SCH - (2A) 156 Barhydt Rd Glenville
156 Barhydt Rd, Glenville, NY 12302Plant Summary Information
SCH - (2A) 156 Barhydt Rd Glenville is ranked #159 out of 574 solar farms in New York in terms of total annual net electricity generation.
SCH - (2A) 156 Barhydt Rd Glenville generated 919.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | SCH - (2A) 156 Barhydt Rd Glenville |
|---|---|
| Utility Name | Distributed Solar Development, LLC |
| Location | Schenectady County, NY |
| Initial Operation Date | July 2021 |
| Last Update | Dec 2024 |
| Annual Generation | 6.4 GWh |
| Annual Consumption | 23.3 k MMBtu |
| Ranked #7,456 out of 12,539 Power Plants Nationwide | |
| Ranked #2,722 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #447 out of 944 New York Power Plants | |
| Ranked #159 out of 574 New York Solar Power Plants | |
| Fuel Types | Solar |
Map of SCH - (2A) 156 Barhydt Rd Glenville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SCH - (2A) 156 Barhydt Rd Glenville.
Monthly Net Generation for SCH - (2A) 156 Barhydt Rd Glenville
SCH - (2A) 156 Barhydt Rd Glenville Details
| Summary Information | |
|---|---|
| Plant Name | SCH - (2A) 156 Barhydt Rd Glenville (66764) |
| Plant Address | 156 Barhydt Rd, Glenville, NY 12302 |
| Utility | Distributed Solar Development, LLC (64872) |
| Latitude, Longitude | 42.85, -74.05 |
| Generation Dates on File | Jan 2023 to Dec 2024 |
| Initial Operation Date | July 2021 |
| Annual Generation | 6.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 20-1087-000; 20-1087-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
| Grid Voltage | 13.20 kV |
| Energy Storage | Yes |
Generator 3954 Details Operating July 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Fixed Tilt | Yes |
| Azimuth Angle | 203 |
| Tilt Angle | 16 |
| DC Net Capacity | 7.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 7.6 MW |
Generator 3954B Details Operating July 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 2.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 10 |
|---|---|
| Maximum Charge Rate | 2.5 MW |
| Maximum Discharge Rate | 2.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 1.2 |
| Storage Enclosure Type | CS |
| Co Located Renewable Firming | Yes |
| Excess Wind And Solar Generation | P |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 66764 |
| Direct Support Gen Id | 3954 |
| Support T D Asset | Yes |
SCH - (2A) 156 Barhydt Rd Glenville Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2712 | Syncarpha Westminster Hybrid CSG | Westminster, MA | 6.7 GWh |
| #2713 | Toyota HQ Plan | Plano, TX | 6.7 GWh |
| #2714 | Off Airport Road - West | Accord, NY | 6.7 GWh |
| #2715 | Church Hill | Church Hill, MD | 6.7 GWh |
| #2716 | Maple(CSG) | Bellingham, MA | 6.7 GWh |
| #2717 | Klamath Falls Solar 2 CSG | Klamath Falls, OR | 6.7 GWh |
| #2718 | Central Antelope Dry Ranch B LLC | Lancaster, CA | 6.7 GWh |
| #2719 | Cawelo Water District Solar | Famoso, CA | 6.7 GWh |
| #2720 | AES Daigle Solar, LLC | Fort Kent, ME | 6.7 GWh |
| #2721 | Verde Light Community Solar | Ontario, OR | 6.7 GWh |
| #2723 | The Lawrenceville School Solar Facility | Lawrenceville, NJ | 6.7 GWh |
| #2724 | Barefoot Solar | Fairfiled, ME | 6.7 GWh |
| #2725 | Statesboro Solar LLC | Statesboro, GA | 6.7 GWh |
| #2726 | Happy Solar | Four Oaks, NC | 6.6 GWh |
| #2727 | Chocowinity Solar LLC | Chocowinity, NC | 6.6 GWh |
| #2728 | Chaffey College Rancho Cucamonga Campus | Rancho Cucamonga, CA | 6.6 GWh |
| #2729 | Valencia 3 | Imperial, CA | 6.6 GWh |
| #2730 | Montrose Solar | Montrose, MN | 6.6 GWh |
| #2731 | KDC Solar ASGM | Bridgeton, NJ | 6.6 GWh |
| #2732 | Old Wardour Solar | East Brookfield, MA | 6.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SCH - (2A) 156 Barhydt Rd Glenville.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| (3K) 59 Hetcheltown Rd | Glenville, NY | 1.7 GWh | 7.3 mi |
| Amsterdam North | Amsterdam, NY | 3.4 GWh | 8 mi |
| Amsterdam South | Amsterdam, NY | 3.4 GWh | 7.8 mi |
| Gifford CSG | Schenectady, NY | 2.4 GWh | 2.1 mi |
| Glenville Solar (CSG) | Glenville, NY | 6.9 GWh | 6 mi |
| Guildlerland CSG | Guilderland, NY | 3.1 GWh | 8.8 mi |
| High River Energy Center, LLC | Florida, NY | 173.3 GWh | 5.5 mi |
| Mattas Farms | Amsterdam, NY | 2.9 GWh | 8.9 mi |
| Mohonasen Central School District | Schenectady, NY | 1.6 GWh | 7.4 mi |
| NY8 - Teichos Pattersonville | Pattersonville, NY | 33.7 GWh | 3.1 mi |
| Princetown Solar 1 | Duanesburg, NY | 221.0 MWh | 4.9 mi |
| SCH County - (1B) 10 Alice Wagner Way Ni | Niskayuna, NY | 4.5 GWh | 7.8 mi |
| SCH County - (1E) 398 Anthony St Schenec | Schenectady, NY | 1.3 GWh | 6.8 mi |
| SCH County - (2B) 4982 Rynex Corners Rd | Pattersonville, NY | 3.0 GWh | 2.8 mi |
| SCH County - (2D) 98 Cheltingham Ave Sch | Schenectady, NY | 2.1 GWh | 6.2 mi |
| Sunnyside 1 Solar | Scotia, NY | 7.9 GWh | 5.5 mi |
| Sunnyside 2 Solar | Scotia, NY | 8.2 GWh | 5.5 mi |
| Swaggertown Solar I | Glenville, NY | 122.0 MWh | 5.6 mi |
| Swaggertown Solar II | Glenville, NY | 1.3 GWh | 5.6 mi |
| Washington Avenue Solar, LLC | Glenville, NY | 4.2 GWh | 5.4 mi |