Directory of Power Plants in Illinois
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Square Barn Solar | Forefront Power, LLC | Algonquin, IL | PJM Interconnection, LLC (PJM) | 2.3 GWh | Jul 2020 | Dec 2024 | Solar |
| Alsey | Prairie Power, Inc | Alsey, IL | Midcontinent Independent System Operator, Inc. (MISO) | 38.7 GWh | May 1999 | Dec 2024 | Natural Gas |
| Altamont | City of Altamont - (IL) | Altamont, IL | Midcontinent Independent System Operator, Inc. (MISO) | 56.0 MWh | Dec 2001 | Dec 2024 | Distillate Fuel Oil |
| Apple Canyon Lake Solar | ACM Solar, LLC. | Apple River, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Northwest Community Hospital | Northwest Community Hospital | Arlington Heights, IL | PJM Interconnection, LLC (PJM) | 492.0 MWh | May 1996 | Dec 2024 | Natural Gas |
| Prairie Wolf Solar LLC | National Grid Renewables | Ashmore Township, IL | Midcontinent Independent System Operator, Inc. (MISO) | 382.8 GWh | Oct 2021 | Sep 2025 | Solar |
| The GSI Group LLC at Assumption | Luminace Solar Illinois 2, LLC | Assumption, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Dec 2020 | Dec 2024 | Solar |
| Aurora | Aurora Generation LLC | Aurora, IL | PJM Interconnection, LLC (PJM) | 459.7 GWh | Apr 2001 | Sep 2025 | Natural Gas |
| SV CSG Baileyville 2 LLC | SV CSG Baileyville 2 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Aug 2023 | Dec 2024 | Solar |
| SV CSG Baileyville 1 LLC | SV CSG Baileyville 1 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Aug 2023 | Dec 2024 | Solar |
| Baldwin Energy Complex | Dynegy Midwest Generation Inc | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 TWh | Jun 1970 | Sep 2025 | Subbituminous Coal : 99.8% |
| Baldwin Solar BESS | Vistra Corp | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 121.4 GWh | Nov 2024 | Sep 2025 | Solar |
| Settlers Hill Gas Recovery | WM Illinois Renewable Energy LLC | Batavia, IL | PJM Interconnection, LLC (PJM) | 21.5 GWh | Sep 1988 | Dec 2024 | Landfill Gas |
| Cass County Renewable Energy Center | Union Electric Co - (MO) | Beardstown, IL | Midcontinent Independent System Operator, Inc. (MISO) | 281.2 GWh | Nov 2024 | Sep 2025 | Solar |
| Ingredion Incorporated | Ingredion Inc - Illinois | Bedford Park, IL | PJM Interconnection, LLC (PJM) | 219.6 GWh | Apr 1991 | Dec 2024 | Natural Gas |
| FedEx Chicago Solar Facility | DG Illinois Solar, LLC | Bedford Park, IL | PJM Interconnection, LLC (PJM) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
| Holland Energy Facility | NAES Corporation - (WA) | Beecher City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Aug 2002 | Sep 2025 | Natural Gas |
| Goodenow Road West Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 48.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Beecher Gas Recovery | Will County Energy LLC | Beecher, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | May 2006 | Dec 2024 | Landfill Gas |
| CED Beecher Sun Solar | Bay4 Energy Services, LLC | Beecher, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Apr 2021 | Dec 2024 | Solar |
| Cottage Grove South Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 43.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Cottage Grove North Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 60.0 MWh | Nov 2024 | Dec 2024 | Solar |
| AES Belleville Solar LLC | AES Distributed Energy | Belleville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 12.9 GWh | Aug 2021 | Nov 2024 | Solar |
| McDonough Solar 1, LLC CSG | McDonough Solar 1, LLC | Blandinsville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Breezewood | Cypress Creek Renewables | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 732.0 MWh | Aug 2024 | Dec 2024 | Solar |
| State Farm | State Farm Insurance | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 26.0 MWh | Sep 1996 | Sep 2025 | Distillate Fuel Oil |
| Marlow Solar, LLC CSG | Marlow Solar, LLC | Bluford, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Nov 2020 | Dec 2024 | Solar |
| USS Goodrich Solar | Standard Solar | Bonfield, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Jul 2022 | Dec 2024 | Solar |
| Kankakee Solar 1 | Pivot Energy | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Kankakee 2 | Kankakee Solar 2 LLC | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Jul 2022 | Dec 2024 | Solar |
| Bourbonnais | Solar DG IL 5, LLC | Bourbonnais, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Braidwood Generation Station | Constellation Nuclear | Braceville, IL | PJM Interconnection, LLC (PJM) | 20.2 TWh | Jun 1988 | Sep 2025 | Nuclear |
| CSL Behring LLC | CSL Behring LLC | Bradley, IL | PJM Interconnection, LLC (PJM) | 9.1 GWh | Apr 1993 | Dec 2024 | Natural Gas |
| Keeversville Solar CSG | Keeversville Solar Energy Center LLC | Braidwood, IL | PJM Interconnection, LLC (PJM) | 3.3 GWh | Jun 2021 | Dec 2024 | Solar |
| Breese | City of Breese - (IL) | Breese, IL | Midcontinent Independent System Operator, Inc. (MISO) | 263.0 MWh | Nov 1953 | Dec 2024 | Distillate Fuel Oil |
| Mulligan Solar, LLC | Mulligan Solar | Broadwell, IL | Midcontinent Independent System Operator, Inc. (MISO) | 157.1 GWh | Jun 2022 | Sep 2025 | Solar |
| French Road Solar II | French Road Solar II, LLC | Burlington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Feb 2022 | Dec 2024 | Solar |
| Bushnell | City of Bushnell - (IL) | Bushnell, IL | Midcontinent Independent System Operator, Inc. (MISO) | 49.0 MWh | May 1940 | Dec 2024 | Distillate Fuel Oil |
| Byron Generating Station | Constellation Nuclear | Byron, IL | PJM Interconnection, LLC (PJM) | 19.8 TWh | Aug 1985 | Sep 2025 | Nuclear |
| Kelly Creek Wind Project | EDF Renewable Asset Holdings, Inc. | Cabery, IL | PJM Interconnection, LLC (PJM) | 638.3 GWh | Nov 2016 | Sep 2025 | Wind |
| CID Gas Recovery | WM Illinois Renewable Energy LLC | Calumet City, IL | PJM Interconnection, LLC (PJM) | 14.6 GWh | Feb 1989 | Dec 2024 | Landfill Gas |
| Bishop Hill II Wind Farm | Bishop Hill Energy II, LLC | Cambridge, IL | Midcontinent Independent System Operator, Inc. (MISO) | 339.9 GWh | Sep 2012 | Dec 2024 | Wind |
| Bishop Hill Energy LLC | SunEdison LLC | Cambridge, IL | PJM Interconnection, LLC (PJM) | 591.6 GWh | May 2012 | Dec 2024 | Wind |
| Bishop Hill III | Invenergy Services LLC | Cambridge, IL | Midcontinent Independent System Operator, Inc. (MISO) | 431.9 GWh | May 2018 | Sep 2025 | Wind |
| SIUC | Southern Illinois University Carbondale | Carbondale, IL | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | May 1998 | Sep 2025 | Bituminous Coal |
| White Oak Energy LLC | White Oak Energy LLC | Carlock, IL | Midcontinent Independent System Operator, Inc. (MISO) | 376.2 GWh | May 2011 | Dec 2024 | Wind |
| Clinton Solar 4 LLC CSG | Clinton Solar 4 LLC | Carlyle, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Sep 2020 | Dec 2024 | Solar |
| Carlyle | City of Carlyle - (IL) | Carlyle, IL | Midcontinent Independent System Operator, Inc. (MISO) | 231.0 MWh | Jul 1964 | Dec 2024 | Distillate Fuel Oil |
| Boomtown Renewable Energy Center | Union Electric Co - (MO) | Carmi, IL | Midcontinent Independent System Operator, Inc. (MISO) | 250.1 GWh | Nov 2024 | Sep 2025 | Solar |
| Carmi | City of Carmi - (IL) | Carmi, IL | Midcontinent Independent System Operator, Inc. (MISO) | 230.0 MWh | Nov 1948 | Dec 2024 | Distillate Fuel Oil |
| Hurricane Creek CSG | SPG IL Hurricane Creek Solar LLC | Carterville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | May 2021 | Dec 2024 | Solar |
| John A Logan College Solar | REA Investments, LLC | Carterville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Casey City of | City of Casey - (IL) | Casey, IL | Midcontinent Independent System Operator, Inc. (MISO) | 61.0 MWh | Apr 2002 | Dec 2024 | Distillate Fuel Oil |
| Sandoval | Sandoval Holdco, LLC | Centralia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Feb 2021 | Dec 2024 | Solar |
| Clinton Solar 2b | Pivot Energy | Centralia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 81.0 MWh | Oct 2024 | Dec 2024 | Solar |
| University of Illinois Abbott Power Plt | University of Illinois | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 211.1 GWh | Oct 1940 | Dec 2024 | Natural Gas : 97.4% Bituminous Coal : 2.6% |
| SCS COUNTY 012631 Champaign, LLC | Arevon Energy, Inc. | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Aug 2021 | Dec 2024 | Solar |
| Northern Cardinal Solar SCS IL 1, LLC | Arevon Energy, Inc. | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 16.7 GWh | Jan 2021 | Dec 2024 | Solar |
| Phoenix Solar South Farms LLC Solar Farm | Phoenix Solar South Farms LLC | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Nov 2015 | Sep 2025 | Solar |
| TAC-Distributed Energy Resource Hybrid | Ameren Illinois | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 307.0 MWh | Feb 2017 | Dec 2024 | Solar : 63.8% Wind : 36.2% |
| CED Champaign Solar LLC | Consolidated Edison Development Inc. | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jun 2020 | Dec 2024 | Solar |
| ExxonMobil Oil Joliet Refinery | ExxonMobil Oil Corp | Channahon, IL | PJM Interconnection, LLC (PJM) | 186.1 GWh | Apr 1986 | Sep 2025 | Other Gas |
| Wolf Run Solar | Wolf Run Solar LLC | Chapin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 309.3 GWh | Oct 2024 | Sep 2025 | Solar |
| Blooming Grove Wind Energy Center | Invenergy Services LLC | Chenoa, IL | PJM Interconnection, LLC (PJM) | 876.9 GWh | Nov 2020 | Sep 2025 | Wind |
| Bright Stalk Wind Farm I | Lexington Chenoa Wind Farm LLC | Chenoa, IL | PJM Interconnection, LLC (PJM) | 729.8 GWh | Nov 2019 | Sep 2025 | Wind |
| Kish CSG | Kish Solar, LLC | Cherry Valley, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Jul 2021 | Dec 2024 | Solar |
| North Cottage Grove Solar 1, LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 1.4 GWh | Oct 2024 | Dec 2024 | Solar |
| Torrence Ave Solar 1 LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Oct 2024 | Dec 2024 | Solar |
| ESIL-PFCHICAGO 2, LLC | Madison Energy Holdings LLC | Chicago, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Oct 2020 | Dec 2024 | Solar |
| Chicago West Side Energy Center | Energy Systems Group LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 15.2 GWh | Sep 2003 | Dec 2024 | Natural Gas |
| Exelon Solar Chicago | Luminace Solar Chicago, LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 13.0 GWh | Nov 2009 | Sep 2025 | Solar |
| Northeastern Illinois University Cogen | Northeastern Illinois University | Chicago, IL | PJM Interconnection, LLC (PJM) | 11.8 MWh | Jul 1995 | Dec 2024 | Natural Gas |
| ESIL-PFCHICAGO 3, LLC | Madison Energy Holdings LLC | Chicago, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Jul 2020 | Dec 2024 | Solar |
| Calumet Energy Team LLC | IPA Operations Inc - Calumet | Chicago, IL | PJM Interconnection, LLC (PJM) | 5.8 GWh | May 2002 | Aug 2024 | Natural Gas |
| Presence Saint Mary of Nazareth Hospital | Presence Health | Chicago, IL | PJM Interconnection, LLC (PJM) | 21.0 MWh | Jul 1993 | Dec 2024 | Distillate Fuel Oil : 58.8% Natural Gas : 41.2% |
| Museum of Science and Industry | Museum of Science and Industry | Chicago, IL | PJM Interconnection, LLC (PJM) | 34.3 MWh | Mar 2003 | Dec 2024 | Natural Gas |
| University of Illinois Cogen Facility | University of Illinois | Chicago, IL | PJM Interconnection, LLC (PJM) | 112.3 GWh | Mar 1993 | Sep 2025 | Natural Gas : 99.9% |
| Clinton LFGTE | Wabash Valley Power Assn, Inc | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 17.7 GWh | Jan 2006 | Sep 2025 | Landfill Gas |
| Clinton Power Station | Constellation Nuclear | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 TWh | Oct 1987 | Sep 2025 | Nuclear |
| Alta Farms II Wind Project, LLC | Alta Farms II Wind Project, LLC | Clinton, IL | PJM Interconnection, LLC (PJM) | 551.3 GWh | Apr 2023 | Sep 2025 | Wind |
| Coffeen Solar BESS | Vistra Corp | Coffeen, IL | Midcontinent Independent System Operator, Inc. (MISO) | 73.9 GWh | Nov 2024 | Sep 2025 | Solar |
| Shady Oaks Wind Farm | Algonquin Power Co | Compton, IL | PJM Interconnection, LLC (PJM) | 326.4 GWh | Apr 2012 | Dec 2024 | Wind |
| Shady Oaks Wind 2 | Shady Oaks Wind 2, LLC | Compton, IL | PJM Interconnection, LLC (PJM) | 338.1 GWh | Sep 2023 | Sep 2025 | Wind |
| Quad Cities Generating Station | Constellation Nuclear | Cordova, IL | PJM Interconnection, LLC (PJM) | 15.2 TWh | Nov 1972 | Sep 2025 | Nuclear |
| Cordova Energy | Cordova Energy Co LLC | Cordova, IL | PJM Interconnection, LLC (PJM) | 1.2 TWh | May 2001 | Dec 2024 | Natural Gas |
| Cortland | Cortland Solar 2 LLC | Cortland, IL | PJM Interconnection, LLC (PJM) | 4.3 GWh | Apr 2021 | Dec 2024 | Solar |
| Crete Energy Venture LLC | Crete Energy Venture LLC | Crete, IL | PJM Interconnection, LLC (PJM) | 56.5 GWh | Apr 2002 | Nov 2024 | Natural Gas |
| Woodlawn CSG | Woodlawn Solar, LLC | Crete, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | May 2021 | Dec 2024 | Solar |
| Woodlawn II (CSG) | Woodlawn Solar II, LLC | Crete, IL | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2021 | Dec 2024 | Solar |
| Dakota Solar 1, LLC | Generate Capital | Dakota, IL | PJM Interconnection, LLC (PJM) | 933.0 MWh | Jul 2024 | Dec 2024 | Solar |
| SCS West Fairchild 011958 Danville, LLC | Arevon Energy, Inc. | Danville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Jun 2021 | Dec 2024 | Solar |
| Vermilion Solar 1, LLC CSG | Vermilion Solar 1, LLC | Danville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Primient Decatur Plant Cogen | Primary Products Ingredients Americas, LLC | Decatur, IL | Midcontinent Independent System Operator, Inc. (MISO) | 254.0 GWh | Dec 1988 | Dec 2024 | Natural Gas |
| Archer Daniels Midland Decatur | Archer Daniels Midland Co | Decatur, IL | Midcontinent Independent System Operator, Inc. (MISO) | 880.7 GWh | Mar 1987 | Sep 2025 | Bituminous Coal : 62.4% Subbituminous Coal : 37.4% |
| Green River Wind Farm | Green River Wind Farm Phase 1, LLC | Deer Grove, IL | PJM Interconnection, LLC (PJM) | 514.8 GWh | Oct 2019 | Sep 2025 | Wind |
| SV CSG South Dekalb 1 LLC | SV CSG South Dekalb 1 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Sep 2023 | Dec 2024 | Solar |
| SV CSG South Dekalb 2 LLC | SV CSG South Dekalb 2 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Sep 2023 | Dec 2024 | Solar |
| Whiskey Acres | Solar DG IL 4, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Apr 2024 | Dec 2024 | Solar |
| Wolfcastle | Wolfcastle Solar, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Sep 2021 | Dec 2024 | Solar |
| Prosperity Wind | Prosperity Wind, LLC | Deland, IL | Midcontinent Independent System Operator, Inc. (MISO) | 383.9 GWh | - | Sep 2025 | Wind |