Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| IRE Solar I, LLC | Scotch Settlement | Gouverneur, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Nov 2017 | Dec 2025 | Solar |
| CJ Solar I, LLC | Lisbon West | Lisbon, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jul 2018 | Dec 2025 | Solar |
| COU Solar I, LLC | Lisbon East | Lisbon, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Jul 2018 | Dec 2025 | Solar |
| Time Warner Cable Enterprises - Martino | AES Distributed Energy | Rome, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Jun 2018 | Dec 2025 | Solar |
| Madison County | Onsite Partners, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Jul 2017 | Dec 2024 | Solar |
| Seneca Nation Cattaraugus Wind Turbine | Seneca Nation | Irving, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Feb 2017 | Dec 2025 | Wind |
| Gore Mountain Solar II | Gore Mountain Solar II, LLC | Whitehall, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Aug 2016 | Dec 2025 | Solar |
| HGS Solar I | HGS solar I, LLC | Whitehall, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Aug 2016 | Dec 2025 | Solar |
| City of Rochester Solar | AES Distributed Energy | Rochester, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2017 | Dec 2025 | Solar |
| Broadalbin | Onyx Asset Services Group | Broadalbin, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Mar 2018 | Dec 2025 | Solar |
| Duanesburg | Onyx Asset Services Group | Duanesburg, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Mar 2018 | Dec 2025 | Solar |
| Johnstown | Onyx Asset Services Group | Johnstown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Mar 2018 | Dec 2025 | Solar |
| Solean Solar Project | Altus Power America Management, LLC | Olean, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Mar 2016 | Dec 2025 | Solar |
| NYU LANGONE HEALTH | NYU LANGONE HEALTH | New York, NY | New York Independent System Operator (NYIS) | 46.5 GWh | Sep 1992 | Dec 2025 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Cedar Creek PV | AES Distributed Energy | Seaford, NY | New York Independent System Operator (NYIS) | 3.0 GWh | May 2017 | Dec 2025 | Solar |
| Letchworth Solar Project | Onsite Partners, LLC | Gainesville, NY | New York Independent System Operator (NYIS) | 1.6 GWh | May 2017 | Dec 2025 | Solar |
| NYC-HH - CONEY ISLAND HOSPITAL | NYC-HH Coney Island Hospital | Brooklyn, NY | New York Independent System Operator (NYIS) | 257.0 MWh | Jun 1993 | Dec 2025 | Distillate Fuel Oil |
| NY Times Daily Production Facility | The NY Times Production Facility | Flushing, NY | New York Independent System Operator (NYIS) | 237.0 MWh | Aug 2005 | Dec 2025 | Distillate Fuel Oil |
| The Mount Sinai Hospital | Mount Sinai Hospital | New York, NY | New York Independent System Operator (NYIS) | 184.0 MWh | May 1970 | Dec 2024 | Distillate Fuel Oil |
| Lichtenthal | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Jun 2018 | Dec 2025 | Solar |
| Call Farms 1 | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jun 2018 | Dec 2025 | Solar |
| Call Farms 3 | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jun 2018 | Dec 2025 | Solar |
| SL Babylon | SL Babylon, LLC | West Babylon, NY | New York Independent System Operator (NYIS) | 14.1 GWh | Nov 2017 | Dec 2025 | Solar |
| Kearsarge Johnstown 2 CSG | Kearsarge Johnstown 2 LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2018 | Dec 2025 | Solar |
| Monroe County Sites A & B | AES Distributed Energy | Webster, NY | New York Independent System Operator (NYIS) | 4.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Monroe County Sites C, D, & E | AES Distributed Energy | Hilton, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2017 | Dec 2025 | Solar |
| Good Samaritan Hospital | Good Samaritan Hospital | Suffern, NY | New York Independent System Operator (NYIS) | 23.0 MWh | Dec 1979 | Dec 2025 | Distillate Fuel Oil : 93.2% Natural Gas : 6.8% |
| Woodhull Hospital | Woodhull Hospital | Brooklyn, NY | New York Independent System Operator (NYIS) | 159.0 MWh | Dec 1971 | Dec 2025 | Distillate Fuel Oil |
| The Allen Hospital | The Allen Hospital | New York, NY | New York Independent System Operator (NYIS) | 10.0 MWh | Dec 2008 | Dec 2025 | Distillate Fuel Oil |
| Mount Sinai Beth Israel | Mount Sinai Beth Israel | New York, NY | New York Independent System Operator (NYIS) | 62.0 MWh | Dec 1987 | Dec 2024 | Distillate Fuel Oil |
| Anheuser-Busch Baldwinsville | AES Distributed Energy | Baldwinsville, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jun 2018 | Dec 2025 | Solar |
| Columbia University - Johnson Farms | AES Distributed Energy | Chester, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2018 | Dec 2025 | Solar |
| 6140 Route 209 - North | 6140 Route 209 - North, LLC | Kerhonkson, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Sep 2019 | Dec 2025 | Solar |
| Medusa NY 1 | Medusa NY 1, LLC | Medusa, NY | New York Independent System Operator (NYIS) | 2.0 GWh | May 2020 | Dec 2025 | Solar |
| Walden NY 1 | Walden NY 1, LLC | Walden, NY | New York Independent System Operator (NYIS) | 2.9 GWh | May 2020 | Dec 2025 | Solar |
| Westtown NY 2 | Westtown NY 2, LLC | Westtown, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2020 | Dec 2025 | Solar |
| Middletown NY 1 | Middletown NY 1, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Feb 2020 | Dec 2025 | Solar |
| Westerlo NY 1 | Westerlo NY 1, LLC | South Westerlo, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Dec 2019 | Dec 2025 | Solar |
| Brick Church Solar | Brick Church Solar 1, LLC | Brunswick, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Aug 2019 | Dec 2025 | Solar |
| Kenmare - Sullivan Community College | MN8 Energy LLC | Sheldrake, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jun 2015 | Dec 2025 | Solar |
| Wappinger 9D Solar | Wappinger 9D Solar, LLC | Wappinger, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jun 2019 | Dec 2025 | Solar |
| Off Airport Road - West | Off Airport Road - West, LLC | Accord, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2019 | Dec 2025 | Solar |
| NY - CSG - Ellsworth II | Nautilus Solar Solutions | Halfmoon, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Aug 2019 | Dec 2025 | Solar |
| Hecate Energy Albany County 1 | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 27.5 GWh | Jan 2024 | Dec 2025 | Solar |
| Blanchard Road 1 Community Solar | OYA Blanchard Road LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2019 | Dec 2025 | Solar |
| Blanchard Road 2 Community Solar | OYA Blanchard Road 2 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 2019 | Dec 2025 | Solar |
| NYS Rte 12 Community Solar | OYA NYS Rte 12 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Moore Road Community Solar | OYA 2643 Moore Road LLC | Ransomville, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Great Lakes Seaway Community Solar | OYA Great Lakes Seaway LLC | Clayton, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Nov 2019 | Dec 2025 | Solar |
| GE 19th Hole | Madison Energy Investments LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 11.0 GWh | Dec 2017 | Sep 2025 | Solar |
| Podunque Road CSG | KSI II Consolidated, LLC | Rushford, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Mar 2021 | Dec 2025 | Solar |
| County Road 16 | KSI II Consolidated, LLC | Watkins Glen, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Mount Hope West | Mount Hope Solar 2 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Mar 2020 | Dec 2025 | Solar |
| Fordham University | Fordham University | Bronx, NY | New York Independent System Operator (NYIS) | 6.0 MWh | Dec 1998 | Dec 2025 | Distillate Fuel Oil |
| SDM000 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 14.2 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| NHH003 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| NHH004 Winthrop Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| SWM Fuel Cell | Yaphank Fuel Cell Park, LLC | Yaphank, NY | New York Independent System Operator (NYIS) | 55.6 GWh | Nov 2021 | Dec 2024 | Natural Gas |
| St. Mary's Hospital For Children | St. Mary's Hospital For Children | Bayside, NY | New York Independent System Operator (NYIS) | 38.0 MWh | Dec 2010 | Dec 2025 | Distillate Fuel Oil |
| MSAP 13 | MSAP 13, LLC | Troy, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Nov 2020 | Dec 2025 | Solar |
| CES Marbletown Solar | RWE Clean Energy | Marbletown, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Feb 2021 | Dec 2025 | Solar |
| Fogarty CSG | Fogarty Solar LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Feb 2021 | Dec 2025 | Solar |
| Townsend Road(CSG) | KSI II Consolidated, LLC | Dix, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Oct 2021 | Dec 2025 | Solar |
| Mount Hope East | Mount Hope Solar 1 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Sep 2019 | Oct 2025 | Solar |
| Bluestone | Bluestone Solar LLC | Kingston, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Feb 2019 | Dec 2025 | Solar |
| Underhill | Underhill Solar LLC | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Feb 2019 | Dec 2025 | Solar |
| Grabinski | Grabinski Solar LLC | Walden, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jun 2019 | Dec 2025 | Solar |
| Adirondack Solar | SunStrong Management, LLC | Ellenburg Center, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Aug 2018 | Dec 2024 | Solar |
| Mount Kisco Landfill Solar & Storage CSG | BQ Energy LLC | Mount Kisco, NY | New York Independent System Operator (NYIS) | 756.0 MWh | Nov 2020 | Dec 2024 | Solar |
| NY- CSG- Johnstown 2 | NY- CSG- Johnstown 2 | New York, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Feb 2020 | Dec 2025 | Solar |
| NY- CSG- Livingston 4 | NY- CSG- Livingston 4 | Caledonia, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Jan 2020 | Dec 2025 | Solar |
| Clifton Park Solar 1, LLC | Nautilus Solar Solutions | Rexford, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Tioga Solar South(CSG) | 237 State Route 96 Site 2, LLC | Owego, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Oct 2021 | Dec 2025 | Solar |
| Tioga Solar North(CSG) | 237 State Route 96 Site 1, LLC | Owego, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Oct 2021 | Dec 2025 | Solar |
| Washingtonville(CSG) | Washingtonville Solar LLC | Washingtonville, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Oct 2021 | Dec 2025 | Solar |
| Minisink CSG | Minisink Solar LLC | Westtown, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Jun 2021 | Dec 2025 | Solar |
| Slate Hill(CSG) | Slate Hill Solar LLC | Johnson, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Oct 2021 | Dec 2025 | Solar |
| Bellisario Solar 1 | Lapeer-Cortland Solar, LLC | Lapeer, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Feb 2021 | Dec 2025 | Solar |
| Bellisario Solar 2 | Lapeer-Cortland Solar, LLC | Lapeer, NY | New York Independent System Operator (NYIS) | 8.5 GWh | Sep 2021 | Dec 2025 | Solar |
| Bellisario Solar 3 | Lapeer-Cortland Solar, LLC | Lapeer, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Sep 2021 | Dec 2025 | Solar |
| Hamlin Solar 1, LLC | Nautilus Solar Solutions | Hamlin, NY | New York Independent System Operator (NYIS) | 9.3 GWh | Nov 2020 | Dec 2025 | Solar |
| River Valley LLC (NY) (CSG) | Nautilus Solar Solutions | Olean, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2021 | Dec 2025 | Solar |
| Clifton Park Solar 2, LLC | Nautilus Solar Solutions | Rexford, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Goldman Sachs Carports Solar | Madison Energy Investments LLC | Cohoes, NY | New York Independent System Operator (NYIS) | 1.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Fuel Cell 3245 Yates Avenue | Bronx Community Clean Energy Project LLC | Bronx, NY | New York Independent System Operator (NYIS) | 38.8 GWh | Jul 2022 | Dec 2025 | Natural Gas |
| Fuel Cell 18A Sneden Avenue | Annadale Community Clean Energy Projects LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 28.0 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| Fuel Cell 18B Sneden Avenue | Annadale Community Clean Energy Projects LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 32.3 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| Freehold(CSG) | Freehold Solar, LLC | Freehold, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Oct 2021 | Dec 2025 | Solar |
| Slayton Settlement Road Solar CSG | RPNY Solar 3, LLC | Lockport, NY | New York Independent System Operator (NYIS) | 11.3 GWh | Jan 2024 | Dec 2025 | Solar |
| Capital Hill Solar LLC | Altus Power America Management, LLC | Albany, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Dec 2021 | Dec 2025 | Solar |
| Rock Island Road Solar Community Solar | RPNY Solar 1, LLC | Gouvernour, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Jun 2022 | Dec 2025 | Solar |
| Mt Pleasant Community Center | RWE Clean Energy | Valhalla, NY | New York Independent System Operator (NYIS) | 680.0 MWh | Oct 2022 | Dec 2025 | Solar |
| Bloom-Altice Fuel Cell | Onsite Partners, LLC | Bethpage,, NY | New York Independent System Operator (NYIS) | 15.6 GWh | Sep 2020 | Dec 2024 | Natural Gas |
| Corning Riverview (CSG) | CleanCapital Holdings | Tonawanda, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Nov 2020 | Dec 2025 | Solar |
| Orbit Bloom Fuel Cell | DG Fuel Cell, LLC | Medford, NY | New York Independent System Operator (NYIS) | 44.4 GWh | Jul 2020 | Dec 2025 | Natural Gas |
| Amazon JFK8 Solar Project | Solar Star Prime 2, LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Feb 2021 | Dec 2025 | Solar |
| Cortlandville I Solar CSG | DG New York CS, LLC | Cortland, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2021 | Dec 2025 | Solar |
| Sangerfield Solar CSG | DG New York CS, LLC | Waterville, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Clay Solar CSG | DG New York CS, LLC | Clay, NY | New York Independent System Operator (NYIS) | 7.4 GWh | May 2021 | Dec 2025 | Solar |
| Norwich Solar and Energy Storage CSG | DG New York CS, LLC | Norwich, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Aug 2021 | Dec 2025 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Jefferson County, NY | # 29 | 38 | 404.0 GWh |
| Franklin County, NY | # 28 | 17 | 424.5 GWh |
| Westchester County, NY | # 27 | 32 | 439.7 GWh |
| Bronx County, NY | # 26 | 15 | 456.6 GWh |
| Monroe County, NY | # 25 | 42 | 587.3 GWh |
| Onondaga County, NY | # 24 | 46 | 620.8 GWh |
| Yates County, NY | # 23 | 6 | 663.1 GWh |
| Chautauqua County, NY | # 22 | 36 | 883.2 GWh |
| Wyoming County, NY | # 21 | 15 | 1.1 TWh |
| Steuben County, NY | # 20 | 22 | 1.1 TWh |
| Clinton County, NY | # 19 | 26 | 1.6 TWh |
| Lewis County, NY | # 18 | 28 | 1.6 TWh |
| Saratoga County, NY | # 17 | 43 | 1.7 TWh |
| Richmond County, NY | # 16 | 19 | 1.9 TWh |
| Rockland County, NY | # 15 | 10 | 2.1 TWh |
| Nassau County, NY | # 14 | 24 | 2.4 TWh |
| Kings County, NY | # 13 | 31 | 2.5 TWh |
| New York County, NY | # 12 | 19 | 2.5 TWh |
| Greene County, NY | # 11 | 14 | 2.7 TWh |
| Rensselaer County, NY | # 10 | 23 | 3.3 TWh |
| Albany County, NY | # 9 | 33 | 4.1 TWh |
| Wayne County, NY | # 8 | 13 | 4.7 TWh |
| Orange County, NY | # 7 | 60 | 5.7 TWh |
| Dutchess County, NY | # 6 | 22 | 6.4 TWh |
| St. Lawrence County, NY | # 5 | 69 | 7.8 TWh |
| Suffolk County, NY | # 4 | 69 | 9.4 TWh |
| Queens County, NY | # 3 | 23 | 13.7 TWh |
| Niagara County, NY | # 2 | 26 | 14.9 TWh |
| Oswego County, NY | # 1 | 36 | 30.3 TWh |