B&K Energy Systems LLC
80442 350th Avenue, Brewster, MN 56119Plant Summary Information
B&K Energy Systems LLC is ranked #90 out of 125 wind farms in Minnesota in terms of total annual net electricity generation.
B&K Energy Systems LLC generated 1.0 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | B&K Energy Systems LLC |
|---|---|
| Utility Name | Brewster |
| Location | Jackson County, MN |
| Initial Operation Date | December 2003 |
| Last Update | Dec 2024 |
| Annual Generation | 4.1 GWh |
| Annual Consumption | 15.5 k MMBtu |
| Ranked #8,526 out of 12,539 Power Plants Nationwide | |
| Ranked #1,266 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #309 out of 759 Minnesota Power Plants | |
| Ranked #90 out of 125 Minnesota Wind Power Plants | |
| Fuel Types | Wind |
Map of B&K Energy Systems LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for B&K Energy Systems LLC.
Monthly Net Generation for B&K Energy Systems LLC
B&K Energy Systems LLC Details
| Summary Information | |
|---|---|
| Plant Name | B&K Energy Systems LLC (56210) |
| Plant Address | 80442 350th Avenue, Brewster, MN 56119 |
| Utility | Brewster (56800) |
| Latitude, Longitude | 43.65139, -95.3755 |
| Generation Dates on File | Jan 2005 to Dec 2024 |
| Initial Operation Date | December 2003 |
| Annual Generation | 4.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 07-244-000 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 04-89-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Great River Energy (7570) |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2003
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 2 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 2 |
|---|---|
| Predominant Turbine Manufacturer | Suzlon |
| Predominant Turbine Model Number | S64-1250 |
| Design Wind Speed | 17.8 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 213.3 |
B&K Energy Systems LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1256 | NLMU Wind | New London, IA | 4.3 GWh |
| #1257 | WED Portsmouth One, LLC | Portsmouth, RI | 4.3 GWh |
| #1258 | Notus Wind 1 | E. Falmouth, MA | 4.3 GWh |
| #1259 | Anheuser-Busch #2 | Fairfield, CA | 4.3 GWh |
| #1260 | Waxdale | Sturtevant, WI | 36.2 GWh |
| #1261 | Two Dot Wind Broadview East LLC | Broadview, MT | 4.2 GWh |
| #1262 | Bulldog | Orient, IA | 4.1 GWh |
| #1263 | Hilltop Power | Edgerton, MN | 4.1 GWh |
| #1264 | DL Windy Acres LLC | Brewster, MN | 4.1 GWh |
| #1265 | S&P Windfarm LLC | Brewster, MN | 4.1 GWh |
| #1267 | UMM Wind Turbine | Morris, MN | 4.0 GWh |
| #1268 | WCROC Wind Farm | Morris, MN | 4.0 GWh |
| #1269 | City of Soledad Water Reclamation | Soledad, CA | 4.0 GWh |
| #1270 | Foundation Scheid Vineyards | Greenfield, CA | 3.9 GWh |
| #1271 | Zephyr Wind Project - 2.0 | Findlay, OH | 3.9 GWh |
| #1272 | Delta Wind Farm | Delta Junction, AK | 3.9 GWh |
| #1273 | Heartland Community College | Normal, IL | 3.9 GWh |
| #1274 | Taylor Farms | Gonzales, CA | 3.9 GWh |
| #1275 | Green Providence Wind II, LLC | Providence, RI | 3.8 GWh |
| #1276 | Golden Acorn Casino | Campo, CA | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding B&K Energy Systems LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cisco | Brewster, MN | 9.1 GWh | 1.8 mi |
| DL Windy Acres LLC | Brewster, MN | 4.1 GWh | 0.3 mi |
| Ewington Energy Systems, LLC | Worthington, MN | 85.5 GWh | 3.1 mi |
| Flying Cloud Power Partners LLC | Lake Park, IA | 81.0 GWh | 18.5 mi |
| G Flow Wind LLC | Rushmore, MN | 2.0 GWh | 20.5 mi |
| Green Acres Breeze LLC | Rushmore, MN | 2.0 GWh | 20.7 mi |
| Lake Park | Lake Park, IA | 46.0 MWh | 15.6 mi |
| Lakefield Utilities | Lakefield, MN | 6.0 MWh | 10.4 mi |
| Lakefield Wind Project LLC | Lakefield, MN | 323.2 GWh | 11.1 mi |
| Lost Lakes Wind Farm LLC | Lake Park, IA | 243.7 GWh | 21.3 mi |
| Minnesota Breeze LLC | Rushmore, MN | 2.0 GWh | 20.7 mi |
| Nobles Wind Project | Reading, MN | 804.2 GWh | 17.3 mi |
| Osceola Windpower II | Harris, IA | 196.9 GWh | 15.4 mi |
| Osceola Windpower LLC | Harris, IA | 386.7 GWh | 15.4 mi |
| S&P Windfarm LLC | Brewster, MN | 4.1 GWh | 0.3 mi |
| South Fork Wind Farm | Round Lake, MN | 52.3 GWh | 4.4 mi |
| Sunset Breeze LLC | Rushmore, MN | 2.0 GWh | 20.8 mi |
| Windom | Windom, MN | 23.0 MWh | 19.8 mi |
| Wolf Wind Enterprises LLC | Rushmore, MN | 2.0 GWh | 20.6 mi |
| Worthington | Worthington, MN | 9.0 GWh | 11.8 mi |