Thomas A Smith Energy Facility
925 Loopers Bridge Road, Dalton, GA 30721Plant Summary Information
Thomas A Smith Energy Facility is ranked #20 out of 2,243 natural gas power plants nationwide in terms of total annual net electricity generation.
Thomas A Smith Energy Facility is comprised of 6 generators and generated 2.6 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Thomas A Smith Energy Facility |
|---|---|
| Utility Name | Oglethorpe Power Corporation |
| Location | Murray County, GA |
| Initial Operation Date | June 2002 |
| Last Update | Sep 2025 |
| Annual Generation | 8.5 TWh |
| Annual Consumption | 67.3 M MMBtu |
| Ranked #85 out of 12,539 Power Plants Nationwide | |
| Ranked #20 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #5 out of 251 Georgia Power Plants | |
| Ranked #2 out of 46 Georgia Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Thomas A Smith Energy Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Thomas A Smith Energy Facility.
Monthly Net Generation for Thomas A Smith Energy Facility
Thomas A Smith Energy Facility Details
| Summary Information | |
|---|---|
| Plant Name | Thomas A Smith Energy Facility (55382) |
| Plant Address | 925 Loopers Bridge Road, Dalton, GA 30721 |
| Utility | Oglethorpe Power Corporation (13994) |
| Latitude, Longitude | 34.7094, -84.9175 |
| Generation Dates on File | Jun 2002 to Sep 2025 |
| Initial Operation Date | June 2002 |
| Annual Generation | 8.5 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 02-28-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | |
| Transmission / Distribution Owner | Georgia Power Co (7140) GA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | EAST TENNESSEE NATURAL GAS LLC |
| Natural Gas Storage | No |
Generator 1GT1 Details Operating June 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | 1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 147 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 182 MW |
| Winter Capacity | 186 MW |
| Minimum Load | 90 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator 1GT2 Details Operating June 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | 1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 147 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 182 MW |
| Winter Capacity | 186 MW |
| Minimum Load | 90 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator 1STG Details Operating June 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | 1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 302 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 305 MW |
| Winter Capacity | 300 MW |
| Minimum Load | 90 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator 2GT1 Details Operating June 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | 2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 147 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 187 MW |
| Winter Capacity | 198 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2GT2 Details Operating June 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | 2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 147 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 187 MW |
| Winter Capacity | 198 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2STG Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | 2 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 302 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 310 MW |
| Winter Capacity | 305 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Thomas A Smith Energy Facility Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #10 | Brunswick County Power Station | Freeman, VA | 10.3 TWh |
| #11 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 10.1 TWh |
| #12 | Midland Cogeneration Venture | Midland, MI | 9.7 TWh |
| #13 | Forney Energy Center | Forney, TX | 9.5 TWh |
| #14 | Fort Myers | Ft. Myers, FL | 9.3 TWh |
| #15 | Warren County | Front Royal, VA | 9.3 TWh |
| #16 | Union Power Station | El Dorado, AR | 9.3 TWh |
| #17 | Lackawanna Energy Center | Jessup, PA | 9.1 TWh |
| #18 | Hanging Rock Energy Facility | Ironton, OH | 9.0 TWh |
| #19 | York Energy Center | Delta, PA | 8.9 TWh |
| #21 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.3 TWh |
| #22 | Blue Water Energy Center | East China, MI | 8.3 TWh |
| #23 | Martin | Indiantown, FL | 8.2 TWh |
| #24 | Sanford | DeBary, FL | 8.1 TWh |
| #25 | McIntosh Combined Cycle Facility | Rincon, GA | 8.1 TWh |
| #26 | CPV Fairview Energy Center | Johnstown, PA | 8.1 TWh |
| #27 | South Field Energy | Wellsville, OH | 8.0 TWh |
| #28 | Deer Park Energy Center | Deer Park, TX | 8.0 TWh |
| #29 | Nine Mile Point | Westwego, LA | 7.9 TWh |
| #30 | Jackson Generation, LLC | Elwood, IL | 7.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Thomas A Smith Energy Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allatoona | Cartersville, GA | 122.5 GWh | 39.2 mi |
| Bartow Davidson | Cartersville, GA | 6.0 GWh | 31.6 mi |
| Blue Ridge | Blue Ridge, GA | 25.6 GWh | 38 mi |
| Bowen | Cartersville, GA | 11.1 TWh | 40.3 mi |
| Carters | Chatsworth, GA | 50.1 GWh | 15.4 mi |
| Chattanooga Metropolitan Airport Solar | Chattanooga, TN | 2.6 GWh | 27.3 mi |
| Chattooga Gore | Menlo, GA | 5.4 GWh | 33.6 mi |
| Chickamauga | Chattanooga, TN | 688.9 GWh | 32.4 mi |
| Dalton 2 | Dalton, GA | 5.9 GWh | 1 mi |
| Gordon Pine Hall | Fairmount, GA | 4.5 GWh | 22.2 mi |
| Gordon Thompson | Fairmount, GA | 4.3 GWh | 22.1 mi |
| Inland Paperboard Packaging Rome | Rome, GA | 384.6 GWh | 39.2 mi |
| Murray Treadwell Farms | Chatsworth, GA | 6.3 GWh | 7.2 mi |
| Nickajack | New Hope, TN | 491.2 GWh | 44.7 mi |
| Ocoee 1 | Benton, TN | 69.2 GWh | 30.7 mi |
| Ocoee 2 | Benton, TN | 86.7 GWh | 35.3 mi |
| Ocoee 3 | Benton, TN | 151.7 GWh | 35.3 mi |
| Sequoyah | Soddy Daisy, TN | 11.9 TWh | 37.1 mi |
| Volkswagen Solar System | Chattanooga, TN | 12.5 GWh | 29.3 mi |
| Whitfield Cooper | Cohutta, GA | 2.0 GWh | 16.9 mi |