Directory of Power Plants in Minnesota
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Chisago Solar | Enel Green Power NA, Inc. | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.8 GWh | Nov 2016 | Dec 2025 | Solar |
| Chub Garden Solar | Chub Garden LLC | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 2020 | Dec 2025 | Solar |
| Cisco | ALLETE Clean Energy | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 11.9 GWh | Jan 2008 | Dec 2025 | Wind |
| Clara City Solar | Clara City Solar LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Clay Boswell | ALLETE, Inc. | Cohasset, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 TWh | Jun 1958 | May 2026 | Subbituminous Coal : 99.8% |
| Clear Garden CSG | Clear Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2019 | Dec 2025 | Solar |
| Cokato CSG | Cokato Holdco LLC | Cokato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Jul 2021 | Dec 2025 | Solar |
| Community Wind North LLC | Northern States Power Co - Minnesota | Verdi Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 110.3 GWh | Apr 2011 | Dec 2025 | Wind |
| Community Wind South | Greenbacker Renewable Energy Corporation | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 87.9 GWh | Nov 2012 | Dec 2025 | Wind |
| Connexus Solar Stanford 1STF | REA Investments, LLC | St. Francis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 13.1 GWh | Apr 2021 | Dec 2025 | Solar |
| Coral Bells Solar, LLC | Geronimo Power | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Corcoran CSG | Altus Power America Management, LLC | Corcoran, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Dec 2018 | Dec 2025 | Solar |
| Cornillie | Terraform Arcadia | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Cornillie 2 Community (CSG) | CleanCapital Holdings | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Cornillie Solar CSG | Madison Energy Holdings LLC | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Corvus Community Solar | Corvus Community Solar | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Sep 2018 | Dec 2025 | Solar |
| Cottage Grove CSG, LLC | Ecoplexus, Inc | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.3 GWh | Feb 2018 | Dec 2025 | Solar |
| Cottage Grove Project CSG | Madison Energy Investments LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 GWh | Sep 2018 | Sep 2025 | Solar |
| Courtland CSG LLC | United States Solar Corporation | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jun 2023 | Dec 2025 | Solar |
| Covanta Hennepin Energy | Covanta Energy Co | Minneapolis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 194.9 GWh | Sep 1989 | May 2026 | Non-biogenic Municipal Solid Waste : 54.5% Biogenic Municipal Solid Waste : 44.6% Natural Gas : 0.8% |
| Crane Garden | Crane Garden LLC | Lester Prairie, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Oct 2023 | Dec 2025 | Solar |
| Crater Community Solar | Crater Community Solar | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Nov 2017 | Dec 2025 | Solar |
| Crux Community Solar | Geronimo Power | Kasson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 2018 | Dec 2025 | Solar |
| Dakota Community Solar One LLC CSG | Madison Energy Holdings LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Danielson Wind Farms LLC | BEAM US, LLC | Cosmos, MN | Midcontinent Independent System Operator, Inc. (MISO) | 55.9 GWh | Feb 2011 | Dec 2025 | Wind |
| Delano | Delano Municipal Utilities (MN) | Delano, MN | Midcontinent Independent System Operator, Inc. (MISO) | 52.9 MWh | Sep 1946 | Dec 2025 | Distillate Fuel Oil |
| Delphinus Community Solar | Delphinus Community Solar | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Feb 2018 | Dec 2025 | Solar |
| Deneb Community Solar | Geronimo Power | Belgrade, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2019 | Dec 2024 | Solar |
| Detroit Lakes | City of Detroit Lakes - (MN) | Detroit Lakes, MN | Midcontinent Independent System Operator, Inc. (MISO) | 41.0 MWh | Jun 1968 | Dec 2025 | Distillate Fuel Oil |
| DG Green Arrow | DG Green Arrow LLC | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2025 | Dec 2025 | Solar |
| Dickinson Solar Array | Great River Energy | Buffalo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Jul 2016 | Dec 2025 | Solar |
| DIVOCSG 11 - Sherburne | Madison Energy Investments LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 713.0 MWh | May 2024 | Dec 2025 | Solar |
| DIVOCSG 13 | DIVOCSG 13 LLC | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Mar 2025 | Dec 2025 | Solar |
| DIVOCSG 14 LLC | DIVOCSG 14 LLC | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 862.0 MWh | May 2025 | Dec 2025 | Solar |
| DIVOCSG 2 LLC | Madison Energy Investments LLC | Cokato, MN | Southwest Power Pool (SWPP) | 742.0 MWh | Nov 2023 | Dec 2025 | Solar |
| DL Windy Acres LLC | Brewster | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Nov 2003 | Dec 2025 | Wind |
| Dodge Center Solar | Enel Green Power NA, Inc. | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Nov 2016 | Dec 2025 | Solar |
| Dodge Holdco Solar CSG | Dodge Holdco LLC | Kasson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.3 GWh | Jun 2017 | Dec 2025 | Solar |
| Dodge Renewables 1 | Dodge Renewables 1, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2022 | Dec 2025 | Solar |
| Dodge Renewables 2 | Dodge Renewables 2, LLC | Hayfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2022 | Dec 2025 | Solar |
| DodgeSun CSG | Geronimo Power | Kasson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Douglas Todd Community Solar One LLC CSG | Madison Energy Holdings LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| DSI Don Solar | DSI Don Solar LLC | Renville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jun 2024 | Dec 2025 | Solar |
| DSI Julie Solar | DSI Julie Solar LLC | Cold Spring, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2024 | Dec 2025 | Solar |
| Dundas Solar Holdings LLC CSG | Altus Power America Management, LLC | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Feb 2018 | May 2026 | Solar |
| E. Goenner Project CSG | E. Goenner Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Eastridge Wind Project | Eastridge Wind Project | Porter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 13.8 GWh | Mar 2006 | Dec 2025 | Wind |
| Eastwood Solar | Enel Green Power NA, Inc. | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.7 GWh | Nov 2016 | Dec 2025 | Solar |
| Eichtens Community Solar | Terraform Arcadia | Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Eichtens II CSG | Terraform Arcadia | Winstead, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2018 | Dec 2025 | Solar |
| Elk River | Great River Energy | Elk River, MN | Midcontinent Independent System Operator, Inc. (MISO) | 155.5 GWh | Dec 1950 | May 2026 | Natural Gas : 90.8% Distillate Fuel Oil : 9.2% |
| Elm Creek Wind II LLC | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 187.1 GWh | Nov 2010 | Dec 2025 | Wind |
| Elm Creek Wind LLC | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 191.6 GWh | Nov 2008 | Dec 2025 | Wind |
| Empire Solar | Cypress Creek Renewables | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Nov 2016 | Dec 2025 | Solar |
| Enter Solar | Arcadia Solar, LLC | Janesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 2018 | Dec 2025 | Solar |
| Enterprise MN - Buscho CSG | Standard Solar | Owatonna, MN | Midcontinent Independent System Operator, Inc. (MISO) | 26.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Enterprise MN - Ferche CSG | Standard Solar | Paynesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 35.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Eolos Wind Energy Research Field Station | Regents of the University of Minnesota | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2011 | Dec 2025 | Wind |
| Equuleus Community Solar Gardens | MN8 Energy LLC | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Jul 2017 | Dec 2025 | Solar |
| Erin Garden Solar | Erin Garden LLC | City of Green Isle, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2020 | Dec 2025 | Solar |
| Everson Garden | Everson Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2022 | Dec 2025 | Solar |
| Ewington Energy Systems, LLC | Ewington Energy Systems, LLC | Worthington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 81.4 GWh | Dec 2007 | Dec 2025 | Wind |
| Fairfax | City of Fairfax - (MN) | Fairfax, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Jul 2001 | Dec 2025 | Distillate Fuel Oil |
| Fairmont (MN) | Southern Minnesota Mun P Agny | Fairmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Dec 1974 | Dec 2025 | Natural Gas : 98.8% Distillate Fuel Oil : 1.2% |
| Fairmont Wind | Southern Minnesota Mun P Agny | Fairmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 13.0 GWh | Feb 2003 | Dec 2025 | Wind |
| Falls Creek Garden | Falls Creek Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jan 2020 | Oct 2025 | Solar |
| Faribault Energy Park | Minnesota Municipal Power Agny | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 800.1 GWh | Apr 2005 | Dec 2025 | Natural Gas |
| Farmington Holdco Solar | Farmington Holdco LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Jan 2017 | Dec 2025 | Solar |
| FastSun 1 CSG | Altus Power America Management, LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 10 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2020 | Dec 2025 | Solar |
| FastSun 11 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2020 | Dec 2025 | Solar |
| FastSun 13 CSG | Altus Power America Management, LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 14 CSG | Altus Power America Management, LLC | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 18 CSG | Altus Power America Management, LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2019 | Dec 2025 | Solar |
| FastSun 19 CSG | Altus Power America Management, LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2020 | Dec 2025 | Solar |
| FastSun 2 CSG | Altus Power America Management, LLC | Randolph Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2020 | Dec 2025 | Solar |
| FastSun 21 CSG | Altus Power America Management, LLC | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2021 | Dec 2025 | Solar |
| FastSun 3 CSG | Altus Power America Management, LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 4 CSG | Altus Power America Management, LLC | Hugo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2021 | Dec 2025 | Solar |
| FastSun 5 CSG | Altus Power America Management, LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2019 | Dec 2025 | Solar |
| FastSun 7 CSG | Altus Power America Management, LLC | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 8 CSG | Altus Power America Management, LLC | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 9 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2020 | Dec 2025 | Solar |
| FastSun12 CSG | Altus Power America Management, LLC | Morristown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jun 2021 | Dec 2025 | Solar |
| Felton CSG PV1-5 | Ecoplexus, Inc | Randolph, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | May 2019 | Dec 2025 | Solar |
| Fenton Wind Farm | EDF Renewable Asset Holdings, Inc. | Chandler, MN | Midcontinent Independent System Operator, Inc. (MISO) | 386.5 GWh | Aug 2007 | May 2026 | Wind |
| Fey Windfarm LLC | Fey Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Aug 2003 | Dec 2025 | Wind |
| Fillmore County Solar Project | Geronimo Power | Spring Valley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 80.6 GWh | Nov 2024 | May 2026 | Solar |
| Flint Hills Resources Pine Bend, LLC | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 361.6 GWh | Apr 2019 | Dec 2025 | Natural Gas : 78.8% Solar : 21.2% |
| Flodquist Community Solar LLC CSG | Flodquist Community Solar LLC | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jul 2021 | Dec 2025 | Solar |
| Florence Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Fond Du Lac | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 37.6 GWh | Dec 1923 | Dec 2025 | Water |
| Foreman's Hill Community Solar | Foreman's Hill CSG LLC | Red Wing, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | Jun 2018 | Dec 2024 | Solar |
| Forest Lake Solar CSG | Forest Lake Holdco LLC | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.3 GWh | Jun 2017 | Dec 2025 | Solar |
| Fountain | Altus Power America Management, LLC | Fountain, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.2 GWh | Oct 2021 | Dec 2025 | Solar |
| Fox CSG, LLC | Ecoplexus, Inc | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | Feb 2018 | Dec 2025 | Solar |
| Franklin CSG 1 | Franklin CSG 1 LLC | Franklin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 913.0 MWh | Jun 2025 | Dec 2025 | Solar |
| Franklin Heating Station | Franklin Heating Station | Rochester, MN | Midcontinent Independent System Operator, Inc. (MISO) | 63.0 GWh | Dec 1950 | May 2026 | Natural Gas : 82.3% Purchased Steam : 16.4% Distillate Fuel Oil : 1.2% |
| Freeborn Wind Farm | Northern States Power Co - Minnesota | Glenville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 772.4 GWh | Apr 2021 | May 2026 | Wind |
| Frontenac Holdco LLC, CSG | Frontenac Holdco LLC | Frontenac, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Feb 2019 | Dec 2025 | Solar |