HEB00057

1145 Waldron Rd., Corpus Christi, TX 78418

Plant Summary Information

HEB00057 is ranked #226 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.

HEB00057 is comprised of 3 generators and generated 59.6 MWh during the 3-month period between September 2024 to December 2024.

Plant NameHEB00057
Utility NameTexas Microgrid, LLC
LocationNueces County, TX
Initial Operation DateOctober 2017
Last Update Dec 2024
Annual Generation 266.0 MWh
Annual Consumption 4.1 k MMBtu
Ranked #11,839 out of 12,539 Power Plants Nationwide
Ranked #2,019 out of 2,243 Natural Gas Power Plants Nationwide
Ranked #688 out of 799 Texas Power Plants
Ranked #226 out of 314 Texas Natural Gas Power Plants
Fuel Types Natural Gas

Map of HEB00057

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HEB00057.

Create Your Account Today

Monthly Net Generation for HEB00057

HEB00057 Details

Summary Information
Plant NameHEB00057 (65265)
Plant Address1145 Waldron Rd., Corpus Christi, TX 78418
UtilityTexas Microgrid, LLC (64449)
Latitude, Longitude27.66505, -97.28064
Generation Dates on FileJan 2021 to Dec 2024
Initial Operation DateOctober 2017
Annual Generation 266.0 MWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerAEP Texas Central Company (3278) TX
Grid Voltage 138.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)CORPUS CHRISTI GAS DIV
Natural Gas StorageNo

Generator H0571 Details Operating October 2017

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.4 MW
Nameplate Power Factor0.8
Summer Capacity0.4 MW
Winter Capacity0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Switch Between Oil And Natural GasNo

Generator H0572 Details Operating October 2017

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.4 MW
Nameplate Power Factor0.8
Summer Capacity0.4 MW
Winter Capacity0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Switch Between Oil And Natural GasNo

Generator H0573 Details Operating October 2017

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.4 MW
Nameplate Power Factor0.8
Summer Capacity0.4 MW
Winter Capacity0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Switch Between Oil And Natural GasNo

HEB00057 Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#2009WAL3518Laredo, TX280.0 MWh
#2010HEB00594The Woodlands, TX279.0 MWh
#2011HEB00048Beaumont, TX278.0 MWh
#2012WAL452Mcallen, TX277.0 MWh
#2013WAL3500Houston, TX276.0 MWh
#2014WAL5165Alamo, TX275.0 MWh
#2015MacArthur Waste to Energy FacilityRonkonkoma, NY55.6 GWh
#2016Barber CreekGillette, WY273.0 MWh
#2017WAL456Brownsville, TX272.0 MWh
#2018WAL6929Temple, TX271.0 MWh
#2020WAL5116Deer Park, TX263.0 MWh
#2021WAL3302Houston, TX259.0 MWh
#2022WAL5480Round Rock, TX259.0 MWh
#2023New HamptonNew Hampton, IA676.0 MWh
#2024WAL447Del Rio, TX255.0 MWh
#2025WAL2993Sugar Land, TX255.0 MWh
#2026WAL3285Cedar Hill, TX255.0 MWh
#2027WAL849Spring, TX254.0 MWh
#2028HEB00020Cypress, TX254.0 MWh
#2029Olmsted Waste EnergyRochester, MN46.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding HEB00057.

Plant NamePlant LocationAnnual GenerationDistance
Baffin WindSarita, TX276.6 GWh38.5 mi
Barney M DavisCorpus Christi, TX1.5 TWh4.5 mi
Chapman Ranch Wind ICorpus Christi, TX518.0 GWh14.4 mi
Corpus ChristiCorpus Christi, TX54.6 GWh21.8 mi
Corpus Christi Energy CenterCorpus Christi, TX2.5 TWh13.7 mi
Corpus RefineryCorpus Christi, TX280.5 GWh19 mi
Cranell Wind Farm LLCTBD, TX588.6 GWh38.2 mi
El Algodon Alto Wind Farm, LLCMathis, TX668.2 GWh36.2 mi
Gregory Power PlantGregory, TX552.7 GWh15.6 mi
HEB00069Corpus Christi, TX356.0 MWh2.3 mi
HEBCCBakeryCorpus Christi, TX802.0 MWh13.9 mi
Ingleside CogenerationHouston, TX2.8 TWh15.2 mi
Midway Wind, LLCTaft, TX418.5 GWh20.1 mi
Nueces BayCorpus Christi, TX1.7 TWh13.6 mi
Papalote Creek I LLCTaft, TX335.8 GWh21.8 mi
Papalote Creek II LLCTaft, TX507.1 GWh22.9 mi
Patriot Wind FarmBishop, TX675.3 GWh22.8 mi
Peacock Energy ProjectTaft, TX252.1 GWh24.1 mi
Ticona Polymers IncBishop, TX264.7 GWh33.8 mi
Valero Refinery Corpus Christi WestCorpus Christi, TX85.5 GWh16.2 mi