Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Ward WTP | City Of High Point | High Point, NC | Duke Energy Carolinas (DUK) | 110.0 MWh | Jan 1999 | Dec 2024 | Distillate Fuel Oil |
| Eastside WWTP | City Of High Point | High Point, NC | Duke Energy Carolinas (DUK) | 276.0 MWh | Jul 2004 | Dec 2024 | Distillate Fuel Oil |
| Monroe Generating Station | North Carolina Mun Power Agny #1 | Monroe, NC | Duke Energy Carolinas (DUK) | 862.0 MWh | Mar 2010 | Dec 2024 | Natural Gas |
| Red Toad 1425 A Powatan Road, LLC | SRE Utility Solar 1, LLC | Clayton, NC | Duke Energy Carolinas (DUK) | 4.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Moore Solar | Moore Solar, LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 8.6 GWh | Jan 2018 | Dec 2024 | Solar |
| Oakwood Solar | Oakwood Solar, LLC | Mebane, NC | Duke Energy Carolinas (DUK) | 9.7 GWh | May 2021 | Dec 2024 | Solar |
| ESA Albemarle NC Solar | ESA Albemarle NC Solar, LLC | Albemarle, NC | Duke Energy Carolinas (DUK) | 4.3 GWh | Mar 2021 | Dec 2024 | Solar |
| Hayes Solar, LLC | Hayes Solar, LLC | Dobson, NC | Duke Energy Carolinas (DUK) | 6.4 GWh | Nov 2020 | Dec 2024 | Solar |
| Moyer Solar | Moyer Solar, LLC | Stoneville, NC | Duke Energy Carolinas (DUK) | 10.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Nash 97 Solar 2 | Nash 97 Solar 2, LLC | Middlesex, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Sep 2018 | Dec 2024 | Solar |
| Spring Hope Solar 2, LLC | Spring Hope Solar 2, LLC | Spring Hope, NC | Duke Energy Carolinas (DUK) | 8.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Gray Fox Solar LLC | SolRiver Capital LLC | Shannon, NC | Duke Energy Carolinas (DUK) | 11.2 GWh | Feb 2024 | Dec 2024 | Solar |
| Lotus | Cypress Creek Renewables | Elon, NC | Duke Energy Carolinas (DUK) | 6.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Big Boy | Cypress Creek Renewables | Gibsonville, NC | Duke Energy Carolinas (DUK) | 4.4 GWh | Nov 2014 | Dec 2024 | Solar |
| Beth | Cypress Creek Renewables | Julian, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Nov 2014 | Dec 2024 | Solar |
| Charlie | Cypress Creek Renewables | Julian, NC | Duke Energy Carolinas (DUK) | 6.3 GWh | Nov 2014 | Dec 2024 | Solar |
| Davidson V | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 2.4 GWh | Nov 2010 | Dec 2024 | Solar |
| Overhill Solar | Strata Manager, LLC | Clinton, NC | Duke Energy Carolinas (DUK) | 10.9 GWh | Feb 2022 | Dec 2024 | Solar |
| 1051 Lucky Solar, LLC | 1051 Lucky Solar, LLC | Hamptonville, NC | Duke Energy Carolinas (DUK) | 3.9 GWh | Apr 2021 | Dec 2024 | Solar |
| Edison Farm | Strata Manager, LLC | Eden, NC | Duke Energy Carolinas (DUK) | 4.5 GWh | Oct 2022 | Dec 2024 | Solar |
| Elk Solar LLC | SolRiver Capital LLC | Raeford, NC | Duke Energy Carolinas (DUK) | 9.7 GWh | Jun 2024 | Dec 2024 | Solar |
| Misenheimer Solar LLC | Misenheimer Solar LLC | Gold Hill, NC | Duke Energy Carolinas (DUK) | 161.0 GWh | Mar 2024 | Sep 2025 | Solar |
| Zuma Solar, LLC | Sol Systems | Providence, NC | Duke Energy Carolinas (DUK) | 6.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Cathcart Solar, LLC | Cathcart Solar, LLC | Whiteville, NC | Duke Energy Carolinas (DUK) | 10.2 GWh | Apr 2023 | Dec 2024 | Solar |
| 233 Randolph 74 Solar I, LLC | 233 Randolph 74 Solar I, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | May 2022 | Dec 2024 | Solar |
| Clear Solar I, LLC | Clear Solar I, LLC | Forest City, NC | Duke Energy Carolinas (DUK) | 6.0 GWh | Aug 2020 | Dec 2024 | Solar |
| Stanly Solar, LLC | Stanly Solar, LLC | Albemarle, NC | Duke Energy Carolinas (DUK) | 91.6 GWh | Jul 2022 | Sep 2025 | Solar |
| Brighter Future Solar | Brighter Future Solar LLC | Granite Falls, NC | Duke Energy Carolinas (DUK) | 16.8 GWh | Dec 2021 | Dec 2024 | Solar |
| Partin Solar | Partin Solar, LLC | Elkin, NC | Duke Energy Carolinas (DUK) | 83.2 GWh | Sep 2023 | Sep 2025 | Solar |
| Davidson IV | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 5.1 GWh | Nov 2010 | Dec 2024 | Solar |
| Davidson III | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 7.3 GWh | Nov 2010 | Dec 2024 | Solar |
| Harding Solar, LLC | SolRiver Capital LLC | Hookerton, NC | Duke Energy Carolinas (DUK) | 6.9 GWh | Feb 2024 | Dec 2024 | Solar |
| 1001 Ebenezer Church Solar | 1001 Ebenezer Church Solar, LLC | StateRoad, NC | Duke Energy Carolinas (DUK) | 6.4 GWh | Mar 2021 | Dec 2024 | Solar |
| 1009 Yadkin Solar | 1009 Yadkin Solar, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 5.9 GWh | Mar 2021 | Dec 2024 | Solar |
| 1073 Onslow Solar | 1073 Onslow Solar, LLC | Hubert, NC | Duke Energy Carolinas (DUK) | 5.7 GWh | Apr 2021 | Dec 2024 | Solar |
| 1008 Matthews Solar | 1008 Matthews Solar, LLC | East Bend, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Apr 2021 | Dec 2024 | Solar |
| 1045 Tomlin Mill Solar | 1045 Tomlin Mill Solar, LLC | Statesville, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Apr 2021 | Dec 2024 | Solar |
| Lang Solar Farm | Lang Solar Farm, LLC | La Grange, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Sep 2016 | Dec 2024 | Solar |
| Henry Gibson Solar | Henry Gibson Solar, LLC | Gibson, NC | Duke Energy Carolinas (DUK) | 1.2 GWh | Oct 2024 | Dec 2024 | Solar |
| Southwick Solar | Southwick Solar, LLC | Graham, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Ventura Solar, LLC | Sol Systems | Taylorsville, NC | Duke Energy Carolinas (DUK) | 9.9 GWh | Oct 2020 | Dec 2024 | Solar |
| Saw Solar | Saw Solar, LLC | China Grove, NC | Duke Energy Carolinas (DUK) | 10.6 GWh | May 2022 | Dec 2024 | Solar |
| Sawtell Solar | Sawtell Solar, LLC | Hendersonville, NC | Duke Energy Carolinas (DUK) | 6.0 GWh | Mar 2021 | Sep 2024 | Solar |
| Sugar Solar, LLC | Sugar Solar, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 106.2 GWh | Nov 2021 | Sep 2025 | Solar |
| Pilot Mountain Solar, LLC | USF Essex Lessor, LLC | King, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Aug 2020 | Dec 2024 | Solar |
| Lick Creek Solar, LLC | Lick Creek Solar, LLC | Walnut Cove, NC | Duke Energy Carolinas (DUK) | 108.6 GWh | Feb 2022 | Sep 2025 | Solar |
| Seagrove | Strata Manager, LLC | Seagrove, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2019 | Dec 2024 | Solar |
| Cubera Solar, LLC | Cubera Solar, LLC | Dunn, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Dec 2019 | Dec 2024 | Solar |
| Peake Road | Strata Manager, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | May 2019 | Dec 2024 | Solar |
| Kendall Farm | Strata Manager, LLC | Liberty, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | May 2019 | Dec 2024 | Solar |
| Kalish Farm Solar | Strata Manager, LLC | Candor, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | May 2018 | Dec 2024 | Solar |
| Henry Farm | Strata Manager, LLC | Liberty, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2017 | Dec 2024 | Solar |
| Sneads Grove | Strata Manager, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 10.2 GWh | Jan 2018 | Dec 2024 | Solar |
| Tinker (NC) | Strata Manager, LLC | Moncure, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Oct 2018 | Dec 2024 | Solar |
| Trent River Farm | Strata Manager, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Jul 2018 | Dec 2024 | Solar |
| Truman (NC) | Strata Manager, LLC | Wendell, NC | Duke Energy Progress East (CPLE) | 10.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Wedge | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.9 GWh | Mar 2021 | Dec 2024 | Solar |
| Gladstone Farm | Strata Manager, LLC | West End, NC | Duke Energy Progress East (CPLE) | 10.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Gilead | Strata Manager, LLC | Gilead, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Belafonte | Strata Manager, LLC | Calypso, NC | Duke Energy Progress East (CPLE) | 6.2 GWh | Nov 2018 | Dec 2024 | Solar |
| Beaker | Strata Manager, LLC | Farmville, NC | Duke Energy Progress East (CPLE) | 10.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Thunderhead | Thunderhead Solar, LLC | Asheboro, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Nov 2021 | Dec 2024 | Solar |
| Ridgeback | Ridgeback Solar, LLC | Liberty, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Nov 2021 | Dec 2024 | Solar |
| Cabin Creek Solar, LLC | Cabin Creek Solar, LLC | Biscoe, NC | Duke Energy Progress East (CPLE) | 165.3 GWh | Dec 2022 | Sep 2025 | Solar |
| Phobos Solar, LLC | Phobos Solar, LLC | Middlesex, NC | Duke Energy Progress East (CPLE) | 173.9 GWh | Dec 2022 | Sep 2025 | Solar |
| Arthur 2 Solar | Arthur Solar 2, LLC | Tabor City, NC | Duke Energy Progress East (CPLE) | 7.6 GWh | Feb 2023 | Sep 2024 | Solar |
| Summit Solar | Strata Manager, LLC | Mount Olive, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Jul 2022 | Dec 2024 | Solar |
| Shieldwall Solar | Strata Manager, LLC | Littleton, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Oct 2022 | Dec 2024 | Solar |
| Whiskey Solar | Whiskey Solar, LLC | Cumberland, NC | Duke Energy Progress East (CPLE) | 11.5 GWh | May 2021 | Dec 2024 | Solar |
| Mule Farm Solar, LLC | Mule Farm Solar, LLC | Benson, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | Apr 2022 | Dec 2024 | Solar |
| Ramp Solar, LLC | Ramp Solar, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Apr 2022 | Dec 2024 | Solar |
| Selwyn Farm | Strata Manager, LLC | Lilesville, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Feb 2022 | Dec 2024 | Solar |
| Hubble Solar, LLC | Hubble Solar, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Mar 2023 | Dec 2024 | Solar |
| Polk Farm | Strata Manager, LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 11.3 GWh | Feb 2022 | Dec 2024 | Solar |
| Beckwith Solar | Beckwith Solar, LLC | Tabor City, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Nov 2022 | Dec 2024 | Solar |
| Smith Solar Farm | Strata Manager, LLC | Gibson, NC | Duke Energy Progress East (CPLE) | 10.6 GWh | Jun 2019 | Dec 2024 | Solar |
| Banner Solar | Banner Solar, LLC | Benson, NC | Duke Energy Progress East (CPLE) | 10.2 GWh | Nov 2021 | Dec 2024 | Solar |
| Virginia Line Solar, LLC | Virginia Line Solar, LLC | Manson, NC | Duke Energy Progress East (CPLE) | 80.7 GWh | Nov 2023 | Sep 2025 | Solar |
| Brick City Solar | Brick City Solar, LLC | Wallace, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Clovelly Solar | Clovelly Solar, LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Mar 2021 | Dec 2024 | Solar |
| Coogee Solar | Coogee Solar, LLC | Grantsboro, NC | Duke Energy Progress East (CPLE) | 11.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Overman Solar | Overman Solar, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Millers Chapel Solar | Millers Chapel Solar, LLC | La Grange, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Nov 2021 | Dec 2024 | Solar |
| Cruise Solar, LLC | Cruise Solar, LLC | Jacksonville, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Aug 2021 | Dec 2024 | Solar |
| Richlands Solar, LLC | Richlands Solar, LLC | Richlands, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Aug 2021 | Dec 2024 | Solar |
| Lane II Solar, LLC | USF Essex Lessor, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.8 GWh | Jun 2020 | Dec 2024 | Solar |
| Sweet Tea Solar, LLC | Sweet Tea Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Mar 2021 | Dec 2024 | Solar |
| Acme Solar, LLC | Acme Solar, LLC | Riegelwood, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Mar 2021 | Dec 2024 | Solar |
| Solar Lee, LLC | Solar Lee, LLC | Mount Olive, NC | Duke Energy Progress East (CPLE) | 6.1 GWh | Mar 2021 | Dec 2024 | Solar |
| Siler City Solar 2 | Siler City Solar 2, LLC | Siler City, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Sep 2018 | Dec 2024 | Solar |
| Nickelson Solar 2 | Nickelson Solar 2, LLC | Wallace, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Aug 2018 | Dec 2024 | Solar |
| Meadowlark Solar | Meadowlark Solar, LLC | Dunn, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Aug 2018 | Dec 2024 | Solar |
| Fort Bragg - Camp Mackall PV BESS System | Ameresco Federal Solutions | Hoffman, NC | Duke Energy Progress East (CPLE) | 1.5 GWh | Jan 2023 | Dec 2024 | Solar |
| Powatan Road Solar | Red Toad Powatan Phase 2 LLC | Clayton, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Nov 2020 | Dec 2024 | Solar |
| Buttercup Solar, LLC | Sol Systems | Rose Hill, NC | Duke Energy Progress East (CPLE) | 10.5 GWh | Oct 2020 | Dec 2024 | Solar |
| 315 Vinson Road | Red Toad 315 Vinson Road, LLC | Clayton, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Bay Tree | Cypress Creek Renewables | Harrells, NC | Duke Energy Progress East (CPLE) | 148.5 GWh | Oct 2021 | Sep 2025 | Solar |
| Harrison Solar, LLC | Harrison Solar, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Trent River Solar, LLC | Trent River Solar, LLC | Pollocksville, NC | Duke Energy Progress East (CPLE) | 138.2 GWh | Jun 2021 | Sep 2025 | Solar |
| Bo Biggs Solar | Bo Biggs Solar, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Nov 2018 | Dec 2024 | Solar |