Directory of Power Plants in Indiana
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| POET Biorefining- Alexandria, LLC | POET Biorefining - Alexandria, LLC. | Alexandria, IN | PJM Interconnection, LLC (PJM) | 18.8 GWh | Mar 2008 | Dec 2024 | Natural Gas |
| Anderson 6 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.3 GWh | May 2022 | Dec 2024 | Solar |
| Anderson | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 1.0 TWh | May 1992 | Dec 2024 | Natural Gas : 97.7% Distillate Fuel Oil : 2.3% |
| IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Anderson 4 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 15.0 GWh | Jul 2021 | Dec 2024 | Solar |
| Anderson 3 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 16.8 GWh | Nov 2021 | Dec 2024 | Solar |
| IMPA Anderson Solar Park | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 7.5 GWh | Dec 2016 | Dec 2024 | Solar |
| Anderson 5 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 6.0 GWh | Jul 2021 | Dec 2024 | Solar |
| Zimmerman Energy | Landfill Energy Systems | Argos, IN | Midcontinent Independent System Operator, Inc. (MISO) | 39.5 GWh | Oct 2014 | Sep 2025 | Landfill Gas |
| Staunton | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Pastime Farm, LLC | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.4 GWh | Oct 2022 | Dec 2024 | Solar |
| ArcelorMittal Burns Harbor | Cleveland-Cliffs Burns Harbor LLC | Burns Harbor, IN | Midcontinent Independent System Operator, Inc. (MISO) | 922.0 GWh | Dec 1968 | Dec 2024 | Blast Furnace Gas : 42.6% Other Gas : 32.9% Natural Gas : 24.4% |
| Cayuga | Duke Energy Indiana, LLC | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 TWh | Sep 1970 | Aug 2025 | Bituminous Coal : 99.6% |
| Vermillion Energy Facility | Duke Energy Ohio Inc | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 727.9 GWh | May 2000 | Dec 2024 | Natural Gas |
| Richmond | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 68.5 GWh | Apr 1992 | Dec 2024 | Natural Gas |
| Centerville Solar Park | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
| Indiana Crossroads Wind Farm LLC | Indiana Crossroads Wind Farms LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 901.7 GWh | Nov 2021 | Sep 2025 | Wind |
| Meadow Lake Wind Farm V LLC | Meadow Lake Wind Farm V LLC | Chalmers, IN | PJM Interconnection, LLC (PJM) | 323.7 GWh | Jun 2017 | Sep 2025 | Wind |
| Rosewater Wind Farm | Rosewater Wind Farm LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 308.3 GWh | Nov 2020 | Sep 2025 | Wind |
| Columbia City Solar Park | Indiana Municipal Power Agency | Columbia City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Mar 2021 | Dec 2024 | Solar |
| Jackson Co. Solar RES | Hoosier Energy R E C, Inc | Columbus, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Aug 2017 | Dec 2024 | Solar |
| Crane Solar Facility | Duke Energy Indiana, LLC | Crane, IN | Midcontinent Independent System Operator, Inc. (MISO) | 28.6 GWh | Dec 2016 | Dec 2024 | Solar |
| Crawfordsville Solar Park 4 | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | May 2020 | Dec 2024 | Solar |
| Crawfordsville 5 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.7 GWh | Aug 2020 | Dec 2024 | Solar |
| Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Nov 2019 | Dec 2024 | Solar |
| IMPA Crawfordsville Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Aug 2015 | Dec 2024 | Solar |
| New Haven Solar RES | Hoosier Energy R E C, Inc | Dale, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Aug 2016 | Dec 2024 | Solar |
| Hendricks Regional Health | Hendricks Regional Health | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 23.0 MWh | Aug 1992 | Sep 2025 | Distillate Fuel Oil |
| Twin Bridges LFGTE | Wabash Valley Power Assn, Inc | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.1 GWh | Sep 1994 | Dec 2023 | Landfill Gas |
| C&B Graham Energy, LLC | SolRiver Capital LLC | Danville, IN | PJM Interconnection, LLC (PJM) | 13.9 GWh | Jul 2023 | Dec 2024 | Solar |
| Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | PJM Interconnection, LLC (PJM) | 9.3 GWh | Nov 1950 | Jul 2025 | Natural Gas |
| Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 357.6 GWh | Apr 2008 | Dec 2024 | Wind |
| Indiana Harbor West | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 245.0 GWh | Sep 1939 | Dec 2024 | Natural Gas |
| Heat Recovery Coke Facility | Cokenergy Inc | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 438.1 GWh | Mar 1998 | Sep 2025 | Waste Heat |
| Indiana Harbor E 5 AC Station | Northlake Energy | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 655.1 GWh | Apr 1996 | Dec 2024 | Blast Furnace Gas : 92.6% Natural Gas : 7.4% |
| Expander Turbine | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 85.1 GWh | Apr 1981 | Sep 2025 | Blast Furnace Gas |
| East Chicago | Altus Power America Management, LLC | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Feb 2013 | Dec 2024 | Solar |
| Camp Atterbury Microgrid Hybrid | Duke Energy Indiana, LLC | Edinburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Oct 2019 | Dec 2024 | Solar |
| Edwardsport | Duke Energy Indiana, LLC | Edwardsport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 TWh | May 2013 | Sep 2025 | Natural Gas : 52.4% Coal-Derived Synthesis Gas : 40.0% Bituminous Coal : 7.5% |
| Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 22.5 GWh | Sep 2010 | Dec 2024 | Landfill Gas |
| Elkhart | Indiana Michigan Power Co | Elkhart, IN | PJM Interconnection, LLC (PJM) | 13.0 GWh | Dec 1912 | Dec 2024 | Water |
| Ellettsville Solar RES | Hoosier Energy R E C, Inc | Ellettsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Sep 2016 | Dec 2024 | Solar |
| Wildcat Wind Farm I, LLC | Big Sky Wind, LLC | Elwood, IN | PJM Interconnection, LLC (PJM) | 673.8 GWh | Nov 2012 | Dec 2024 | Wind |
| Volkman Road Solar Array Hybrid | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Oct 2018 | Dec 2024 | Solar |
| Oak Hill Solar Array | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Oct 2018 | Dec 2024 | Solar |
| Bos Dairy, LLC | Bos Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Dec 2004 | Dec 2024 | Natural Gas |
| Herrema Dairy | Herrema Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Mar 2022 | Dec 2024 | Natural Gas |
| Fairbanks Solar Project | Fairbanks Solar Energy Center LLC | Fairbanks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 277.0 GWh | - | Sep 2025 | Solar |
| Markland | Duke Energy Indiana, LLC | Florence, IN | Midcontinent Independent System Operator, Inc. (MISO) | 298.8 GWh | Dec 1966 | Dec 2024 | Water |
| Fowler Ridge Wind Farm LLC | AE Power Services LLC | Fowler, IN | PJM Interconnection, LLC (PJM) | 1.5 TWh | Jan 2009 | Sep 2025 | Wind |
| Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 430.4 GWh | Dec 2015 | Sep 2025 | Wind |
| Hardy Hills Solar Energy LLC | Hardy Hills Solar LLC | Frankfort, IN | Midcontinent Independent System Operator, Inc. (MISO) | 362.2 GWh | Feb 2024 | Sep 2025 | Solar |
| IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jun 2014 | Dec 2024 | Solar |
| Auburn Renewables LLC | Auburn Renewables, LLC | Garrett, IN | PJM Interconnection, LLC (PJM) | 9.5 GWh | Aug 2022 | Dec 2024 | Solar |
| Gary Works | United States Steel-Gary | Gary, IN | Midcontinent Independent System Operator, Inc. (MISO) | 783.8 GWh | Mar 1997 | Sep 2025 | Blast Furnace Gas : 51.3% Natural Gas : 48.6% |
| Gas City 2 | Indiana Municipal Power Agency | Gas City, IN | PJM Interconnection, LLC (PJM) | 3.3 GWh | Dec 2022 | Dec 2024 | Solar |
| Gas City Solar Park | Indiana Municipal Power Agency | Gas City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | May 2020 | Dec 2024 | Solar |
| Hoosier Wind Project LLC | AES Indiana | Goodland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.8 GWh | Oct 2009 | Dec 2023 | Wind |
| Green Cow Power | Green Cow Power LLC | Goshen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.5 GWh | Mar 2015 | Dec 2024 | Other Biomass Gas |
| St. Joseph Solar | Indiana Michigan Power Co | Granger, IN | PJM Interconnection, LLC (PJM) | 37.8 GWh | Feb 2021 | Dec 2024 | Solar |
| Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Decatur Co. Solar RES (IN) | Hoosier Energy R E C, Inc | Greensburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 GWh | Aug 2017 | Dec 2024 | Solar |
| Hurricane Creek Lift Station | Johnson County Rural E M C | Greenwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 143.0 MWh | Aug 2004 | Dec 2024 | Distillate Fuel Oil |
| Griffith | Altus Power America Management, LLC | Griffith, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Feb 2013 | Dec 2024 | Solar |
| Hobart Solar, LLC | AES Distributed Energy | Hobart, IN | Midcontinent Independent System Operator, Inc. (MISO) | 215.0 MWh | Oct 2012 | Nov 2024 | Solar |
| IMPA Huntingburg Solar Park | Indiana Municipal Power Agency | Huntingburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Aug 2016 | Dec 2024 | Solar |
| Indy Solar II, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.5 GWh | Nov 2013 | Sep 2025 | Solar |
| Rockville Solar I LLC | Greenbacker Renewable Energy Corporation | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Mar 2014 | Dec 2024 | Solar |
| Maywood Photovoltaic Project | ENI New Energy US Inc | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.5 GWh | Feb 2014 | Dec 2024 | Solar |
| Lenape II | Lenape Solar II, LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Oct 2015 | Dec 2024 | Solar |
| Indianapolis Motor Speedway Solar PV | Boralex US Operations LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.7 GWh | May 2014 | Dec 2024 | Solar |
| Duke Building 98 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2014 | Dec 2024 | Solar |
| Indy Solar I, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 16.0 GWh | Nov 2013 | Sep 2025 | Solar |
| Georgetown | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 466.1 GWh | May 2000 | Dec 2024 | Natural Gas |
| IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.7 GWh | Oct 2013 | Dec 2024 | Solar |
| M. G. Emmett J. Bean Federal Center | U.S. General Services Administration | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 519.0 MWh | Mar 2011 | Dec 2024 | Solar |
| Indy Solar III, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.4 GWh | Nov 2013 | Sep 2025 | Solar |
| Duke Building 129 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Nov 2014 | Dec 2024 | Solar |
| Duke Building 87 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2014 | Dec 2024 | Solar |
| CC Perry K | Citizens Thermal Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Dec 1924 | Sep 2025 | Natural Gas |
| Harding Street | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 TWh | May 1958 | Sep 2025 | Natural Gas |
| Indy Grocers | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | May 2015 | Dec 2024 | Solar |
| INDY III | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Jul 2015 | Dec 2024 | Solar |
| IND Solar Farm (Phase IIA) | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 GWh | Nov 2014 | Dec 2024 | Solar |
| Marion Solar LNG | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2015 | Dec 2024 | Solar |
| Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Oct 2015 | Dec 2024 | Solar |
| Rockville Solar II, LLC | Greenbacker Renewable Energy Corporation | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 812.0 MWh | Jul 2014 | Dec 2024 | Solar |
| Jordan Creek Wind Farm, LLC | Jordan Creek Wind Farm, LLC | Judyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 2020 | Sep 2025 | Wind |
| IMPA Knightstown Solar Park | Indiana Municipal Power Agency | Knightstown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Sep 2023 | Dec 2024 | Solar |
| Mammoth North Solar | Mammoth North, LLC | Knox, IN | PJM Interconnection, LLC (PJM) | 693.0 GWh | Oct 2024 | Sep 2025 | Solar |
| Kokomo Solar 1, LLC | NJR Clean Energy Ventures Corporation | Kokomo, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Meadow Lake Wind Farm III LLC | Meadow Lake Wind Farm III LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 269.3 GWh | Aug 2010 | Dec 2024 | Wind |
| Evonik Industries AG | Evonik Degussa Corporation | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 MWh | Apr 1992 | Dec 2024 | Distillate Fuel Oil |
| Caterpillar | Caterpillar Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 23.3 GWh | Nov 1983 | Sep 2025 | Natural Gas |
| Sagamore Plant Cogeneration | Tate & Lyle Ingredients Americas Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.0 GWh | Sep 1984 | Sep 2025 | Natural Gas |
| Primient | Primary Products Ingredients Americas, LLC d/b/a Primient | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 406.0 GWh | May 2021 | Dec 2024 | Natural Gas |
| Meadow Lake Wind Farm LLC | Meadow Lake Wind Farm LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 442.8 GWh | Sep 2009 | Dec 2024 | Wind |
| Meadow Lake Wind Farm IV | Meadow Lake Wind Farm IV LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 200.1 GWh | Sep 2010 | Dec 2024 | Wind |