IL Bedford Park 6901 W 65th St
6901 W 65th St, Bedford Park, IL 60638Plant Summary Information
IL Bedford Park 6901 W 65th St is ranked #308 out of 309 solar farms in Illinois in terms of total annual net electricity generation.
IL Bedford Park 6901 W 65th St generated 6.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | IL Bedford Park 6901 W 65th St |
|---|---|
| Utility Name | Catalyze Bedford Park 6901 W 65th Street Microgrid, LLC |
| Location | Cook County, IL |
| Initial Operation Date | December 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 6.0 MWh |
| Annual Consumption | 20 MMBtu |
| Ranked #13,034 out of 13,081 Power Plants Nationwide | |
| Ranked #7,006 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #478 out of 483 Illinois Power Plants | |
| Ranked #308 out of 309 Illinois Solar Power Plants | |
| Fuel Types | Solar |
Map of IL Bedford Park 6901 W 65th St
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for IL Bedford Park 6901 W 65th St.
Monthly Net Generation for IL Bedford Park 6901 W 65th St
Monthly Plant Fuel Consumption for IL Bedford Park 6901 W 65th St
IL Bedford Park 6901 W 65th St Details
| Summary Information | |
|---|---|
| Plant Name | IL Bedford Park 6901 W 65th St (68544) |
| Plant Address | 6901 W 65th St, Bedford Park, IL 60638 |
| Utility | Catalyze Bedford Park 6901 W 65th Street Microgrid, LLC (66921) |
| Latitude, Longitude | 41.7727, -87.79431 |
| Generation Dates on File | Dec 2025 to Dec 2025 |
| Initial Operation Date | December 2025 |
| Annual Generation | 6.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF25-140 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
| Grid Voltage | 12.50 kV |
| Energy Storage | No |
Generator 19574 Details Operating December 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 5 |
| DC Net Capacity | 2.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
IL Bedford Park 6901 W 65th St Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6995 | Enterprise MN - Ferche CSG | Paynesville, MN | 35.0 MWh |
| #6996 | Enterprise MN - Buscho CSG | Owatonna, MN | 26.0 MWh |
| #6997 | Metro Support Services Center Solar | Los Angeles, CA | 25.0 MWh |
| #6998 | Framingham State University Plant | Framingham, MA | 38.0 MWh |
| #6999 | 376 Nash | New Bedford, MA | 17.0 MWh |
| #7000 | Holtsville Coast Solar Project | Holtsville, NY | 17.0 MWh |
| #7001 | Improvement Dst No. 4 | Bakersfield, CA | 12.0 MWh |
| #7002 | Oak Leaf Solar XVI Community Solar | Pittsfield, MA | 10.0 MWh |
| #7003 | Clinton Schools | Clinton, IA | 9.0 MWh |
| #7004 | Meltwater | Manlius, NY | 7.0 MWh |
| #7005 | Towanda | Shirley, IL | 7.0 MWh |
| #7007 | Adams Road Solar | Franksville, WI | 6.0 MWh |
| #7008 | Mount Olive Solar 3 LLC | Mount Olive, NJ | 6.0 MWh |
| #7009 | Stanley Black & Decker | East Longmeadow, MA | 6.0 MWh |
| #7010 | Rantoul Solar | Rantoul, IL | 5.0 MWh |
| #7011 | Prairie Solar (VA) | Windsor, VA | 3.0 MWh |
| #7012 | Sikorsky Aircraft CHP | Stratford, CT | 65.3 GWh |
| #7013 | KE73 CSG | Dover, DE | 1.0 MWh |
| #7014 | Grass River | Canton, NY | 1.0 MWh |
| #7015 | Lake Hallie | Chippewa Falls, WI | 1.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding IL Bedford Park 6901 W 65th St.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 10601 Seymour Ave East 2 CSG | Franklin Park, IL | 39.0 MWh | 13.2 mi |
| Albertsons at Melrose Park | Melrose Park, IL | 3.0 GWh | 10.5 mi |
| Argonne National Laboratory CHP | Lemont, IL | 40.3 GWh | 9.9 mi |
| Chicago West Side Energy Center | Chicago, IL | 17.4 GWh | 9 mi |
| ESIL-PFCHICAGO 2, LLC | Chicago, IL | 1.6 GWh | 4.3 mi |
| ESIL-PFCHICAGO 3, LLC | Chicago, IL | 2.0 GWh | 8.3 mi |
| Exelon Solar Chicago | Chicago, IL | 9.9 GWh | 10 mi |
| FedEx Chicago Solar Facility | Bedford Park, IL | 2.0 GWh | 1.3 mi |
| Fisk Street | Chicago, IL | 2.7 GWh | 9 mi |
| Franklin Park 3-SLCHI803 | Franklin Park, IL | 1.3 GWh | 12.5 mi |
| IL BEDFORD PARK 7035 W 65TH ST | BEDFORD PARK, IL | 480.0 MWh | 0.2 mi |
| Ingredion Incorporated | Bedford Park, IL | 219.6 GWh | 1.5 mi |
| Lowe's - 1845 - Chicago Brickyard, IL | Chicago, IL | 1.1 GWh | 10.7 mi |
| Loyola University Health Plant | Maywood, IL | 19.5 GWh | 6.1 mi |
| MPEA Energy Center | Chicago, IL | 4.0 MWh | 10.6 mi |
| Museum of Science and Industry | Chicago, IL | 41.2 MWh | 11 mi |
| Presence Saint Mary of Nazareth Hospital | Chicago, IL | 980.0 kWh | 10.7 mi |
| S-Pulaski Solar | Chicago, IL | 3.6 GWh | 5.5 mi |
| Triton East and West Cogen | River Grove, IL | 910.0 MWh | 10.3 mi |
| University of Illinois Cogen Facility | Chicago, IL | 115.0 GWh | 9.8 mi |