Directory of Power Plants in Minnesota
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Grand Casino Hinckley Solar | DG Central 1, LLC | Hinckley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 GWh | Apr 2022 | Dec 2025 | Solar |
| Hibbing | Hibbing Public Utilities Comm | Hibbing, MN | Midcontinent Independent System Operator, Inc. (MISO) | 39.8 GWh | Mar 1965 | Dec 2025 | Natural Gas : 52.2% Wood/Wood Waste Solids : 46.4% Bituminous Coal : 1.4% |
| Blazing Star 2 Wind Farm | Northern States Power Co - Minnesota | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 837.6 GWh | Dec 2020 | May 2026 | Wind |
| Blazing Star Wind Farm 1 | Northern States Power Co - Minnesota | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 841.4 GWh | Mar 2020 | May 2026 | Wind |
| Jack River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Jessica Mills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Julia Hills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Sun River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Tsar Nicholas LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Shaokatan Hills LLC | Shaokatan Hills, LLC (Longroad) | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 12.1 GWh | Jul 1999 | Dec 2024 | Wind |
| Lakota Ridge LLC | Lakota Ridge, LLC (Longroad) | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 16.7 GWh | Mar 1999 | Dec 2024 | Wind |
| Autumn Hills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Kramer Solar CSG | Geronimo Power | Hector, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Nov 2017 | Dec 2025 | Solar |
| Hayfield Solar III LLC CSG | REA Investments, LLC | Hayfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jan 2021 | Dec 2025 | Solar |
| Hayfield Solar I LLC CSG | REA Investments, LLC | Hayfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jan 2021 | Dec 2025 | Solar |
| Dodge Renewables 2 | Dodge Renewables 2, LLC | Hayfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2022 | Dec 2025 | Solar |
| Hastings Solar | Enel Green Power NA, Inc. | Hastings, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Nov 2016 | Dec 2025 | Solar |
| Hastings City Hydroelectric | Hastings Lock & Dam | Hastings, MN | Midcontinent Independent System Operator, Inc. (MISO) | 13.9 GWh | Dec 1991 | Dec 2025 | Water |
| GRE Marshan Solar | SoCore Energy LLC | Hastings, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Oct 2017 | Dec 2025 | Solar |
| USS Solar Way LLC CSG | Standard Solar | Hartland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2020 | Dec 2025 | Solar |
| Bent Tree Wind Farm Phase 1 | Wisconsin Power & Light Co | Hartland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 334.1 GWh | Jan 2011 | Dec 2025 | Wind |
| USS All In Solar LLC CSG | Standard Solar | Hartland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Sep 2020 | Dec 2025 | Solar |
| Prairie Rose Wind Farm | Prairie Rose Wind Farm | Hardwick, MN | Midcontinent Independent System Operator, Inc. (MISO) | 457.7 GWh | Nov 2012 | May 2026 | Wind |
| Hampton MN GRE | SoCore Energy LLC | Hampton Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Sep 2018 | Sep 2025 | Solar |
| USS Martha Solar (CSG) | United States Solar Corporation | Hamburg, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2023 | Dec 2025 | Solar |
| Halstad | City of Halstad - (MN) | Halstad, MN | Midcontinent Independent System Operator, Inc. (MISO) | 34.0 MWh | Aug 2007 | Dec 2025 | Distillate Fuel Oil |
| Leo Community Solar | Geronimo Power | Hadley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Platt Solar | Cannon River LLC | Hadley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Dec 2022 | Dec 2025 | Solar |
| Pivot Energy Minnesota Solar 10 | Pivot Energy | Greenwald, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2023 | Dec 2025 | Solar |
| MN CSG 2019-79 | MN CSG 2019-79 LLC | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 573.0 MWh | Apr 2025 | Dec 2025 | Solar |
| Crater Community Solar | Crater Community Solar | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Nov 2017 | Dec 2025 | Solar |
| Granite Falls | City of Granite Falls - (MN) | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jul 1932 | Dec 2025 | Water |
| Palmer's Creek Wind Farm, LLC | Palmer's Creek Wind Farm, LLC | Granite Falls, MN | Southwest Power Pool (SWPP) | 131.8 GWh | Nov 2018 | May 2026 | Wind |
| Prairie River | ALLETE, Inc. | Grand Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 1920 | Dec 2025 | Water |
| Rapids Energy Center | ALLETE, Inc. | Grand Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 40.4 GWh | Dec 1942 | Dec 2025 | Natural Gas : 81.7% Water : 18.3% |
| USS Itasca Clean Energy Solar LLC | United States Solar Corporation | Grand Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Jul 2022 | Dec 2025 | Solar |
| Grand Meadow (PV) | OneEnergy, Inc. | Grand Meadow, MN | Midcontinent Independent System Operator, Inc. (MISO) | 425.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Prairie Star Wind Farm | High Prairie Wind Farm II LLC | Grand Meadow, MN | Midcontinent Independent System Operator, Inc. (MISO) | 303.3 GWh | Nov 2007 | Dec 2025 | Wind |
| Mower County Wind Energy Center | Northern States Power Co - Minnesota | Grand Meadow, MN | Midcontinent Independent System Operator, Inc. (MISO) | 334.0 GWh | Nov 2006 | Dec 2025 | Wind |
| Grand Marais | City of Grand Marais - (MN) | Grand Marais, MN | Midcontinent Independent System Operator, Inc. (MISO) | 164.0 MWh | Jan 2004 | Dec 2025 | Distillate Fuel Oil |
| Betcher CSG 1, LLC | Madison Energy Holdings LLC | Goodhue, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Oct 2020 | Dec 2025 | Solar |
| Betcher Community Solar Garden | Betcher CSG LLC | Goodhue, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| USS Wildcat Solar LLC | United States Solar Corporation | Goodhue, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2021 | Dec 2025 | Solar |
| Sturgeon Garden | Sturgeon Garden LLC | Goodhue, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2023 | Dec 2025 | Solar |
| USS Wells Creek Solar LLC | United States Solar Corporation | Goodhue, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2022 | Dec 2025 | Solar |
| USS Maverick Solar LLC (CSG) | United States Solar Corporation | Good Thunder, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Nov 2023 | Dec 2025 | Solar |
| Spring Prairie Solar LLC CSG | United States Solar Corporation | Glyndon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Apr 2024 | Dec 2025 | Solar |
| USS Buckaroo Solar LLC CSG | Standard Solar | Glydon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Sep 2020 | Dec 2025 | Solar |
| Armstrong Solar | ETCAP NES CS MN 06 LLC | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Feb 2018 | Dec 2025 | Solar |
| Aquila Community Solar | Geronimo Power | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2025 | Solar |
| Vega Community Solar | Vega Community Solar | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Sep 2017 | Dec 2025 | Solar |
| Libra Community Solar | Geronimo Power | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Oct 2018 | Dec 2025 | Solar |
| Camellia Solar, LLC | Geronimo Power | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Lantana Solar, LLC | Geronimo Power | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2025 | Solar |
| Cassiopeia Community Solar | Geronimo Power | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2025 | Solar |
| Lowry CSG2, LLC | Nautilus Solar Solutions | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Novel Stavem Solar LLC CSG | REA Investments, LLC | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2021 | Dec 2025 | Solar |
| Freeborn Wind Farm | Northern States Power Co - Minnesota | Glenville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 772.4 GWh | Apr 2021 | May 2026 | Wind |
| Spruce Ridge Gas Recovery | WM Renewable Energy LLC | Glencoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 24.7 GWh | Mar 2008 | Dec 2025 | Landfill Gas |
| Glencoe | Glencoe Light & Power Comm | Glencoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 146.0 MWh | May 1957 | Dec 2025 | Distillate Fuel Oil : 99.7% |
| Plato CSG1, LLC | Nautilus Solar Solutions | Glencoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2020 | Dec 2025 | Solar |
| Gibbon Solar | Green Street Power Partners | Gibbon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | May 2019 | Dec 2025 | Solar |
| Mud Garden Solar | Mud Garden LLC | Gaylord, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 2020 | Dec 2025 | Solar |
| SolarClub 28 LLC | Nautilus Solar Solutions | Gaylord, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Titlow Garden LLC CSG | Titlow Garden LLC | Gaylord, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 2022 | Dec 2024 | Solar |
| USS Kass Solar LLC | Standard Solar | Garvin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Dec 2020 | Dec 2025 | Solar |
| USS KVPV Solar LLC CSG | Standard Solar | Fulton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Sep 2020 | Dec 2025 | Solar |
| Frontenac Holdco LLC, CSG | Frontenac Holdco LLC | Frontenac, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Feb 2019 | Dec 2025 | Solar |
| Michael Solar | SoCore Energy LLC | Freeport, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Nov 2017 | Dec 2025 | Solar |
| USS Catfish Solar LLC | United States Solar Corporation | Franklin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2022 | Dec 2025 | Solar |
| Franklin CSG 1 | Franklin CSG 1 LLC | Franklin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 913.0 MWh | Jun 2025 | Dec 2025 | Solar |
| Preston Garden (CSG) | Preston Garden LLC | Franklin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2024 | Dec 2025 | Solar |
| USS Franklin Solar LLC | United States Solar Corporation | Franklin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2022 | Dec 2025 | Solar |
| Fountain | Altus Power America Management, LLC | Fountain, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.2 GWh | Oct 2021 | Dec 2025 | Solar |
| USS Foley Solar LLC | United States Solar Corporation | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jun 2022 | Dec 2025 | Solar |
| Svihel Community Solar LLC CSG | Svihel Community Solar LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Mar 2021 | Dec 2025 | Solar |
| Stevens Community Solar LLC | Madison Energy Holdings LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Sep 2020 | Dec 2025 | Solar |
| Caelum Community Solar | Caelum Community Solar | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Sep 2017 | Dec 2025 | Solar |
| Novel Novak Solar LLC CSG | REA Investments, LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Jul 2021 | Dec 2025 | Solar |
| Hoot Lake | Otter Tail Power Co | Fergus Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Aug 1914 | Dec 2025 | Water |
| Hoot Lake Solar | Otter Tail Power Co | Fergus Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 71.2 GWh | Jul 2023 | May 2026 | Solar |
| USS Horne North Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2020 | Dec 2025 | Solar |
| USS Horne South Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2020 | Dec 2025 | Solar |
| USS JJ Clay Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Sep 2020 | Dec 2025 | Solar |
| SunE Feely 1 CSG, LLC | Ecoplexus, Inc | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Aug 2018 | Dec 2025 | Solar |
| Dakota Community Solar One LLC CSG | Madison Energy Holdings LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Farmington Holdco Solar | Farmington Holdco LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Jan 2017 | Dec 2025 | Solar |
| Ursa Community Solar | Ursa Community Solar | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Dec 2016 | Dec 2025 | Solar |
| MSC-Empire01, LLC | MSC-Empire01, LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
| Empire Solar | Cypress Creek Renewables | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Nov 2016 | Dec 2025 | Solar |
| FastSun 19 CSG | Altus Power America Management, LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2020 | Dec 2025 | Solar |
| Vermillion River_MN_GRE DEA-GM | SoCore Energy LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Straight Garden Solar | Straight Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 2020 | Dec 2025 | Solar |
| Marion Garden | Excelsior Energy Capital | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Oct 2020 | Dec 2025 | Solar |
| West Faribault Solar | Enel Green Power NA, Inc. | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.1 GWh | Nov 2016 | Dec 2025 | Solar |
| Cannon Garden Solar | Cannon Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2019 | Dec 2025 | Solar |
| Roberds Garden CSG | Roberds Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2019 | Dec 2024 | Solar |
| Falls Creek Garden | Falls Creek Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jan 2020 | Oct 2025 | Solar |
| Walcott Solar CSG | Altus Power America Management, LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Jun 2020 | Dec 2025 | Solar |
| Faribault Energy Park | Minnesota Municipal Power Agny | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 800.1 GWh | Apr 2005 | Dec 2025 | Natural Gas |