New York Presbyterian Hospital- 68th Street
525 East 68th St, New York, NY 10021Plant Summary Information
New York Presbyterian Hospital- 68th Street is ranked #49 out of 115 natural gas power plants in New York in terms of total annual net electricity generation.
New York Presbyterian Hospital- 68th Street is comprised of 10 generators and generated 12.9 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | New York Presbyterian Hospital- 68th Street |
|---|---|
| Utility Name | NY - PRESBYTERIAN HOSPITAL- 68TH ST |
| Location | New York County, NY |
| Initial Operation Date | April 1997 |
| Last Update | Dec 2024 |
| Annual Generation | 54.0 GWh |
| Annual Consumption | 609.7 k MMBtu |
| Ranked #4,001 out of 12,539 Power Plants Nationwide | |
| Ranked #1,064 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #123 out of 944 New York Power Plants | |
| Ranked #49 out of 115 New York Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.9% |
| Previous Operator |
NY - PRESBYTERIAN HOSPITAL-525 E 68TH ST (2016 to 2023) NY - PRESBYTERIAN HOSPITAL- 68TH ST (2024 to 2024) |
Map of New York Presbyterian Hospital- 68th Street
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for New York Presbyterian Hospital- 68th Street.
Monthly Net Generation for New York Presbyterian Hospital- 68th Street
New York Presbyterian Hospital- 68th Street Details
| Summary Information | |
|---|---|
| Plant Name | New York Presbyterian Hospital- 68th Street (61238) |
| Plant Address | 525 East 68th St, New York, NY 10021 |
| Utility | NY - PRESBYTERIAN HOSPITAL- 68TH ST (60883) |
| Latitude, Longitude | 40.7644, -73.95393 |
| Generation Dates on File | Jan 2017 to Dec 2024 |
| Initial Operation Date | April 1997 |
| Annual Generation | 54.0 GWh |
| Fuel Types | Natural Gas : 99.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Hospitals (622) |
| Sector | Commercial CHP (5) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | New York State Elec & Gas Corp (13511) NY |
| Grid Voltage | 4.16 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | CONSOLIDATED EDISON NEW YORK INC |
| Natural Gas Storage | No |
Generator GRB1 Details Standby April 1997
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.4 MW |
| Winter Capacity | 1.4 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | April 1997 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator GRB2 Details Standby April 1997
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.4 MW |
| Winter Capacity | 1.4 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | April 1997 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator GRB3 Details Standby April 1997
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.4 MW |
| Winter Capacity | 1.4 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | April 1997 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator GRB4 Details Standby December 2008
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | December 2008 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CGTB Details Operating May 2009
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 7.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 7.7 MW |
| Winter Capacity | 7.7 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2009 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator ANX1 Details Standby May 2016
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | May 2016 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator ANX2 Details Standby May 2016
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | May 2016 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator DHK1 Details Standby November 2017
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | November 2017 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator DHK2 Details Standby November 2017
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | November 2017 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator DHK3 Details Standby November 2017
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | November 2017 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
New York Presbyterian Hospital- 68th Street Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1054 | Gilbert | Milford, NJ | 54.8 GWh |
| #1055 | W&T Onshore Treating Facility (OTF) | Theodore, AL | 54.6 GWh |
| #1056 | Corpus Christi | Corpus Christi, TX | 54.6 GWh |
| #1057 | Georgia-Pacific Taylorsville Plywood | Taylorsville, MS | 54.6 GWh |
| #1058 | Coolidge Generation Station | Coolidge, AZ | 54.5 GWh |
| #1059 | AOC, Capitol Power Plant | Washington, DC | 54.5 GWh |
| #1060 | International Paper Georgetown Mill | Georgetown, SC | 484.7 GWh |
| #1061 | Brunot Island | Pittsburg, PA | 54.1 GWh |
| #1062 | Hopewell Mill | Hopewell, VA | 286.2 GWh |
| #1063 | Neil Simpson II | Gillette, WY | 660.9 GWh |
| #1065 | Sowega Power | Baconton, GA | 53.4 GWh |
| #1066 | Sikorsky Aircraft CHP | Stratford, CT | 53.1 GWh |
| #1067 | APG Combined Heat and Power Plant | Edgewood, MD | 53.0 GWh |
| #1068 | Franklin Heating Station | Rochester, MN | 67.0 GWh |
| #1069 | Hargis-Hebert Electric Generating | Lafayette, LA | 52.7 GWh |
| #1070 | Laredo | Laredo, TX | 52.4 GWh |
| #1071 | Imperial Savannah LP | Port Wentworth, GA | 52.8 GWh |
| #1072 | Amalgamated Sugar LLC Nampa | Nampa, ID | 51.9 GWh |
| #1073 | International Paper Riegelwood Mill | Riegelwood, NC | 329.4 GWh |
| #1074 | Copper | El Paso, TX | 51.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding New York Presbyterian Hospital- 68th Street.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 59th Street | New York, NY | 477.0 MWh | 2 mi |
| 74th Street | New York, NY | 7.0 MWh | 0.3 mi |
| Astoria Energy | New York, NY | 4.1 TWh | 3.3 mi |
| Astoria Energy II | Astoria, NY | 2.6 TWh | 3.2 mi |
| Astoria Generating Station | Astoria, NY | 870.9 GWh | 2.7 mi |
| East River | New York, NY | 2.7 TWh | 2.7 mi |
| Harlem River Yard | Bronx, NY | 109.7 GWh | 3.1 mi |
| Hell Gate | Bronx, NY | 105.5 GWh | 3.3 mi |
| Mount Sinai Beth Israel | New York, NY | 62.0 MWh | 2.6 mi |
| New York University Central Plant | New York, NY | 74.3 GWh | 2.4 mi |
| North 1st | Brooklyn, NY | 67.6 GWh | 3.3 mi |
| NY - PANYNJ - LaGuardia - Rooftop | Queens, NY | 999.0 MWh | 4.2 mi |
| NYC-HH-New Bellevue Hospital | New York, NY | 71.0 MWh | 2.1 mi |
| NYU LANGONE HEALTH | New York, NY | 46.1 GWh | 1.5 mi |
| Peak Power 1 Cogen | New York, NY | 24.1 GWh | 2.2 mi |
| Ravenswood | Long Island, NY | 2.6 TWh | 0.5 mi |
| The Mount Sinai Hospital | New York, NY | 184.0 MWh | 1.8 mi |
| Vernon Boulevard | Long Island City, NY | 117.2 GWh | 0.8 mi |
| Woodhull Hospital | Brooklyn, NY | 162.0 MWh | 4.2 mi |
| Zeltmann | Astoria, NY | 3.2 TWh | 3 mi |