Lowe Solar Energy Storage
3084 Lowe Country Rd, Asheboro, NC 27205Plant Summary Information
Lowe Solar Energy Storage is ranked #629 out of 755 solar farms in North Carolina in terms of total annual net electricity generation.
Lowe Solar Energy Storage generated 809.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Lowe Solar Energy Storage |
---|---|
Utility Name | North Carolina El Member Corp |
Location | Randolph County, NC |
Initial Operation Date | January 2022 |
Last Update | Dec 2024 |
Annual Generation | 3.7 GWh |
Annual Consumption | 13.8 k MMBtu |
Ranked #8,710 out of 12,288 Power Plants Nationwide | |
Ranked #3,604 out of 6,174 Solar Power Plants Nationwide | |
Ranked #730 out of 868 North Carolina Power Plants | |
Ranked #629 out of 755 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Lowe Solar Energy Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lowe Solar Energy Storage.
Monthly Net Generation for Lowe Solar Energy Storage
Lowe Solar Energy Storage Details
Summary Information | |
---|---|
Plant Name | Lowe Solar Energy Storage (64516) |
Plant Address | 3084 Lowe Country Rd, Asheboro, NC 27205 |
Utility | North Carolina El Member Corp (13683) |
Latitude, Longitude | 35.71843, -79.90948 |
Generation Dates on File | Jan 2022 to Dec 2024 |
Initial Operation Date | January 2022 |
Annual Generation | 3.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Randolph Electric Member Corp (15671) NC |
Grid Voltage | 12.47 kV |
Energy Storage | Yes |
Generator BAT1 Details Operating January 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 5 |
---|---|
Maximum Charge Rate | 2 MW |
Maximum Discharge Rate | 2 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 2.5 |
Storage Enclosure Type | CS |
System Peak Shaving | P |
Load Management | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 64516 |
Direct Support Gen Id | SOL1 |
Support T D Asset | No |
Generator SOL1 Details Operating January 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lowe Solar Energy Storage Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3594 | KDC Solar TC Little Patuxent WWTP LLC | West Friendship, MD | 3.8 GWh |
#3595 | PCSP3 Airport | Timberlake, NC | 3.8 GWh |
#3596 | Gilbert Solar Facility I, LLC | Gilbert, AZ | 3.8 GWh |
#3597 | Banner Solar Ironwood | Queen Creek, AZ | 3.8 GWh |
#3598 | Mendon | Mendon, MA | 3.8 GWh |
#3599 | Citizen B | Mendota, CA | 3.8 GWh |
#3600 | Oak Leaf Solar XXX LLC (CSG) | Alamosa, CO | 3.8 GWh |
#3601 | Perkins Solar, LLC | Roxboro, NC | 3.8 GWh |
#3602 | Lux Solar, LLC | Kings Mountain, NC | 3.8 GWh |
#3603 | SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh |
#3605 | Venture 1 - 1A CSG | Aurora, CO | 3.8 GWh |
#3606 | Spencer Meadow Solar Energy Storage | Asheboro, NC | 3.7 GWh |
#3607 | Workman Road Solar Farm, LLC | Lake City, MI | 3.8 GWh |
#3608 | Small Mouth Bass Solar | Rockbridge Baths, VA | 3.8 GWh |
#3609 | 315 Vinson Road | Clayton, NC | 3.8 GWh |
#3610 | Kankakee Solar 4 LLC | Kankakee, IL | 3.8 GWh |
#3611 | Pittman Solar One LLC | Hancock, MD | 3.8 GWh |
#3612 | Crawfordsville Solar Park 4 | Crawfordsville, IN | 3.8 GWh |
#3613 | Illinois PV Fulton 1 CSG | Farmington, IL | 3.8 GWh |
#3614 | Ramp Solar, LLC | Goldsboro, NC | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lowe Solar Energy Storage.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABD Farms | Asheboro, NC | 6.3 GWh | 9.1 mi |
Changeup | Asheboro, NC | 3.9 GWh | 7.3 mi |
Davidson Gas Producers LLC | Lexington, NC | 11.5 GWh | 17.5 mi |
Eastside WWTP | High Point, NC | 276.0 MWh | 15.5 mi |
High Point, POLO | High Point, NC | 60.0 MWh | 17.6 mi |
High Point, Pump Station Rd | High Point, NC | 32.0 MWh | 18.6 mi |
High Rock Hydro | Denton, NC | 141.0 GWh | 19.9 mi |
Hopewell Friends | Asheboro, NC | 1.7 GWh | 6.6 mi |
Little River PV 1 | Randolph, NC | 8.3 GWh | 13.7 mi |
Millikan Farm | Randleman, NC | 9.3 GWh | 10.4 mi |
Morning View | Seagrove, NC | 4.1 GWh | 15.1 mi |
Old Cedar Solar Energy Storage | Asheboro, NC | 1.8 GWh | 6.8 mi |
Seagrove | Seagrove, NC | 8.9 GWh | 14.6 mi |
Spencer Meadow Solar Energy Storage | Asheboro, NC | 3.7 GWh | 0 mi |
Strider Solar, LLC | Asheboro, NC | 8.4 GWh | 10.6 mi |
Tanager Holdings | Asheboro, NC | 5.8 GWh | 7.4 mi |
Thunderhead | Asheboro, NC | 3.2 GWh | 7.1 mi |
Trinity Solar | Trinity, NC | 7.4 GWh | 10.5 mi |
Ward WTP | High Point, NC | 110.0 MWh | 17.6 mi |
Westside WWTP | Thomasville, NC | 103.0 MWh | 19 mi |