PJM) | 8.2 GWh | Jan 2016 | Dec 2024 | Solar |