Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Nick Solar | AES Distributed Energy | Liberty, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Jun 2014 | Dec 2024 | Solar |
Owen Solar | Owen Solar LLC | Lincolnton, NC | Duke Energy Carolinas (DUK) | 8.0 GWh | Mar 2016 | Dec 2024 | Solar |
Sophie Solar | Sophie Solar LLC | Mooresboro, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Mar 2016 | Dec 2024 | Solar |
Star Solar | Star Solar LLC | Durham, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Mar 2016 | Dec 2024 | Solar |
Viresco Turtle Lake | Viresco Turtle Lake | Turtle Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Aug 2013 | Dec 2024 | Other Biomass Gas |
North Bay Solar 1 | AES Distributed Energy | Fairfield, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2013 | Dec 2024 | Solar |
Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.8 GWh | Oct 2014 | Dec 2024 | Solar |
Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Apr 2014 | Dec 2024 | Solar |
Rodeo Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Apr 2014 | Dec 2024 | Solar |
Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2024 | Solar |
Summer Solar B2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2014 | Dec 2024 | Solar |
Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2024 | Solar |
Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 1.8 GWh | Jun 2014 | Dec 2024 | Solar |
Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2014 | Dec 2024 | Solar |
Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.5 GWh | Apr 2014 | Dec 2024 | Solar |
Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2024 | Solar |
Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2014 | Dec 2024 | Solar |
Wake Wind Energy Center | Southern Power Co | Floydada, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 883.8 GWh | Sep 2016 | Dec 2024 | Wind |
Marsh Hill Wind Farm | Invenergy Services LLC | Jasper, NY | New York Independent System Operator (NYIS) | 44.7 GWh | Oct 2014 | Dec 2024 | Wind |
Spring Canyon Expansion Wind Energy Ctr | Spring Canyon Expansion LLC | Peetz, CO | Public Service Company of Colorado (PSCO) | 71.9 GWh | Sep 2014 | Dec 2024 | Wind |
Maywood Photovoltaic Project | ENI New Energy US Inc | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.3 GWh | Feb 2014 | Dec 2024 | Solar |
Spinning Spur Wind II | EDF Renewable Asset Holdings, Inc. | Adrian, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 516.4 GWh | Jun 2014 | Dec 2024 | Wind |
Spinning Spur Wind III | Boralex US Operations LLC | Adrian, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 815.8 GWh | Aug 2015 | Dec 2024 | Wind |
Sonne One | Cypress Creek Renewables | Goldsboro, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Dec 2015 | Dec 2024 | Solar |
Brentwood Solar | CD US Solar MT1 LLC | Brentwood, NY | New York Independent System Operator (NYIS) | 687.0 MWh | Oct 2011 | Dec 2024 | Solar |
North County | CD US Solar MT1 LLC | Hauppauge, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Mar 2011 | Dec 2024 | Solar |
Kirkwall Holdings | Cypress Creek Renewables | Warsaw, NC | Duke Energy Carolinas (DUK) | 7.3 GWh | Dec 2015 | Dec 2024 | Solar |
Ayrshire | CD Global Solar Holdings, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 32.4 GWh | Aug 2017 | Dec 2024 | Solar |
Storrie Lake Solar Project | MSM Solar LLC | Las Vegas, NM | Public Service Company of New Mexico (PNM) | 3.0 GWh | Apr 2014 | Dec 2024 | Solar |
Waterloo Solar, LLC | AES Distributed Energy | Waterloo, IN | Midcontinent Independent System Operator, Inc. (MISO) | 592.0 MWh | Dec 2011 | Dec 2024 | Solar |
AC Criminal Courts Complex SPE2, LLC | AES Distributed Energy | Mays Landing, NJ | PJM Interconnection, LLC (PJM) | 496.0 MWh | Nov 2012 | Dec 2024 | Solar |
Pamlico Partners Solar | Pamlico Partners Solar, LLC | Washington, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Nov 2013 | Dec 2024 | Solar |
Kenansville Solar 2, LLC | Cypress Creek Renewables | Kenansville, NC | Duke Energy Carolinas (DUK) | 3.0 GWh | Feb 2016 | Dec 2024 | Solar |
Samarcand Solar Farm, LLC | SRE Utility Solar 1, LLC | Biscoe, NC | Duke Energy Carolinas (DUK) | 7.6 GWh | Nov 2014 | Dec 2024 | Solar |
Albemarle Solar Center LLC | SRE Utility Solar 1, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2014 | Dec 2024 | Solar |
Boseman Solar Center LLC | Cypress Creek Renewables | Rocky Mount, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Nov 2014 | Dec 2024 | Solar |
Flemming Solar Center LLC | Cypress Creek Renewables | Greenville, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2014 | Dec 2024 | Solar |
Littlefield Solar Center LLC | SRE Utility Solar 1, LLC | Ayden, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Nov 2015 | Dec 2024 | Solar |
Rams Horn Solar Center LLC | Cypress Creek Renewables | Greenville, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Nov 2014 | Dec 2024 | Solar |
Beaver Dam | Beaver Dam Energy LLC | Canton Township, PA | PJM Interconnection, LLC (PJM) | 41.5 GWh | May 2016 | Dec 2024 | Natural Gas |
Upchurch Solar Center LLC | Cypress Creek Renewables | Elm City, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2014 | Dec 2024 | Solar |
Alpaca | Alpaca Energy LLC | Canton Township, PA | PJM Interconnection, LLC (PJM) | 32.1 GWh | Mar 2017 | Dec 2024 | Natural Gas |
Shasta Solar Farm | Ignite Solar Holdings LLC | Fall River Mills, CA | California Independent System Operator (CISO) | 6.0 GWh | Feb 2014 | Dec 2024 | Solar |
Milan | Milan Energy LLC | Milan, PA | PJM Interconnection, LLC (PJM) | 38.7 GWh | Feb 2017 | Dec 2024 | Natural Gas |
Millville City Sewer Auth WTP | MN8 Energy LLC | Millville, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Feb 2013 | Dec 2024 | Solar |
Sheldon Solar | Excelsior Energy Capital | Sheldon Springs, VT | ISO New England (ISNE) | 2.7 GWh | Aug 2013 | Dec 2024 | Solar |
Apple One | Cypress Creek Renewables | Newton, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Sep 2015 | Dec 2024 | Solar |
Sonne Two | Heelstone Energy Holdings, LLC | Newton, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2016 | Dec 2024 | Solar |
Cross Winds Energy Park | Consumers Energy Co - (MI) | Unionville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 720.9 GWh | Nov 2014 | Dec 2024 | Wind |
Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 25.1 GWh | Sep 2015 | Dec 2024 | Solar |
Cogenra - TEP | Terraform Arcadia | Tucson, AZ | Tucson Electric Power (TEPC) | 1.9 GWh | Jun 2014 | Dec 2024 | Solar |
Richland Center Renewable Energy LLC | Richland Center Renewable Energy LLC | Richland Center, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Feb 2013 | Dec 2024 | Other Biomass Gas |
Elk Station | Golden Spread Electric Cooperative, Inc | Abernathy, TX | Southwest Power Pool (SWPP) | 1.3 TWh | May 2015 | Dec 2024 | Natural Gas |
Lakeswind Power Partners | Lakeswind Power Partners | Pelican Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 150.9 GWh | Feb 2014 | Dec 2024 | Wind |
Sudbury Landfill | Heliovaas LLC | Sudbury, MA | ISO New England (ISNE) | 1.7 GWh | Nov 2013 | Dec 2024 | Solar |
Gato Montes Solar, LLC | Duke Energy Renewables Services | Tucson, AZ | Tucson Electric Power (TEPC) | 7.4 GWh | Nov 2012 | Dec 2024 | Solar |
Bethel Price Solar, LLC | Duke Energy Renewables Services | Bethel, NC | PJM Interconnection, LLC (PJM) | 6.5 GWh | Nov 2014 | Dec 2024 | Solar |
Dogwood Solar, LLC | Duke Energy Renewables Services | Scotland Neck, NC | PJM Interconnection, LLC (PJM) | 18.4 GWh | Oct 2014 | Dec 2024 | Solar |
Washington Airport Solar LLC | Duke Energy Renewables Services | Washington, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Jan 2014 | Dec 2024 | Solar |
Washington Millfield Solar, LLC | Duke Energy Renewables Services | Bath, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Nov 2013 | Dec 2024 | Solar |
Windsor Cooper HIill Solar, LLC | Duke Energy Renewables Services | Windsor, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Jul 2015 | Dec 2024 | Solar |
Warsaw Farm | Duke Energy Progress - (NC) | Warsaw, NC | Duke Energy Progress East (CPLE) | 93.9 GWh | Nov 2015 | Dec 2024 | Solar |
Castalia Solar | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | May 2014 | Dec 2024 | Solar |
McKenzie Farm | Strata Manager, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2013 | Dec 2024 | Solar |
Nash 58 Farm | Strata Manager, LLC | Nashville, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Oct 2013 | Dec 2024 | Solar |
Nash 64 Farm | Strata Manager, LLC | Spring Hope, NC | Duke Energy Progress East (CPLE) | 7.5 GWh | Jul 2014 | Dec 2024 | Solar |
Pate Farm | Strata Manager, LLC | Red Springs, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Oct 2013 | Dec 2024 | Solar |
Erwin Farm | Strata Manager, LLC | Erwin, NC | Duke Energy Progress East (CPLE) | 7.2 GWh | Aug 2014 | Dec 2024 | Solar |
Sigmon Catawba Farm | Strata Manager, LLC | Newton, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | May 2014 | Dec 2024 | Solar |
Wagstaff Farm 1 | Strata Manager, LLC | Roxboro, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Oct 2013 | Dec 2024 | Solar |
Waco Farm | Strata Manager, LLC | Waco, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Oct 2013 | Dec 2024 | Solar |
Sunfish Farm | Cypress Creek Renewables | Willow Spring, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Nov 2015 | Dec 2024 | Solar |
Reventure Park | Clean Energy LLC | Charlotte, NC | Duke Energy Carolinas (DUK) | 23.6 GWh | Jun 2014 | Dec 2024 | Landfill Gas |
Garrell Solar Farm | Strata Manager, LLC | Chadbourn, NC | Duke Energy Progress East (CPLE) | 7.0 GWh | Oct 2013 | Dec 2024 | Solar |
Angier Farm | Strata Manager, LLC | Angier, NC | Duke Energy Progress East (CPLE) | 7.5 GWh | Nov 2013 | Dec 2024 | Solar |
Bladenboro Farm | Strata Manager, LLC | Bladenboro, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Sep 2013 | Dec 2024 | Solar |
Berkley East Solar LLC | SunEdison LLC | Berkley, MA | ISO New England (ISNE) | 4.7 GWh | Jun 2013 | Dec 2024 | Solar |
Bison 4 Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 624.2 GWh | Dec 2014 | Dec 2024 | Wind |
Stuyvesant Falls | Albany Engineering Corporation | Stuyvesant, NY | New York Independent System Operator (NYIS) | 11.9 GWh | Nov 2012 | Dec 2024 | Water |
Dement Farm LLC | SRE Utility Solar 1, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Jul 2013 | Dec 2024 | Solar |
Kinsley Landfill Solar | Public Service Elec & Gas Co | Sewell, NJ | PJM Interconnection, LLC (PJM) | 11.7 GWh | Dec 2014 | Dec 2024 | Solar |
Duplin Solar LLC | SRE Utility Solar 1, LLC | Warsaw, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Nov 2013 | Dec 2024 | Solar |
North Carolina Solar III LLC | SRE Utility Solar 1, LLC | Gibson, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Nov 2013 | Dec 2024 | Solar |
County College of Morris | Sunlight General Morris Solar LLC | Randolph, NJ | PJM Interconnection, LLC (PJM) | 3.7 GWh | Oct 2013 | Dec 2024 | Solar |
Mercer County Community College | Sunlight General Mercer Solar LLC | West Windsor, NJ | PJM Interconnection, LLC (PJM) | 9.0 GWh | Aug 2013 | Dec 2024 | Solar |
Lundgren Wind Project | MidAmerican Energy Co | Otho, IA | Midcontinent Independent System Operator, Inc. (MISO) | 804.2 GWh | Jul 2014 | Dec 2024 | Wind |
Macksburg Wind Project | MidAmerican Energy Co | Macksburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 329.9 GWh | Nov 2014 | Dec 2024 | Wind |
Wellsburg Wind Project | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 468.7 GWh | Nov 2014 | Dec 2024 | Wind |
Com Adam 1WF-1 | FPC Services Inc. | Sublette, IL | PJM Interconnection, LLC (PJM) | 7.2 GWh | Sep 2007 | Dec 2024 | Wind |
ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2024 | Solar |
Big Turtle Wind Farm, LLC | DTE Sustainable Generation | Harbor Beach, MI | Midcontinent Independent System Operator, Inc. (MISO) | 69.9 GWh | Nov 2014 | Dec 2024 | Wind |
Camilla Solar Plant | Axium US Solar Holdings LLC | Pelham, GA | Southern Company Services, Inc. - Trans (SOCO) | 26.2 GWh | Oct 2013 | Dec 2024 | Solar |
Camp Solar Plant | Axium US Solar Holdings LLC | Woodbury, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.9 GWh | Nov 2013 | Dec 2024 | Solar |
Patriots Stadium | Sunlight General Somerset Solar LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.1 GWh | Aug 2013 | Dec 2024 | Solar |
Pilot Hill Wind Farm | EDF Renewable Asset Holdings, Inc. | Herscher, IL | PJM Interconnection, LLC (PJM) | 618.3 GWh | Jul 2015 | Dec 2024 | Wind |
Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2024 | Solar |
Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 11.4 GWh | Nov 2013 | Dec 2024 | Solar |
Beebe 1B | Beebe 1B Renewable Energy, LLC | Ithaca, MI | Midcontinent Independent System Operator, Inc. (MISO) | 127.0 GWh | Nov 2014 | Dec 2024 | Wind |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2013 | Dec 2024 | Solar |
Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2013 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on April 2025 generation numbers.State | Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,243.20 GWh |
Alaska | # 48 | 142 | 476.79 GWh |
Arizona | # 15 | 173 | 7,447.02 GWh |
Arkansas | # 31 | 99 | 3,937.58 GWh |
California | # 4 | 1,664 | 15,684.45 GWh |
Colorado | # 28 | 290 | 4,479.29 GWh |
Connecticut | # 37 | 162 | 2,832.47 GWh |
Delaware | # 49 | 32 | 450.59 GWh |
District of Columbia | # 51 | 16 | 13.07 GWh |
Florida | # 2 | 317 | 20,430.69 GWh |
Georgia | # 6 | 248 | 11,378.75 GWh |
Hawaii | # 46 | 68 | 750.53 GWh |
Idaho | # 44 | 145 | 1,489.98 GWh |
Illinois | # 5 | 358 | 14,828.23 GWh |
Indiana | # 14 | 208 | 7,809.31 GWh |
Iowa | # 19 | 294 | 6,020.16 GWh |
Kansas | # 21 | 180 | 5,162.37 GWh |
Kentucky | # 25 | 57 | 4,785.23 GWh |
Louisiana | # 16 | 83 | 7,414.75 GWh |
Maine | # 45 | 208 | 1,052.11 GWh |
Maryland | # 36 | 196 | 3,016.71 GWh |
Massachusetts | # 43 | 623 | 1,491.61 GWh |
Michigan | # 9 | 269 | 9,486.98 GWh |
Minnesota | # 27 | 765 | 4,502.46 GWh |
Mississippi | # 20 | 56 | 5,727.48 GWh |
Missouri | # 23 | 120 | 5,119.33 GWh |
State | Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,029.46 GWh |
Nebraska | # 38 | 127 | 2,575.70 GWh |
Nevada | # 33 | 110 | 3,434.99 GWh |
New Hampshire | # 42 | 56 | 1,516.23 GWh |
New Jersey | # 22 | 385 | 5,160.42 GWh |
New Mexico | # 32 | 139 | 3,447.34 GWh |
New York | # 8 | 930 | 9,830.59 GWh |
North Carolina | # 10 | 909 | 9,044.94 GWh |
North Dakota | # 35 | 57 | 3,134.93 GWh |
Ohio | # 12 | 197 | 8,321.20 GWh |
Oklahoma | # 18 | 136 | 6,341.82 GWh |
Oregon | # 24 | 272 | 4,888.92 GWh |
Pennsylvania | # 3 | 255 | 17,282.62 GWh |
Rhode Island | # 47 | 97 | 690.36 GWh |
South Carolina | # 11 | 200 | 8,436.34 GWh |
South Dakota | # 41 | 52 | 1,909.63 GWh |
Tennessee | # 26 | 86 | 4,565.37 GWh |
Texas | # 1 | 885 | 43,683.73 GWh |
Utah | # 39 | 122 | 2,192.68 GWh |
Vermont | # 50 | 117 | 200.11 GWh |
Virginia | # 17 | 233 | 6,991.48 GWh |
Washington | # 13 | 134 | 8,268.23 GWh |
West Virginia | # 30 | 39 | 3,969.31 GWh |
Wisconsin | # 29 | 244 | 4,163.43 GWh |
Wyoming | # 34 | 73 | 3,236.34 GWh |