Strider Solar, LLC
1925 Archie Newsom Road, Asheboro, NC 27205Plant Summary Information
Strider Solar, LLC is ranked #404 out of 739 solar farms in North Carolina in terms of total annual net electricity generation.
Strider Solar, LLC generated 2.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Strider Solar, LLC |
---|---|
Utility Name | Alchemy Renewable Energy |
Location | Randolph County, NC |
Initial Operation Date | April 2018 |
Last Update | Dec 2022 |
Annual Generation | 9.1 GWh |
Annual Consumption | 33.6 k MMBtu |
Ranked #6,287 out of 11,455 Power Plants Nationwide | |
Ranked #1,757 out of 5,173 Solar Power Plants Nationwide | |
Ranked #484 out of 860 North Carolina Power Plants | |
Ranked #404 out of 739 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Strider Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Strider Solar, LLC.
Monthly Net Generation for Strider Solar, LLC
Strider Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Strider Solar, LLC (63270) |
Plant Address | 1925 Archie Newsom Road Asheboro, NC 27205 |
Utility | Alchemy Renewable Energy (62627) |
Latitude, Longitude | 35.6, -79.79 |
Generation Dates on File | Jan 2019 to Dec 2022 |
Initial Operation Date | April 2018 |
Annual Generation | 9.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 16-167-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Randolph Electric Member Corp (15671) NC |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Generator NCSTR Details Operating April 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Strider Solar, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1747 | Big Lake Project CSG | Big Lake, MN | 9.1 GWh |
#1748 | Kilvert | Warwick, RI | 9.1 GWh |
#1749 | Thornton PV1 | Snow Hill, NC | 9.1 GWh |
#1750 | Broadway Solar Center, LLC | Chadbourn, NC | 9.1 GWh |
#1751 | New Bern Farm | Ernul, NC | 9.1 GWh |
#1752 | Pickford Solar | Pickford, MI | 9.1 GWh |
#1753 | West Salisbury Farm LLC | Salisbury, NC | 9.1 GWh |
#1754 | Sartell Holdco CSG | Sartell, MN | 9.1 GWh |
#1755 | Cassville Solar | Town of Cassville, WI | 9.1 GWh |
#1756 | BRE | Oxford, NC | 9.1 GWh |
#1758 | FLS Solar 230 (Warren) | Albertson, NC | 9.1 GWh |
#1759 | Jakana Solar | Williamston, NC | 9.1 GWh |
#1760 | River Road Solar, LLC | Cofield, NC | 9.1 GWh |
#1761 | Watts Farm | Maxton, NC | 9.1 GWh |
#1762 | Balsam | Sanford, NC | 9.1 GWh |
#1763 | Lincoln Solar, LLC (NC) | Bostic, NC | 9.0 GWh |
#1764 | Roxboro Farm | Roxboro, NC | 9.0 GWh |
#1765 | Walcott Solar CSG | Faribault, MN | 9.0 GWh |
#1766 | Lemond Solar | Owatonna, MN | 9.0 GWh |
#1767 | Conetoe Solar | Tarboro, NC | 9.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Strider Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABD Farms | Asheboro, NC | 9.9 GWh | 9.2 mi |
Achilles Solar | Troy, NC | 10.7 GWh | 18 mi |
Biscoe Solar LLC | Biscoe, NC | 9.9 GWh | 15 mi |
Cabin Creek Solar, LLC | Biscoe, NC | 159.8 GWh | 18.4 mi |
Changeup | Asheboro, NC | 1.6 GWh | 10.3 mi |
Hector Farm | Troy, NC | 10.0 GWh | 16.9 mi |
Hopewell Friends | Asheboro, NC | 2.2 GWh | 5 mi |
Little River PV 1 | Randolph, NC | 9.5 GWh | 4.3 mi |
Lowe Solar Energy Storage | Asheboro, NC | 3.8 GWh | 10.6 mi |
Millikan Farm | Randleman, NC | 9.9 GWh | 15.1 mi |
Montgomery Solar LLC | Biscoe, NC | 41.4 GWh | 17.7 mi |
Morning View | Seagrove, NC | 4.4 GWh | 4.6 mi |
Mustang Solar | Robbins, NC | 10.5 GWh | 17.5 mi |
Old Cedar Solar Energy Storage | Asheboro, NC | 2.1 GWh | 7.8 mi |
Panda Solar NC 8, LLC | Star, NC | 4.1 GWh | 13.2 mi |
Seagrove | Seagrove, NC | 8.8 GWh | 4.7 mi |
Spencer Meadow Solar Energy Storage | Asheboro, NC | 3.8 GWh | 10.6 mi |
Tanager Holdings | Asheboro, NC | 8.7 GWh | 10.6 mi |
Thunderhead | Asheboro, NC | 3.3 GWh | 10.4 mi |
West Siler | Siler City, NC | 10.2 GWh | 18.1 mi |