| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| M L Hibbard | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 93.6 GWh | May 1949 | Aug 2025 | Wood/Wood Waste Solids : 92.5% Subbituminous Coal : 6.6% Natural Gas : 1.0% |
| St Paul Cogeneration | St Paul Cogeneration LLC | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 151.1 GWh | Mar 2003 | Dec 2024 | Wood/Wood Waste Solids : 82.2% Natural Gas : 17.8% |
| Carleton College | Carleton College | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Aug 2004 | Dec 2024 | Wind : 99.8% |
| Worthington | City of Worthington - (MN) | Worthington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Jan 2002 | Dec 2024 | Wind : 98.9% Distillate Fuel Oil : 1.1% |
| Mountain Lake | City of Mountain Lake - (MN) | Mountain Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Apr 1954 | Dec 2024 | Wind : 97.7% Natural Gas : 1.8% |
| Red Lake Falls Community Hybrid | Consolidated Edison Development Inc. | Red Lake Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 GWh | Nov 2020 | Dec 2024 | Wind : 95.1% Solar : 4.9% |
| Blazing Star Wind Farm 1 | Northern States Power Co - Minnesota | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 855.7 GWh | Mar 2020 | Aug 2025 | Wind |
| Red Pine Wind Project | EDF Renewable Asset Holdings, Inc. | Ivanhoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 740.5 GWh | Nov 2017 | Aug 2025 | Wind |
| Cisco | ALLETE Clean Energy | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Jan 2008 | Dec 2024 | Wind |
| Lincoln Heights I | ALLETE Clean Energy | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 GWh | Apr 2006 | Dec 2024 | Wind |
| Lincoln Heights II | ALLETE Clean Energy | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 GWh | Apr 2006 | Dec 2024 | Wind |
| Rock County Wind Fuel, LLC | Rock County Wind Fuel, LLC | Luverne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 20.3 GWh | Apr 2020 | Dec 2024 | Wind |
| REG Juhl Glenville Wind, LLC | REG Juhl Glenville Wind, LLC | Albert Lea, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.4 GWh | Nov 2020 | Dec 2024 | Wind |
| Stoneray Power Partners, LLC | EDF Renewable Asset Holdings, Inc. | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 377.7 GWh | Jan 2019 | Aug 2025 | Wind |
| Pleasant Valley Wind Farm | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 770.3 GWh | Jul 2015 | Dec 2024 | Wind |
| St. Olaf Wind Turbine | St. Olaf College | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Aug 2006 | Dec 2024 | Wind |
| Lakeswind Power Partners | Lakeswind Power Partners | Pelican Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 150.9 GWh | Feb 2014 | Dec 2024 | Wind |
| Blazing Star 2 Wind Farm | Northern States Power Co - Minnesota | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 853.9 GWh | Dec 2020 | Aug 2025 | Wind |
| Hilltop Power | Hilltop Power, LLC | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2008 | Dec 2024 | Wind |
| Odell Wind Farm | Algonquin Power Co | Mountain Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 773.1 GWh | Jun 2016 | Dec 2024 | Wind |
| Palmer's Creek Wind Farm, LLC | Palmer's Creek Wind Farm, LLC | Granite Falls, MN | Southwest Power Pool (SWPP) | 132.3 GWh | Nov 2018 | Aug 2025 | Wind |
| Lake Region Community Hybrid, LLC | Lake Region Community Hybrid, LLC | Rothsay, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Nov 2018 | Dec 2024 | Wind |
| Nobles 2 Wind Project | Nobles 2 Power Partners, LLC | Wilmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 978.1 GWh | Nov 2020 | Aug 2025 | Wind |
| Valley View Transmission LLC | Consolidated Edison Development Inc. | Chandler, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Jun 2011 | Dec 2024 | Wind |
| Fenton Wind Farm | EDF Renewable Asset Holdings, Inc. | Chandler, MN | Midcontinent Independent System Operator, Inc. (MISO) | 342.7 GWh | Aug 2007 | Aug 2025 | Wind |
| Green Acres Breeze LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2006 | Dec 2024 | Wind |
| Wolf Wind Enterprises LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2006 | Dec 2024 | Wind |
| G Flow Wind LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2006 | Dec 2024 | Wind |
| South Fork Wind Farm | South Fork Wind, LLC | Round Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 52.3 GWh | Nov 2016 | Dec 2024 | Wind |
| Community Wind North LLC | Northern States Power Co - Minnesota | Verdi Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 114.7 GWh | Apr 2011 | Dec 2024 | Wind |
| Adams Wind Generations LLC | BEAM US, LLC | Cosmos, MN | Midcontinent Independent System Operator, Inc. (MISO) | 46.5 GWh | Feb 2011 | Dec 2024 | Wind |
| Wapsipinicon Wind Project | EDF Renewable Asset Holdings, Inc. | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 259.7 GWh | Jan 2009 | Dec 2024 | Wind |
| Marshall Wind 1 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Nov 2007 | Dec 2024 | Wind |
| Marshall Wind 6 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Nov 2007 | Dec 2024 | Wind |
| Marshall Wind 5 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2007 | Dec 2024 | Wind |
| Marshall Wind 4 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.2 GWh | Nov 2007 | Dec 2024 | Wind |
| Marshall Wind 3 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Nov 2007 | Dec 2024 | Wind |
| Marshall Wind 2 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Nov 2007 | Dec 2024 | Wind |
| Moraine II Wind LLC | Avangrid Power LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 72.9 GWh | Jan 2009 | Dec 2024 | Wind |
| Elm Creek Wind LLC | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 176.1 GWh | Nov 2008 | Dec 2024 | Wind |
| Odin Wind Farm LLC | Aspenall Energies (Delaware), LLC | Mountainlake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 29.0 GWh | Apr 2008 | Dec 2024 | Wind |
| Black Oak Wind Farm | Black Oak Wind, LLC | Sauk Centre, MN | Midcontinent Independent System Operator, Inc. (MISO) | 303.8 GWh | Nov 2016 | Aug 2025 | Wind |
| Taconite Ridge 1 Wind Energy Center | ALLETE, Inc. | Mountain Iron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 47.4 GWh | Apr 2008 | Dec 2024 | Wind |
| Grand Meadow | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 380.3 GWh | Nov 2008 | Dec 2024 | Wind |
| Prairie Rose Wind Farm | Enel Green Power NA, Inc. | Hardwick, MN | Midcontinent Independent System Operator, Inc. (MISO) | 413.0 GWh | Nov 2012 | Aug 2025 | Wind |
| Elm Creek Wind II LLC | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 205.4 GWh | Nov 2010 | Dec 2024 | Wind |
| UMM Wind Turbine | University of Minnesota Morris Campus | Morris, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | May 2011 | Dec 2024 | Wind |
| GL Wind | GL Wind LLC | Lewiston, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Nov 2011 | Dec 2024 | Wind |
| WCROC Wind Farm | University of Minnesota WCROC | Morris, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Feb 2005 | Dec 2024 | Wind |
| Eolos Wind Energy Research Field Station | Regents of the University of Minnesota | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Sep 2011 | Dec 2024 | Wind |
| Freeborn Wind Farm | Northern States Power Co - Minnesota | Glenville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 730.5 GWh | Apr 2021 | Aug 2025 | Wind |
| Community Wind South | Greenbacker Renewable Energy Corporation | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 132.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Blue Breezes II LLC | Midwest Power Partners LLC | Blue Earth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Apr 2006 | Dec 2024 | Wind |
| Noble Ridge LLC | RENEW Energy Inc | Wilmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 61.0 MWh | Nov 2001 | Dec 2024 | Wind |
| Windcurrent Farms LLC | Windcurrent Farms LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Aug 2003 | Dec 2024 | Wind |
| Fey Windfarm LLC | Fey Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Aug 2003 | Dec 2024 | Wind |
| Westridge Windfarm LLC | Westridge Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 288.0 MWh | Oct 2003 | Dec 2024 | Wind |
| Tofteland Windfarm LLC | Tofteland Windfarm LLC | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 288.0 MWh | Sep 2003 | Dec 2024 | Wind |
| Bisson Windfarm LLC | Bisson Windfarm LLC | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 288.0 MWh | Sep 2003 | Dec 2024 | Wind |
| CG Windfarm LLC | CG Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 144.0 MWh | Nov 2003 | Dec 2024 | Wind |
| TG Windfarm LLC | TG Windfarm LLC | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 288.0 MWh | Oct 2003 | Dec 2024 | Wind |
| Moraine Wind LLC | Avangrid Power LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 61.0 GWh | Nov 2003 | Dec 2024 | Wind |
| G McNeilus Wind Farm Dodge Center | Justin McNeilus | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 94.0 GWh | Aug 2002 | Dec 2024 | Wind |
| Minwind | Community Renewables, LLC | Luverne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 276.0 MWh | Sep 2002 | Dec 2024 | Wind |
| Kas Brothers Windfarm | Kas Brothers Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2001 | Dec 2024 | Wind |
| K-Brink Windfarm LLC | K-brink Windfarm, LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Jan 2003 | Dec 2024 | Wind |
| Agassiz Beach LLC | CHI Operations Inc | Averill, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jan 2001 | Dec 2024 | Wind |
| Florence Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Hadley Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2000 | Dec 2024 | Wind |
| Hope Creek LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Ruthton Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Soliloquoy Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Spartan Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Twin Lake Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2000 | Dec 2024 | Wind |
| Winters Spawn LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Autumn Hills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Jack River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Greenback Energy | Greenback Energy, LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Nov 2004 | Dec 2024 | Wind |
| Sunset Breeze LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2006 | Dec 2024 | Wind |
| Jeffers Wind 20 LLC | Northern States Power Co - Minnesota | Jeffers, MN | Midcontinent Independent System Operator, Inc. (MISO) | 195.4 GWh | Sep 2008 | Dec 2024 | Wind |
| Blue Breezes LLC | Midwest Power Partners LLC | Blue Earth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Apr 2006 | Dec 2024 | Wind |
| Shane's Wind Machine | Shane's Wind Machine LLC | Ruthton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Jun 2006 | Dec 2024 | Wind |
| Windom Wind Project | Midwest Power Partners LLC | Bingham Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 33.4 GWh | Feb 2006 | Dec 2024 | Wind |
| Eastridge Wind Project | Eastridge Wind Project | Porter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 GWh | Mar 2006 | Dec 2024 | Wind |
| Prairie Star Wind Farm | High Prairie Wind Farm II LLC | Grand Meadow, MN | Midcontinent Independent System Operator, Inc. (MISO) | 298.2 GWh | Nov 2007 | Dec 2024 | Wind |
| MinnDakota Wind LLC | Avangrid Power LLC | Ivanhoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 282.9 GWh | Dec 2007 | Dec 2024 | Wind |
| Mower County Wind Energy Center | Northern States Power Co - Minnesota | Grand Meadow, MN | Midcontinent Independent System Operator, Inc. (MISO) | 343.3 GWh | Nov 2006 | Dec 2024 | Wind |
| Fairmont Wind | Southern Minnesota Mun P Agny | Fairmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 14.6 GWh | Feb 2003 | Dec 2024 | Wind |
| Redwood Falls Wind | Southern Minnesota Mun P Agny | Redwood Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.7 GWh | Nov 2004 | Dec 2024 | Wind |
| Minnesota Breeze LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2006 | Dec 2024 | Wind |
| Lucky Wind | Lucky Wind, LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2004 | Dec 2024 | Wind |
| Northern Lights Wind LLC | Northern Lights Wind LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Nov 2004 | Dec 2024 | Wind |
| Carstensen Wind | Carstensen Wind, LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2004 | Dec 2024 | Wind |
| Stahl Wind Energy | Stahl Wind Energy, LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Nov 2004 | Nov 2024 | Wind |
| Adams Wind Farm | Consolidated Edison Development Inc. | Adams, MN | Midcontinent Independent System Operator, Inc. (MISO) | 20.2 GWh | Aug 2003 | Dec 2024 | Wind |
| Trimont Area Wind Farm | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 378.9 GWh | Oct 2005 | Dec 2024 | Wind |
| B&K Energy Systems LLC | Brewster | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2003 | Dec 2024 | Wind |
| Boeve Windfarm LLC | Boeve Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jul 2003 | Dec 2024 | Wind |
| S&P Windfarm LLC | Brewster | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2003 | Dec 2024 | Wind |
| DL Windy Acres LLC | Brewster | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2003 | Dec 2024 | Wind |