Bowen is ranked #3 out of 138 coal plants nationwide in terms of total annual net electricity generation.
Bowen is comprised of 4 generators and generated 3.4 TWh during the 3-month period between November 2023 to February 2024.
Plant Name | Bowen |
---|---|
Utility Name | Georgia Power Co |
Location | Bartow County, GA |
Initial Operation Date | October 1971 |
Last Update | Feb 2024 |
Annual Generation | 11.6 TWh |
Annual Consumption | 114.0 M MMBtu |
Ranked #51 out of 11,455 Power Plants Nationwide | |
Ranked #3 out of 138 Bituminous Coal Power Plants Nationwide | |
Ranked #4 out of 222 Georgia Power Plants | |
Ranked #1 out of 5 Georgia Bituminous Coal Power Plants | |
Fuel Types | Bituminous Coal : 99.9% |
Map of Bowen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bowen.
Monthly Net Generation for Bowen
Bowen Details
Summary Information | |
---|---|
Plant Name | Bowen (703) |
Plant Address | 317 Covered Bridge Road, SW Cartersville, GA 30120 |
Utility | Georgia Power Co (7140) |
Latitude, Longitude | 34.1256, -84.9222 |
Generation Dates on File | Jan 2001 to Feb 2024 |
Initial Operation Date | October 1971 |
Annual Generation | 11.6 TWh |
Fuel Types | Bituminous Coal : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Etowah River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 500.00 kV / 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating October 1971
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 805.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 714 MW |
Winter Capacity | 714 MW |
Minimum Load | 450 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1971 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Supercritical Technology | Yes |
Multiple Fuels | No |
Generator 2 Details Operating September 1972
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 788.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 718 MW |
Winter Capacity | 718 MW |
Minimum Load | 450 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Supercritical Technology | Yes |
Multiple Fuels | No |
Generator 3 Details Operating December 1974
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 952 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 883 MW |
Winter Capacity | 883 MW |
Minimum Load | 550 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1974 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Supercritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 4 Details Operating November 1975
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 952 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 885 MW |
Winter Capacity | 885 MW |
Minimum Load | 550 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1975 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Supercritical Technology | Yes |
Multiple Fuels | No |
Bowen Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Gavin Power, LLC | Cheshire, OH | 13.8 TWh |
#2 | Prairie State Generating Station | Marissa, IL | 13.5 TWh |
#4 | Cardinal | Brillant, OH | 10.9 TWh |
#5 | Ghent | Ghent, KY | 10.7 TWh |
#6 | Cumberland (TN) | Cumberland City, TN | 9.8 TWh |
#7 | John E Amos | St Albans, WV | 9.7 TWh |
#8 | Cross | Cross, SC | 9.0 TWh |
#9 | Gibson | Owensville, IN | 8.7 TWh |
#10 | H L Spurlock | Maysville, KY | 8.4 TWh |
#11 | Mill Creek (KY) | Louisville, KY | 8.3 TWh |
#12 | Trimble County | Bedford, KY | 8.1 TWh |
#13 | Mountaineer | New Haven, WV | 5.7 TWh |
#14 | Clifty Creek | Madison, IN | 5.5 TWh |
#15 | Roxboro | Semora, NC | 5.1 TWh |
#16 | FirstEnergy Fort Martin Power Station | Maidsville, WV | 4.9 TWh |
#17 | W H Zimmer | Moscow, OH | 7.4 TWh |
#18 | Cayuga | Cayuga, IN | 4.7 TWh |
#19 | Kyger Creek | Cheshire, OH | 5.2 TWh |
#20 | AES Petersburg | Petersburg, IN | 4.6 TWh |
#21 | Merom | Sullivan, IN | 4.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bowen.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allatoona | Cartersville, GA | 161.7 GWh | 11.4 mi |
Atlanta Falcons Solar | Atlanta, GA | 1.3 GWh | 39.3 mi |
Carters | Chatsworth, GA | 38.7 GWh | 36.5 mi |
CNN Center | Atlanta, GA | 101.0 MWh | 39.4 mi |
Dalton 2 | Dalton, GA | 10.6 GWh | 40.9 mi |
Emory Decatur Hospital | Decatur, GA | 46.9 MWh | 43.3 mi |
Inland Paperboard Packaging Rome | Rome, GA | 454.0 GWh | 24.8 mi |
Jack McDonough | Smyrna, GA | 19.5 TWh | 33 mi |
Laredo Bus Facility Solar Canopies | Decatur, GA | 128.5 MWh | 44.3 mi |
MAS ASB Cogen Plant | Atlanta, GA | 46.1 GWh | 44.4 mi |
Morgan Falls | Dunwoody, GA | 39.6 GWh | 32.7 mi |
Murray Treadwell Farms | Chatsworth, GA | 6.7 GWh | 44.9 mi |
Polk Cedartown | Cedartown, GA | 4.8 GWh | 21.8 mi |
Rockmart | Rockmart, GA | 304.0 MWh | 9.6 mi |
Sewell Creek Energy | Cedartown, GA | 455.2 GWh | 23.7 mi |
Solar BESS Hybrid | Marietta, GA | 2.5 GWh | 23.3 mi |
Sun Trust Plaza | Atlanta, GA | 40.7 MWh | 39.6 mi |
Tech Square Microgrid | Atlanta, GA | 1.9 GWh | 38.9 mi |
Thomas A Smith Energy Facility | Dalton, GA | 9.3 TWh | 40.3 mi |
Turnipseed Solar, LLC | Douglasville, GA | 5.3 GWh | 32.6 mi |