Valero Refinery Corpus Christi West
5900 Up River Rd, Corpus Christi, TX 78469Plant Summary Information
Valero Refinery Corpus Christi West is ranked #8 out of 13 petroleum coke power plants nationwide in terms of total annual net electricity generation.
Valero Refinery Corpus Christi West is comprised of 3 generators and generated 19.7 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Valero Refinery Corpus Christi West |
|---|---|
| Utility Name | Valero Refining Co |
| Location | Nueces County, TX |
| Initial Operation Date | September 1983 |
| Last Update | Oct 2025 |
| Annual Generation | 82.5 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #3,616 out of 12,553 Power Plants Nationwide | |
| Ranked #8 out of 13 Petroleum Coke Power Plants Nationwide | |
| Ranked #503 out of 804 Texas Power Plants | |
| Ranked #1 out of 2 Texas Petroleum Coke Power Plants | |
| Fuel Types | Petroleum Coke : 42.3% Other Gas : 39.8% Natural Gas : 17.8% |
Map of Valero Refinery Corpus Christi West
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Valero Refinery Corpus Christi West.
Monthly Net Generation for Valero Refinery Corpus Christi West
Valero Refinery Corpus Christi West Details
| Summary Information | |
|---|---|
| Plant Name | Valero Refinery Corpus Christi West (50121) |
| Plant Address | 5900 Up River Rd, Corpus Christi, TX 78469 |
| Utility | Valero Refining Co (19685) |
| Latitude, Longitude | 27.8175, -97.4814 |
| Generation Dates on File | Jan 2001 to Oct 2025 |
| Initial Operation Date | September 1983 |
| Annual Generation | 82.5 GWh |
| Fuel Types | Petroleum Coke : 42.3% Other Gas : 39.8% Natural Gas : 17.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 83-254-000 |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 83-254-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Petroleum Refineries (32411) |
| Sector | Industrial Non-CHP (6) |
| Water Source | Cooling |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Natural Gas Storage | No |
Generator TG1 Details Operating November 1983
| Technology | Petroleum Coke |
|---|---|
| Prime Mover | Steam Turbine |
| Unit Code | TG |
| Ownership | Single Owner |
| Nameplate Capacity | 28.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 26.6 MW |
| Winter Capacity | 26.9 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1983 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Petroleum Coke / Other Gas / Natural Gas |
| Startup Source | Waste Heat |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Fluidized Bed Technology | Yes |
| Supercritical Technology | Yes |
| Multiple Fuels | Yes |
Generator TG2 Details Operating November 1983
| Technology | Petroleum Coke |
|---|---|
| Prime Mover | Steam Turbine |
| Unit Code | TG |
| Ownership | Single Owner |
| Nameplate Capacity | 28.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 26.6 MW |
| Winter Capacity | 26.9 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1983 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Petroleum Coke / Other Gas / Natural Gas |
| Startup Source | Waste Heat |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Fluidized Bed Technology | Yes |
| Supercritical Technology | Yes |
| Multiple Fuels | Yes |
Generator PRU Details Operating September 1983
| Technology | All Other |
|---|---|
| Prime Mover | Steam Turbine |
| Unit Code | TG |
| Ownership | Single Owner |
| Nameplate Capacity | 12 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 12 MW |
| Winter Capacity | 12 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1983 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Waste Heat |
| Startup Source | Waste Heat |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Valero Refinery Corpus Christi West Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Petroleum Coke.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Monroe (MI) | Monroe, MI | 15.7 TWh |
| #2 | Northside Generating Station | Jacksonville, FL | 2.7 TWh |
| #3 | FirstEnergy Bay Shore | Oregon, OH | 1.0 TWh |
| #4 | Yellowstone Energy LP | Billings, MT | 458.2 GWh |
| #5 | Brame Energy Center | Lena, LA | 2.6 TWh |
| #6 | Alpena Cement Plant | Alpena, MI | 179.4 GWh |
| #7 | Savannah River Mill | Rincon, GA | 133.4 GWh |
| #9 | Seadrift Coke LP | Port Lavaca, TX | 34.8 GWh |
| #10 | Manitowoc | Manitowoc, WI | 190.6 GWh |
| #11 | University of Northern Iowa | Cedar Falls, IA | 21.0 GWh |
| #12 | Northampton Generating Company LP | Northampton, PA | 539.4 GWh |
| #13 | Toledo Ref Power Recovery Train | Oregon, OH | 81.5 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Valero Refinery Corpus Christi West.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barney M Davis | Corpus Christi, TX | 1.5 TWh | 17.9 mi |
| Blackjack Creek Wind Farm | Skidmore, TX | 544.2 GWh | 27.1 mi |
| Chapman Ranch Wind I | Corpus Christi, TX | 518.0 GWh | 15.6 mi |
| Corpus Christi | Corpus Christi, TX | 54.6 GWh | 7 mi |
| Corpus Christi Energy Center | Corpus Christi, TX | 2.4 TWh | 3.3 mi |
| Corpus Refinery | Corpus Christi, TX | 280.5 GWh | 3 mi |
| Cranell Wind Farm LLC | TBD, TX | 578.5 GWh | 26.4 mi |
| El Algodon Alto Wind Farm, LLC | Mathis, TX | 661.4 GWh | 20.1 mi |
| Gregory Power Plant | Gregory, TX | 577.5 GWh | 14.5 mi |
| HEB00057 | Corpus Christi, TX | 266.0 MWh | 16.2 mi |
| HEB00069 | Corpus Christi, TX | 356.0 MWh | 15.8 mi |
| HEBCCBakery | Corpus Christi, TX | 802.0 MWh | 2.5 mi |
| Ingleside Cogeneration | Houston, TX | 2.9 TWh | 15.3 mi |
| Midway Wind, LLC | Taft, TX | 418.0 GWh | 14.6 mi |
| Nueces Bay | Corpus Christi, TX | 1.8 TWh | 3.8 mi |
| Papalote Creek I LLC | Taft, TX | 335.8 GWh | 8.5 mi |
| Papalote Creek II LLC | Taft, TX | 503.6 GWh | 16.7 mi |
| Patriot Wind Farm | Bishop, TX | 671.0 GWh | 19 mi |
| Peacock Energy Project | Taft, TX | 282.2 GWh | 13.9 mi |
| Ticona Polymers Inc | Bishop, TX | 264.7 GWh | 27 mi |