White Rock West Wind Project
TBD, Anadarko, OK 73005Plant Summary Information
White Rock West Wind Project is ranked #48 out of 68 wind farms in Oklahoma in terms of total annual net electricity generation.
White Rock West Wind Project generated 77.5 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | White Rock West Wind Project |
|---|---|
| Utility Name | White Rock Wind West, LLC |
| Location | Caddo County, OK |
| Initial Operation Date | December 2023 |
| Last Update | Oct 2025 |
| Annual Generation | 351.0 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,771 out of 12,553 Power Plants Nationwide | |
| Ranked #523 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #72 out of 134 Oklahoma Power Plants | |
| Ranked #48 out of 68 Oklahoma Wind Power Plants | |
| Fuel Types | Wind |
Map of White Rock West Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for White Rock West Wind Project.
Monthly Net Generation for White Rock West Wind Project
White Rock West Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | White Rock West Wind Project (64340) |
| Plant Address | TBD, Anadarko, OK 73005 |
| Utility | White Rock Wind West, LLC (63960) |
| Latitude, Longitude | 34.96684, -98.25689 |
| Generation Dates on File | Dec 2023 to Oct 2025 |
| Initial Operation Date | December 2023 |
| Annual Generation | 351.0 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Co of Oklahoma (15474) OK |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator WRW Details Operating December 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 99.5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 99.5 MW |
| Winter Capacity | 99.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 17 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 17 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V162-5.6 |
| Design Wind Speed | 19.7 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 390.4 |
White Rock West Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #513 | Buffalo Gap 2 Wind Farm | Merkel, TX | 355.8 GWh |
| #514 | Colorado Highlands Wind | Fleming, CO | 355.0 GWh |
| #515 | Buckthorn Wind | Mingus, TX | 354.3 GWh |
| #516 | Settlers Trail Wind Farm LLC | Sheldon, IL | 353.9 GWh |
| #517 | Spring Valley Wind Project | Ely, NV | 353.9 GWh |
| #518 | Bitter Ridge Wind Farm, LLC | Redkey, IN | 353.9 GWh |
| #519 | Tule Wind LLC | Boulevard, CA | 353.7 GWh |
| #520 | Pine River Wind Park | Shepherd, MI | 352.8 GWh |
| #521 | High Lonesome Mesa LLC | Willard, NM | 351.7 GWh |
| #522 | Garden Wind LLC | Zearing, IA | 351.7 GWh |
| #524 | Baron Winds Farm | Cohocton, NY | 350.8 GWh |
| #525 | Fenton Wind Farm | Chandler, MN | 350.1 GWh |
| #526 | Los Vientos Wind 1B | Sebastian, TX | 349.3 GWh |
| #527 | Hopkins Ridge Wind | Dayton, WA | 349.3 GWh |
| #528 | Crescent Wind Park | Hillsdale, MI | 347.8 GWh |
| #529 | Crossroads Wind Farm | Canton, OK | 347.6 GWh |
| #530 | Blue Summit II Wind | Vernon, TX | 346.3 GWh |
| #531 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
| #532 | Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh |
| #533 | Midland Wind | Kewane, IL | 343.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding White Rock West Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anadarko Plant | Anadarko, OK | 846.7 GWh | 8.3 mi |
| Blue Canyon Windpower | Carnegie, OK | 39.6 GWh | 19.8 mi |
| Blue Canyon Windpower II | Carnegie, OK | 543.1 GWh | 20.9 mi |
| Blue Canyon Windpower V LLC | Carnegie, OK | 262.8 GWh | 14.9 mi |
| Blue Canyon Windpower VI LLC | Carnegie, OK | 163.5 GWh | 17.6 mi |
| Caddo Wind | Apache, OK | 959.7 GWh | 7.3 mi |
| Comanche (OK) | Lawton, OK | 500.6 GWh | 29.5 mi |
| Cyril | Cyril, OK | 8.4 GWh | 5 mi |
| Drift Sand Wind Project LLC | Rush Springs, OK | 335.1 GWh | 19.5 mi |
| Minco Wind I, LLC | Minco, OK | 304.9 GWh | 26.9 mi |
| Minco Wind II, LLC | Minco, OK | 251.0 GWh | 26.9 mi |
| Minco Wind III, LLC | Minco, OK | 362.5 GWh | 28.3 mi |
| Minco Wind IV, LLC | Hinton, OK | 471.3 GWh | 28.6 mi |
| Pine Ridge | Apache, OK | 5.4 GWh | 11.1 mi |
| Redbed Plains Wind Farm | Tuttle, OK | 342.5 GWh | 31.9 mi |
| Rush Springs Wind | Marlow, OK | 877.3 GWh | 31.2 mi |
| Southwestern | Anadarko, OK | 779.4 GWh | 10.7 mi |
| Tuttle | Tuttle, OK | 4.2 GWh | 31.1 mi |
| WFEC GenCo LLC | Anadarko, OK | 83.7 GWh | 8.2 mi |
| White Rock East Wind Project | Anadarko, OK | 614.3 GWh | 4.1 mi |