Directory of Power Plants in Indiana
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| POET Biorefining- Alexandria, LLC | POET Biorefining - Alexandria, LLC. | Alexandria, IN | PJM Interconnection, LLC (PJM) | 18.5 GWh | Mar 2008 | Dec 2025 | Natural Gas |
| IMPA Anderson Solar Park | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 7.5 GWh | Dec 2016 | Dec 2025 | Solar |
| Anderson | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 92.3 GWh | May 1992 | Dec 2025 | Natural Gas : 99.8% |
| Anderson 3 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 16.3 GWh | Nov 2021 | Dec 2025 | Solar |
| Anderson 5 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 5.8 GWh | Jul 2021 | Dec 2025 | Solar |
| Anderson 4 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 14.5 GWh | Jul 2021 | Dec 2025 | Solar |
| Anderson 6 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.3 GWh | May 2022 | Dec 2025 | Solar |
| IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 12.0 GWh | Nov 2017 | Dec 2025 | Solar |
| Zimmerman Energy | Landfill Energy Systems | Argos, IN | Midcontinent Independent System Operator, Inc. (MISO) | 40.6 GWh | Oct 2014 | May 2026 | Landfill Gas |
| Elkhart County Solar Project | Elkhart County Solar Project, LLC | Benton Township, IN | PJM Interconnection, LLC (PJM) | 57.1 GWh | - | May 2026 | Solar |
| Staunton | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Pastime Farm, LLC | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Nov 2015 | Dec 2025 | Solar |
| Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.8 GWh | Oct 2022 | Dec 2025 | Solar |
| ArcelorMittal Burns Harbor | Cleveland-Cliffs Burns Harbor LLC | Burns Harbor, IN | Midcontinent Independent System Operator, Inc. (MISO) | 719.4 GWh | Dec 1968 | Dec 2025 | Blast Furnace Gas : 37.1% Natural Gas : 32.1% Other Gas : 30.8% |
| Vermillion Energy Facility | Duke Energy Ohio Inc | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 422.3 GWh | May 2000 | Dec 2025 | Natural Gas |
| Cayuga | Duke Energy Indiana, LLC | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 TWh | Sep 1970 | May 2026 | Bituminous Coal : 99.3% |
| Centerville Solar Park | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 1.9 GWh | Sep 2020 | Dec 2025 | Solar |
| Richmond | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 45.1 GWh | Apr 1992 | Dec 2025 | Natural Gas : 98.1% Distillate Fuel Oil : 1.9% |
| Indiana Crossroads Wind Farm LLC | Indiana Crossroads Wind Farms LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 903.2 GWh | Nov 2021 | May 2026 | Wind |
| Meadow Lake Wind Farm V LLC | Meadow Lake Wind Farm V LLC | Chalmers, IN | PJM Interconnection, LLC (PJM) | 346.2 GWh | Jun 2017 | May 2026 | Wind |
| Rosewater Wind Farm | Rosewater Wind Farm LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 317.5 GWh | Nov 2020 | May 2026 | Wind |
| Columbia City Solar Park | Indiana Municipal Power Agency | Columbia City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Mar 2021 | Dec 2025 | Solar |
| Jackson Co. Solar RES | Hoosier Energy R E C, Inc | Columbus, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Aug 2017 | Dec 2025 | Solar |
| Crane Solar Facility | Duke Energy Indiana, LLC | Crane, IN | Midcontinent Independent System Operator, Inc. (MISO) | 26.9 GWh | Dec 2016 | Dec 2025 | Solar |
| Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Crawfordsville Solar Park 4 | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | May 2020 | Dec 2025 | Solar |
| Crawfordsville 5 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 16.2 GWh | Aug 2020 | Dec 2025 | Solar |
| IMPA Crawfordsville Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Aug 2015 | Dec 2025 | Solar |
| New Haven Solar RES | Hoosier Energy R E C, Inc | Dale, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 GWh | Aug 2016 | Dec 2025 | Solar |
| Hendricks Regional Health | Hendricks Regional Health | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 19.0 MWh | Aug 1992 | May 2026 | Distillate Fuel Oil |
| C&B Graham Energy, LLC | SolRiver Capital LLC | Danville, IN | PJM Interconnection, LLC (PJM) | 12.1 GWh | Jul 2023 | Dec 2025 | Solar |
| Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | PJM Interconnection, LLC (PJM) | 9.3 GWh | Nov 1950 | Jul 2025 | Natural Gas |
| Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 342.9 GWh | Apr 2008 | Dec 2025 | Wind |
| Indiana Harbor E 5 AC Station | Northlake Energy | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 648.8 GWh | Apr 1996 | Dec 2025 | Blast Furnace Gas : 91.2% Natural Gas : 8.8% |
| Heat Recovery Coke Facility | Cokenergy Inc | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 416.1 GWh | Mar 1998 | May 2026 | Waste Heat |
| Expander Turbine | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 84.9 GWh | Apr 1981 | May 2026 | Blast Furnace Gas |
| Indiana Harbor West | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.8 GWh | Sep 1939 | Dec 2025 | Natural Gas |
| East Chicago | Altus Power America Management, LLC | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Feb 2013 | Nov 2025 | Solar |
| Camp Atterbury Microgrid Hybrid | Duke Energy Indiana, LLC | Edinburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Oct 2019 | Dec 2025 | Solar |
| Edwardsport | Duke Energy Indiana, LLC | Edwardsport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 TWh | May 2013 | May 2026 | Coal-Derived Synthesis Gas : 49.4% Natural Gas : 40.8% Bituminous Coal : 9.8% |
| Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 20.8 GWh | Sep 2010 | Dec 2025 | Landfill Gas |
| Elkhart | Indiana Michigan Power Co | Elkhart, IN | PJM Interconnection, LLC (PJM) | 10.8 GWh | Dec 1912 | Dec 2025 | Water |
| Ellettsville Solar RES | Hoosier Energy R E C, Inc | Ellettsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Sep 2016 | Dec 2025 | Solar |
| Wildcat Wind Farm I, LLC | RWE Clean Energy | Elwood, IN | PJM Interconnection, LLC (PJM) | 671.7 GWh | Nov 2012 | Dec 2025 | Wind |
| Oak Hill Solar Array | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Oct 2018 | Dec 2025 | Solar |
| Volkman Road Solar Array Hybrid | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Oct 2018 | Dec 2025 | Solar |
| Bos Dairy, LLC | Bos Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Dec 2004 | Dec 2025 | Natural Gas |
| Herrema Dairy | Herrema Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 GWh | Mar 2022 | Jan 2025 | Natural Gas |
| Fairbanks Solar Project | Fairbanks Solar Energy Center LLC | Fairbanks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 509.7 GWh | Apr 2025 | May 2026 | Solar |
| Markland | Duke Energy Indiana, LLC | Florence, IN | Midcontinent Independent System Operator, Inc. (MISO) | 252.6 GWh | Dec 1966 | Dec 2025 | Water |
| Fowler Ridge Wind Farm LLC | Clearlight Energy Holdings LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 1.5 TWh | Jan 2009 | May 2026 | Wind |
| Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 438.5 GWh | Dec 2015 | May 2026 | Wind |
| Hardy Hills Solar Energy LLC | Hardy Hills Solar LLC | Frankfort, IN | Midcontinent Independent System Operator, Inc. (MISO) | 359.5 GWh | Feb 2024 | May 2026 | Solar |
| IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.1 GWh | Jun 2014 | Dec 2025 | Solar |
| Auburn Renewables LLC | Auburn Renewables, LLC | Garrett, IN | PJM Interconnection, LLC (PJM) | 16.7 GWh | Aug 2022 | Dec 2025 | Solar |
| Gary Works | United States Steel-Gary | Gary, IN | Midcontinent Independent System Operator, Inc. (MISO) | 994.9 GWh | Mar 1997 | May 2026 | Blast Furnace Gas : 57.0% Natural Gas : 43.0% |
| Gas City Solar Park | Indiana Municipal Power Agency | Gas City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | May 2020 | Dec 2025 | Solar |
| Gas City 2 | Indiana Municipal Power Agency | Gas City, IN | PJM Interconnection, LLC (PJM) | 3.6 GWh | Dec 2022 | Dec 2025 | Solar |
| Green Cow Power | Green Cow Power LLC | Goshen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.1 GWh | Mar 2015 | Dec 2025 | Other Biomass Gas |
| St. Joseph Solar | Indiana Michigan Power Co | Granger, IN | PJM Interconnection, LLC (PJM) | 36.9 GWh | Feb 2021 | Dec 2025 | Solar |
| Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.8 GWh | Nov 2017 | Dec 2025 | Solar |
| Decatur Co. Solar RES (IN) | Hoosier Energy R E C, Inc | Greensburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2017 | Dec 2025 | Solar |
| Hurricane Creek Lift Station | Johnson County Rural E M C | Greenwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 143.0 MWh | Aug 2004 | Dec 2024 | Distillate Fuel Oil |
| Griffith | Altus Power America Management, LLC | Griffith, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Feb 2013 | Dec 2025 | Solar |
| Jasper County Solar Project | Biscayne Falls SPV, LLC | Heber, IN | Midcontinent Independent System Operator, Inc. (MISO) | 25.6 GWh | Nov 2025 | May 2026 | Solar |
| Hobart Solar, LLC | AES Distributed Energy | Hobart, IN | Midcontinent Independent System Operator, Inc. (MISO) | 49.0 MWh | Oct 2012 | Dec 2025 | Solar |
| IMPA Huntingburg Solar Park | Indiana Municipal Power Agency | Huntingburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Aug 2016 | Dec 2025 | Solar |
| Georgetown | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 307.0 GWh | May 2000 | Dec 2025 | Natural Gas |
| Duke Building 129 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Nov 2014 | Dec 2025 | Solar |
| Duke Building 98 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Duke Building 87 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Nov 2014 | Dec 2025 | Solar |
| Indy Solar I, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.3 GWh | Nov 2013 | May 2026 | Solar |
| IND Solar Farm (Phase IIA) | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Nov 2014 | Dec 2025 | Solar |
| Marion Solar LNG | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Sep 2015 | Dec 2025 | Solar |
| Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Oct 2015 | Dec 2025 | Solar |
| INDY III | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Jul 2015 | Dec 2025 | Solar |
| Indy Grocers | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | May 2015 | Dec 2025 | Solar |
| Rockville Solar II, LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 912.0 MWh | Jul 2014 | Dec 2025 | Solar |
| Rockville Solar I LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2014 | Dec 2025 | Solar |
| Maywood Photovoltaic Project | ENI New Energy US Inc | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.5 GWh | Feb 2014 | Dec 2024 | Solar |
| Lenape II | Lenape Solar II, LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Oct 2015 | Dec 2025 | Solar |
| Indianapolis Motor Speedway Solar PV | Boralex US Operations LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.7 GWh | May 2014 | Dec 2025 | Solar |
| CC Perry K | Citizens Thermal Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.2 GWh | Dec 1924 | May 2026 | Natural Gas |
| Indy Solar II, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 14.9 GWh | Nov 2013 | May 2026 | Solar |
| M. G. Emmett J. Bean Federal Center | U.S. General Services Administration | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 519.0 MWh | Mar 2011 | Dec 2024 | Solar |
| Indy Solar III, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.3 GWh | Nov 2013 | May 2026 | Solar |
| IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.5 GWh | Oct 2013 | Dec 2025 | Solar |
| Harding Street | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 TWh | May 1958 | May 2026 | Natural Gas |
| Jordan Creek Wind Farm, LLC | Jordan Creek Wind Farm, LLC | Judyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 2020 | May 2026 | Wind |
| IMPA Knightstown Solar Park | Indiana Municipal Power Agency | Knightstown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Sep 2023 | Dec 2025 | Solar |
| Mammoth North Solar | Mammoth North, LLC | Knox, IN | PJM Interconnection, LLC (PJM) | 754.5 GWh | Oct 2024 | May 2026 | Solar |
| Kokomo Solar 1, LLC | NJR Clean Energy Ventures Corporation | Kokomo, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Evonik Industries AG | Evonik Degussa Corporation | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 MWh | Apr 1992 | Dec 2024 | Distillate Fuel Oil |
| Caterpillar | Caterpillar Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 19.2 GWh | Nov 1983 | May 2026 | Natural Gas |
| Meadow Lake Wind Farm LLC | Meadow Lake Wind Farm LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 431.7 GWh | Sep 2009 | Dec 2025 | Wind |
| Primient | Primary Products Ingredients Americas, LLC d/b/a Primient | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 408.0 GWh | May 2021 | Dec 2025 | Natural Gas |
| Meadow Lake Wind Farm II LLC | Meadow Lake Wind Farm II LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 237.7 GWh | Jul 2010 | Dec 2025 | Wind |
| Sagamore Plant Cogeneration | Tate & Lyle Ingredients Americas Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 19.8 GWh | Sep 1984 | May 2026 | Natural Gas |
| Meadow Lake Wind Farm IV | Meadow Lake Wind Farm IV LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 103.5 GWh | Sep 2010 | Dec 2025 | Wind |