Pyramid is ranked #37 out of 152 power plants in New Mexico in terms of total annual net electricity generation.
Pyramid is comprised of 4 generators and generated 63.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Pyramid |
|---|---|
| Utility Name | Tri-State G & T Assn, Inc |
| Location | Hidalgo County, NM |
| Initial Operation Date | March 2003 |
| Last Update | Dec 2025 |
| Annual Generation | 266.6 GWh |
| Annual Consumption | 3.3 M MMBtu |
| Ranked #2,180 out of 13,081 Power Plants Nationwide | |
| Ranked #677 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #37 out of 152 New Mexico Power Plants | |
| Ranked #10 out of 19 New Mexico Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.9% |
Map of Pyramid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pyramid.
Monthly Net Generation for Pyramid
Monthly Plant Fuel Consumption for Pyramid
Pyramid Details
| Summary Information | |
|---|---|
| Plant Name | Pyramid (7975) |
| Plant Address | 53 Ramos Farms Road, Lordsburg, NM 88045 |
| Utility | Tri-State G & T Assn, Inc (30151) |
| Latitude, Longitude | 32.2363, -108.5494 |
| Generation Dates on File | Jan 2004 to Dec 2025 |
| Initial Operation Date | March 2003 |
| Annual Generation | 266.6 GWh |
| Fuel Types | Natural Gas : 99.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of New Mexico (PNM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | EL PASO NATURAL GAS COMPANY LLC |
| Natural Gas Storage | No |
Generator 1 Details Operating March 2003
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 46.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.5 MW |
| Winter Capacity | 45.6 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2003 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 39.5 MW |
| Net Winter Capacity With Natural Gas | 45.6 MW |
| Net Summer Capacity With Oil | 40 MW |
| Net Winter Capacity With Oil | 45.6 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 2 Details Operating March 2003
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 46.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.5 MW |
| Winter Capacity | 45.6 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2003 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 39.5 MW |
| Net Winter Capacity With Natural Gas | 45.6 MW |
| Net Summer Capacity With Oil | 40 MW |
| Net Winter Capacity With Oil | 45.6 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 4 Details Operating April 2003
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 46.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.5 MW |
| Winter Capacity | 45.6 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2003 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 39.5 MW |
| Net Winter Capacity With Natural Gas | 45.6 MW |
| Net Summer Capacity With Oil | 40 MW |
| Net Winter Capacity With Oil | 45.6 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 3 Details Operating May 2003
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 46.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.5 MW |
| Winter Capacity | 45.6 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2003 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 39.5 MW |
| Net Winter Capacity With Natural Gas | 45.6 MW |
| Net Summer Capacity With Oil | 40 MW |
| Net Winter Capacity With Oil | 45.6 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Pyramid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #667 | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | 361.6 GWh |
| #668 | Stony Brook Cogen Plant | Stony Brook, NY | 284.6 GWh |
| #669 | Woodland | Modesto, CA | 283.1 GWh |
| #670 | Silver Creek | Prentiss, MS | 282.3 GWh |
| #671 | V H Braunig | Elmendorf, TX | 281.9 GWh |
| #672 | Chino Mines | Hurley, NM | 276.8 GWh |
| #673 | Manchief Electric Generating Station | Brush, CO | 276.4 GWh |
| #674 | Dighton Power Plant | Dighton, MA | 275.5 GWh |
| #675 | Henry County | New Castle, IN | 274.9 GWh |
| #676 | Kearny Generating Station | Kearny, NJ | 270.1 GWh |
| #678 | West Point (PA) | West Point, PA | 265.3 GWh |
| #679 | Saguaro Power | Henderson, NV | 264.5 GWh |
| #680 | Perryman | Harford County, MD | 361.2 GWh |
| #681 | T B Simon Power Plant | East Lansing, MI | 262.8 GWh |
| #682 | Dickerson Power | Dickerson, MD | 299.5 GWh |
| #683 | Portside Energy | Portage, IN | 262.4 GWh |
| #684 | Sylvarena | Raleigh, MS | 262.1 GWh |
| #685 | Ames Electric Services Power Plant | Ames, IA | 285.0 GWh |
| #686 | Hardin County Peaking Facility | Kountze, TX | 256.8 GWh |
| #687 | US Borax | Boron, CA | 255.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pyramid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Luna | Deming, NM | 15.8 GWh | 66.2 mi |
| Apache Solar I | Cochise, AZ | 55.4 GWh | 79.3 mi |
| Apache Station | Cochise, AZ | 2.0 TWh | 79.5 mi |
| Chino Mines | Hurley, NM | 276.8 GWh | 40.3 mi |
| Columbus Solar Project | Columbus, NM | 5.2 GWh | 61.8 mi |
| Deming Solar Energy Center | Deming, NM | 20.1 GWh | 47 mi |
| Douglas | Douglas, AZ | 218.0 MWh | 84.3 mi |
| Hatch Solar Energy Center I, LLC | Hatch, NM | 9.8 GWh | 80 mi |
| Lightning Dock Geothermal | Animas, NM | 72.3 GWh | 18 mi |
| Lordsburg Generating | Lordsburg, NM | 65.8 GWh | 11.7 mi |
| Luna Energy Facility | Deming, NM | 1.8 TWh | 45 mi |
| Macho Springs | Deming, NM | 124.2 GWh | 66.5 mi |
| Macho Springs Power I | Deming, NM | 115.3 GWh | 64.5 mi |
| Red Horse 2 | Willcox, AZ | 148.3 GWh | 90 mi |
| Red Horse III | Wilcox, AZ | 55.6 GWh | 88.1 mi |
| Roadrunner Solar and BESS | Cochise, AZ | 219.3 GWh | 81.7 mi |
| Silver City WWTP PV Project | Silver City, NM | 2.0 GWh | 37.4 mi |
| Solar PV Development NM 18 II LLC | Deming, NM | 66.6 GWh | 51.2 mi |
| SR McNeal | McNeal, AZ | 53.8 GWh | 82.3 mi |
| Sulphur Springs | Cochise, AZ | 47.7 GWh | 81 mi |