John Sevier
Hwy 70 S PO Box 2000, Rogersville, TN 37857Plant Summary Information
John Sevier is ranked #6 out of 86 power plants in Tennessee in terms of total annual net electricity generation.
John Sevier is comprised of 4 generators and generated 1.1 TWh during the 3-month period between November 2025 to February 2026.
| Plant Name | John Sevier |
|---|---|
| Utility Name | Tennessee Valley Authority |
| Location | Hawkins County, TN |
| Initial Operation Date | February 1956 |
| Last Update | Feb 2026 |
| Annual Generation | 4.5 TWh |
| Annual Consumption | 34.8 M MMBtu |
| Ranked #250 out of 12,637 Power Plants Nationwide | |
| Ranked #122 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #6 out of 86 Tennessee Power Plants | |
| Ranked #2 out of 15 Tennessee Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of John Sevier
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for John Sevier.
Monthly Net Generation for John Sevier
Monthly Plant Fuel Consumption for John Sevier
John Sevier Details
| Summary Information | |
|---|---|
| Plant Name | John Sevier (3405) |
| Plant Address | Hwy 70 S PO Box 2000, Rogersville, TN 37857 |
| Utility | Tennessee Valley Authority (18642) |
| Latitude, Longitude | 36.3767, -82.9639 |
| Generation Dates on File | Jan 2001 to Feb 2026 |
| Initial Operation Date | February 1956 |
| Annual Generation | 4.5 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Holston River |
| Ash Impoundment | Yes Not Lined Out of Service |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | EAST TENNESSEE NATURAL GAS LLC |
| Natural Gas Storage | No |
Generator CTG1 Details Operating April 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 191.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 165 MW |
| Winter Capacity | 188 MW |
| Minimum Load | 44.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CTG2 Details Operating April 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 191.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 165 MW |
| Winter Capacity | 188 MW |
| Minimum Load | 44.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CTG3 Details Operating April 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 191.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 165 MW |
| Winter Capacity | 188 MW |
| Minimum Load | 44.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG1 Details Operating April 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 423 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 383 MW |
| Winter Capacity | 376 MW |
| Minimum Load | 90.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
John Sevier Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #112 | CPV St Charles Energy Center | Waldorf, MD | 4.8 TWh |
| #113 | John S Rainey | Starr, SC | 4.7 TWh |
| #114 | CPV Valley Energy Center | Wawayanda, NY | 4.7 TWh |
| #115 | Rowan | Salisbury, NC | 4.8 TWh |
| #116 | Oneta Energy Center | Broken Arrow, OK | 4.7 TWh |
| #117 | Morgan Energy Center | Decatur, AL | 4.7 TWh |
| #118 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 4.6 TWh |
| #119 | Port Everglades | Ft. Lauderdale, FL | 4.6 TWh |
| #120 | Fayette Energy Facility | Masontown, PA | 4.5 TWh |
| #121 | Ironwood LLC | Lebanon, PA | 4.5 TWh |
| #123 | Lower Mount Bethel Energy | Bangor, PA | 4.5 TWh |
| #124 | PSEG Linden Generating Station | Linden, NJ | 4.5 TWh |
| #125 | Rio Nogales Power Project | Seguin, TX | 4.4 TWh |
| #126 | Cottonwood Energy Company LP | Deweyville, TX | 4.4 TWh |
| #127 | Allegheny Energy Units 3 4 & 5 | Springdale, PA | 4.3 TWh |
| #128 | Keys Energy Center | Brandywine, MD | 4.3 TWh |
| #129 | West Riverside Energy Center | Beloit, WI | 4.3 TWh |
| #130 | Lowman Energy Center | Leroy, AL | 4.3 TWh |
| #131 | Hill Top Energy Center, LLC | Carmichaels, PA | 4.3 TWh |
| #132 | Ratcliffe | De Kalb, MS | 4.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding John Sevier.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boone Dam | Kingsport, TN | 184.5 GWh | 29.6 mi |
| Bristol Plant | Bristol, VA | 2.3 GWh | 48.2 mi |
| Cherokee Dam | Rudledge, TN | 341.4 GWh | 33 mi |
| Domtar Kingsport Mill | Kingsport, TN | 181.4 GWh | 25.1 mi |
| Douglas Dam | Dandridge, TN | 446.4 GWh | 43 mi |
| Fort Patrick Henry | Kingsport, TN | 103.5 GWh | 26.7 mi |
| Hot Springs Energy Storage & Microgrid | Hot Springs, NC | 2.5 GWh | 34.5 mi |
| Mineral Gap | Wise, VA | 4.9 GWh | 49.2 mi |
| Powell Valley | Kyles Ford, TN | 43.0 MWh | 14.2 mi |
| South Holston | Bristol, TN | 120.8 GWh | 49.6 mi |
| SR Greenville I | Limestone, TN | 10.0 GWh | 15.8 mi |
| SR Greenville II | Greeneville, TN | 9.4 GWh | 17.9 mi |
| SR Jonesborough | Jonesborough, TN | 7.2 GWh | 26.1 mi |
| SR Washington I, LLC | Jonesborough, TN | 19.7 GWh | 20.4 mi |
| SR White Pine, LLC | White Pine, TN | 2.3 GWh | 25 mi |
| Tennessee Eastman Operations | Kingsport, TN | 1.1 TWh | 25.4 mi |
| Virginia City Hybrid Energy Center | St. Paul, VA | 2.1 TWh | 50.9 mi |
| Walters | Waterville, NC | 275.3 GWh | 47.4 mi |
| Watauga | Elizabethton, TN | 154.8 GWh | 46.7 mi |
| Wilbur | Elizabethon, TN | 14.5 GWh | 46.7 mi |