HEB00109
9710 Katy Freeway, Katy, TX 77055Plant Summary Information
HEB00109 is ranked #226 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
HEB00109 is comprised of 3 generators and generated 76.3 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | HEB00109 |
---|---|
Utility Name | Texas Microgrid, LLC |
Location | Harris County, TX |
Initial Operation Date | May 2018 |
Last Update | Dec 2023 |
Annual Generation | 346.0 MWh |
Annual Consumption | 5.4 k MMBtu |
Ranked #11,138 out of 11,836 Power Plants Nationwide | |
Ranked #2,006 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #663 out of 749 Texas Power Plants | |
Ranked #226 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of HEB00109
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HEB00109.
Monthly Net Generation for HEB00109
HEB00109 Details
Summary Information | |
---|---|
Plant Name | HEB00109 (65268) |
Plant Address | 9710 Katy Freeway, Katy, TX 77055 |
Utility | Texas Microgrid, LLC (64449) |
Latitude, Longitude | 29.78616, -95.5394 |
Generation Dates on File | Jan 2021 to Dec 2023 |
Initial Operation Date | May 2018 |
Annual Generation | 346.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CENTERPOINT ENERGY |
Natural Gas Storage | No |
Generator H1091 Details Operating May 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H1092 Details Operating May 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H1093 Details Operating May 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
HEB00109 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1996 | WAL536 | Abilene, TX | 362.0 MWh |
#1997 | WAL3390 | The Woodlands, TX | 361.0 MWh |
#1998 | Barber Creek | Gillette, WY | 359.0 MWh |
#1999 | WAL266 | Grapevine, TX | 358.0 MWh |
#2000 | WAL284 | Mansfield, TX | 356.0 MWh |
#2001 | City of Hayward WWTP | Hayward, CA | 10.3 GWh |
#2002 | WAL5316 | Saginaw, TX | 354.0 MWh |
#2003 | WAL4509 | Tarrant, TX | 353.0 MWh |
#2004 | WAL896 | Grand Prairie, TX | 352.0 MWh |
#2005 | Coit GT | Columbia, SC | 400.0 MWh |
#2007 | HEB00099 | Houston, TX | 345.0 MWh |
#2008 | Alamosa | Alamosa, CO | 7.8 GWh |
#2009 | Centech Gas Generator | Shrewsbury, MA | 340.0 MWh |
#2010 | Waterloo | Waterloo, IL | 462.0 MWh |
#2011 | WAL940 | Westworth Village, TX | 338.0 MWh |
#2012 | WAL1103 | Houston, TX | 338.0 MWh |
#2013 | WAL5116 | Deer Park, TX | 338.0 MWh |
#2014 | HEB00028 | League City, TX | 338.0 MWh |
#2015 | WAL5480 | Round Rock, TX | 334.0 MWh |
#2016 | Univ of Oregon Central Power Station | Eugene, OR | 527.7 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HEB00109.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Clara | Houston, TX | 707.0 MWh | 4.2 mi |
Friendswood Energy | Houston, TX | 88.2 GWh | 11 mi |
HEBHoustonDistributionCenter | Houston, TX | 6.8 GWh | 3.7 mi |
HEBSnackPlant | Houston, TX | 645.0 MWh | 4 mi |
HO Clarke Generating | Houston, TX | 421.8 GWh | 11.1 mi |
OTHERNFBWA | Houston, TX | 178.0 MWh | 7.3 mi |
Rice University | Houston, TX | 18.6 GWh | 9.7 mi |
T H Wharton | Houston, TX | 728.8 GWh | 10.8 mi |
TECO CHP-1 | Houston, TX | 106.3 GWh | 10.2 mi |
The Methodist Hospital, Gas Turbine | Houston, TX | 13.8 GWh | 9.9 mi |
WAL1040 | Houston, TX | 388.0 MWh | 9.2 mi |
WAL2257 | Houston, TX | 404.0 MWh | 5 mi |
WAL3297 | Houston, TX | 402.0 MWh | 10 mi |
WAL3302 | Houston, TX | 369.0 MWh | 7.5 mi |
WAL3584 | Houston, TX | 297.0 MWh | 6.2 mi |
WAL4526 | Houston, TX | 249.0 MWh | 10.2 mi |
WAL4538 | Katy, TX | 189.0 MWh | 10.9 mi |
WAL768 | Katy, TX | 230.0 MWh | 11 mi |
WAL772 | Houston, TX | 287.0 MWh | 7.8 mi |
Westhollow Technology Center | Houston, TX | 21.8 GWh | 7.2 mi |