CMEEC - Polaris Park Solar Hybrid is ranked #16 out of 74 solar farms in Connecticut in terms of total annual net electricity generation.

CMEEC - Polaris Park Solar Hybrid generated 781.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameCMEEC - Polaris Park Solar Hybrid
Utility NameTesla Inc.
LocationSoutheastern Connecticut Planning Region, CT
Initial Operation DateAugust 2017
Last Update Dec 2023
Annual Generation 4.9 GWh
Annual Consumption 17.7 k MMBtu
Ranked #7,966 out of 12,299 Power Plants Nationwide
Ranked #3,089 out of 6,182 Solar Power Plants Nationwide
Ranked #82 out of 158 Connecticut Power Plants
Ranked #16 out of 74 Connecticut Solar Power Plants
Fuel Types Solar

Map of CMEEC - Polaris Park Solar Hybrid

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CMEEC - Polaris Park Solar Hybrid.

Create Your Account Today

Monthly Net Generation for CMEEC - Polaris Park Solar Hybrid

800800600600400400200200002016201620172017201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

CMEEC - Polaris Park Solar Hybrid Details

Summary Information
Plant NameCMEEC - Polaris Park Solar Hybrid (60607)
Plant Address2 Lafayette Drive, Gordon, CT 6340
UtilityTesla Inc. (57313)
Latitude, Longitude41.38126, -72.07689
Generation Dates on FileJan 2018 to Dec 2023
Initial Operation DateAugust 2017
Annual Generation 4.9 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerGroton Dept of Utilities - (CT) (7716) CT
Grid Voltage 1.00 kV
Energy StorageYes

Generator BA1 Details Operating August 2017

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH3.3
Maximum Charge Rate0.8 MW
Maximum Discharge Rate0.8 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating1
Storage Enclosure TypeCS
Load ManagementYes
Backup PowerYes
Excess Wind And Solar GenerationP
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id60607
Direct Support Gen IdPV1
Support T D AssetNo

Generator PV1 Details Operating August 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3.5 MW
Summer Capacity3.5 MW
Winter Capacity3.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle25
DC Net Capacity4.8 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity4.8 MW
Virtual Net Metering AgreementNo

CMEEC - Polaris Park Solar Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3079Gulfport Naval Base CSG PV SystemGulfport, MS5.0 GWh
#3080Ramona Solar EnergyRamona, CA5.0 GWh
#3081Hanford 1 and 2Hanford, CA5.0 GWh
#3082SunE Stolee CSG, LLCKenyon, MN5.0 GWh
#3083TJX PhoenixPhoenix, AZ5.0 GWh
#3084CES Marbletown SolarMarbletown, NY5.0 GWh
#3085SEPV 18Palmdale, CA5.0 GWh
#3086Durham SolarDurham, NC5.0 GWh
#3087Westmont 300ASan Pedro, CA5.0 GWh
#3088USS Giveback Solar LLC (CSG)Pueblo, CO5.0 GWh
#3090Mapleton Community SolarMapleton, MN5.0 GWh
#3091County Road 17 (CSG)Afton, NY5.0 GWh
#3092Pikes Peak Solar Garden 1 LLC CSGColorado Springs, CO5.0 GWh
#3093Tolland Solar NG LLCTolland, MA5.0 GWh
#3094Meadows PV 1Williamston, NC5.0 GWh
#3095Weymouth Solar PlantLa Verne, CA5.0 GWh
#3096SMUD at FleshmanGalt, CA5.0 GWh
#3097Morin Solar 2013 LLCWarren, MA5.0 GWh
#3098Fort Indiantown GapAnnville, PA5.0 GWh
#3099Gala (CSG)Lena, IL4.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding CMEEC - Polaris Park Solar Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Antares-GRE 314 East Lyme LLCEast Lyme, CT3.9 GWh8.5 mi
Bridge Street 1 & 2Groton, CT458.0 MWh1.3 mi
CMEEC - Navy NE TridentGroton, CT1.3 GWh1 mi
Connecticut CollegeNew London, CT9.1 GWh1.4 mi
Covanta Southeastern Connecticut CompanyPreston, CT113.2 GWh6.5 mi
Fishers Island 1Fisher's Island, NY151.0 MWh8.5 mi
Fort Hill 1, 2, 3 & 4Uncasville, CT520.0 MWh6.3 mi
Foxwoods CoGenMashantucket, CT10.8 GWh8.7 mi
Gary Court 1 & 2Groton, CT422.0 MWh4.3 mi
MillstoneWaterford, CT16.5 TWh6.8 mi
Montville StationUncasville, CT27.8 GWh3.5 mi
Naval Sub Base New London Fuel CellGroton, CT34.2 GWh1.4 mi
Norwich WWTPNorwich, CT1.0 MWh10 mi
Pfizer Groton Fuel CellGroton, CT30.1 GWh3.3 mi
Pfizer Groton PlantGroton, CT80.4 GWh3.4 mi
Rand Whitney CHP PlantMontville, CT133.2 GWh5.8 mi
Subase Microgrid ProjectGroton, CT43.1 GWh1.4 mi
Tenth StreetNorwich, CT3.2 GWh11 mi
Water Treatment 1 & 2Groton, CT306.0 MWh3 mi
Yale New Haven - New LondonNew London, CT14.6 GWh3.4 mi